Search Header Logo

7. Inspection & Testing Mock

Authored by Sayed Habib

Professional Development

Professional Development

Used 2+ times

7. Inspection & Testing Mock
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should all documentation given after initial verification be kept in a safe place?

Adds value if selling the property

To reduce insurance premiums

As reference for any persons inspecting any work at a later date

To comply with any local authority inspections

Answer explanation

To comply with any local authority inspections

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For safety reasons, what is the recognised status for undertaking and signing off inspection and test work?

a skilled person

an instructed person

a person qualified in PAT testing

a person who is a member of the IET

Answer explanation

To undertake and sign off inspection and test work for safety reasons, the recognized status required is a skilled person.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On which two documents is prospective fault current recorded?

Minor Electrical Installation Works Certificate and Schedule of Inspections

Electrical Installation Certificate and Schedule of test results

Electrical Installation Certificate and Minor Electrical Installation Works Certificate

Schedule of Inspections and Schedule of test results

Answer explanation

Prospective fault current is recorded on the Electrical Installation Certificate and Schedule of test results.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is one of the documents that must accompany an Electrical Installation Certificate?

Minor Electrical Installation Works Certificate

Landlords safety certificate

Electrical indemnity certificate

Schedule of Inspections (Note: and Schedule of Test Results)

Answer explanation

One of the documents that must accompany an Electrical Installation Certificate is the Schedule of Inspections (Note: and Schedule of Test Results).

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On completion of electrical work, all appropriate documentation should be

Given to the building inspector

Retained by the electrician

Left next to the mains position

Given to the person ordering the work

Answer explanation

The appropriate documentation should be given to the person ordering the work to ensure all necessary records are maintained and accessible.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Functional testing may involve

Insulation resistance testing

Disconnecting an appliance

Turning on a light switch

Continuity testing

Answer explanation

Functional testing may involve turning on a light switch to check if it functions properly.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A check for phase sequence at the main intake to a three phase installation indicated a result of L1, L3, L2. The correct orientation at each subsequence distribution board is

L1, L3, L2

L2, L3, L1

L2, L1, L3

L3, L2, L1

Answer explanation

The correct orientation at each subsequence distribution board is L1, L3, L2 as indicated by the phase sequence result at the main intake.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development