Search Header Logo

LGTF 4

Authored by CE C.S.Prawinraj

Professional Development

University

8 Questions

Used 4+ times

LGTF 4
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

1.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___Gas is lead into loading arms from injection lines connected to the arms before cargo loading?

HC

H2S

Nitrogen

CO

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Air purge comes to an end when the oxygen content of the purged gas has dropped below ____

5%

2%

8%

1%

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

At a discharge port, the arms are cooled down by sending in LNG by

Ship's spray pump

Shore small capacity pump

Shore pump

None are correct

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Primary reason for cooling the cargo line is

minimize the possibility of leaks at joints

reduce the possibility of sudden shock loading

to avoid the formation of vapor locks in the pipelines

All are correct

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Ultrasonic gauges operate on a similar principle to

open gauging system

float gauges

echo sounders

All are correct

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Radar gauges works at very high frequencies - approximately ___

11 ghz

11 mhz

9 ghz

9 mhz

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

____is a small portion of LNG which is retained onboard following the cargo discharge to keep the cargo tanks cool.

Cargo trim

Cargo heel

Topping off cargo

Topping up cargo

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?