Marina Bay Sands Construction Quiz

Marina Bay Sands Construction Quiz

12th Grade

8 Qs

quiz-placeholder

Similar activities

Ceramics

Ceramics

12th Grade

13 Qs

GAMING QUIZZ

GAMING QUIZZ

7th Grade - Professional Development

13 Qs

Adobe Photoshop Essentials Quiz

Adobe Photoshop Essentials Quiz

12th Grade

10 Qs

Flower Elements

Flower Elements

9th - 12th Grade

10 Qs

Curious Life of Mars Rover

Curious Life of Mars Rover

9th - 12th Grade

14 Qs

Topic 6: Function + Form

Topic 6: Function + Form

12th Grade

10 Qs

Siblings.     Jenni Rivera

Siblings. Jenni Rivera

1st Grade - University

10 Qs

Spider-Man And Venom

Spider-Man And Venom

4th Grade - University

10 Qs

Marina Bay Sands Construction Quiz

Marina Bay Sands Construction Quiz

Assessment

Interactive Video

Design

12th Grade

Hard

Created by

JUAN SANTA ANA

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the Sky Park in the Marina Bay Sands project?

To serve as a helipad

To act as a solar energy collector

To provide a large recreational area

To house additional hotel rooms

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the main problem with the marine clay at the construction site?

It was located too deep underground

It was contaminated with chemicals

It had poor structural properties

It was too hard to dig through

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did engineers stabilize the sloping towers during construction?

By using lightweight materials

By using temporary struts and tension cables

By building additional support towers

By reducing the height of the towers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the impact of the 2008 financial crisis on the Marina Bay Sands project?

The project was canceled

The budget was increased

Construction was delayed

New contractors were hired

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did engineers ensure the stability of the drift sculpture in the atrium?

By placing it on the ground floor

By using magnetic levitation

By using a temporary lifting frame and box truss

By reducing its weight

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What innovative solution was used to handle potential typhoon winds affecting the Sky Park?

Installing wind turbines

Using movement joints and multidirectional steel bearings

Building a wind barrier

Reducing the height of the Sky Park

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What method was used to lift the large segments of the Sky Park into place?

Manual labor

Helicopter lifting

Strand jacking

Hydraulic cranes

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of the secondary system of movement joints in the Sky Park swimming pool?

To prevent water leakage due to tower movements

To reduce the weight of the pool

To create separate swimming areas

To allow for expansion during hot weather