Search Header Logo

Cold Water phase 2

Authored by Eugene Schutte

Other

12th Grade

Used 4+ times

Cold Water phase 2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of conducting a soundness test on cold water systems according to industry requirements?

To check the temperature of the water

To inspect the color of the water

To assess the integrity of pipework and components

To measure the flow rate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to prepare a cold water system for a soundness test?

Heat the water to a specified temperature

Perform a visual inspection to confirm readiness

Add specific chemicals to the water

Drain all water from the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a requirement when commissioning cold water systems?

Identifying educational resources

Identifying information sources required for testing and commissioning

Consulting a legal advisor

Reviewing architectural blueprints

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What involves the use of system additives in cold water systems?

Soundness testing

Visual inspection

Flushing requirements

Filling and venting

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is described in the process of filling and venting cold water systems?

Removing air from the system

Checking for leaks

Adding additives to the system

Testing water pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum internal water pressure that all water fittings should withstand according to the Water Supply (Water fittings) Regulations 1999?

1.0 times the maximum operating pressure

1.5 times the maximum operating pressure

2.0 times the maximum operating pressure

2.5 times the maximum operating pressure

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should the final test on water fittings be conducted according to the regulations?

Before the installation begins

After the installation and after all builders work has been completed

Only if there is visible damage to the pipework

Periodically every year

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?