Marina Bay Sands Construction Quiz

Marina Bay Sands Construction Quiz

12th Grade

8 Qs

quiz-placeholder

Similar activities

Customer Relationship Management & Live Chat

Customer Relationship Management & Live Chat

12th Grade - Professional Development

10 Qs

Theory Quiz 1: Woods

Theory Quiz 1: Woods

7th - 12th Grade

10 Qs

How to make slime

How to make slime

KG - Professional Development

7 Qs

Engineering Design Process (short)

Engineering Design Process (short)

9th - 12th Grade

10 Qs

Information Architecture & Gestalt Principles

Information Architecture & Gestalt Principles

12th Grade

14 Qs

Perspektywa

Perspektywa

9th - 12th Grade

12 Qs

Detail Drawings Quiz

Detail Drawings Quiz

10th - 12th Grade

12 Qs

ITAA unit 4: CSS Layout

ITAA unit 4: CSS Layout

9th - 12th Grade

7 Qs

Marina Bay Sands Construction Quiz

Marina Bay Sands Construction Quiz

Assessment

Interactive Video

Design

12th Grade

Practice Problem

Hard

Created by

JUAN SANTA ANA

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the Sky Park in the Marina Bay Sands project?

To serve as a helipad

To act as a solar energy collector

To provide a large recreational area

To house additional hotel rooms

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the main problem with the marine clay at the construction site?

It was located too deep underground

It was contaminated with chemicals

It had poor structural properties

It was too hard to dig through

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did engineers stabilize the sloping towers during construction?

By using lightweight materials

By using temporary struts and tension cables

By building additional support towers

By reducing the height of the towers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the impact of the 2008 financial crisis on the Marina Bay Sands project?

The project was canceled

The budget was increased

Construction was delayed

New contractors were hired

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did engineers ensure the stability of the drift sculpture in the atrium?

By placing it on the ground floor

By using magnetic levitation

By using a temporary lifting frame and box truss

By reducing its weight

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What innovative solution was used to handle potential typhoon winds affecting the Sky Park?

Installing wind turbines

Using movement joints and multidirectional steel bearings

Building a wind barrier

Reducing the height of the Sky Park

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What method was used to lift the large segments of the Sky Park into place?

Manual labor

Helicopter lifting

Strand jacking

Hydraulic cranes

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?