Prevention Vs. Inspection

Prevention Vs. Inspection

4th Grade

6 Qs

quiz-placeholder

Similar activities

KB Quiz

KB Quiz

1st - 10th Grade

9 Qs

Estimation Techniques

Estimation Techniques

4th Grade

8 Qs

Conflict Resolution Techniques

Conflict Resolution Techniques

4th Grade

7 Qs

Quality Vs. Grade

Quality Vs. Grade

4th Grade

7 Qs

Types of Contract

Types of Contract

4th Grade

7 Qs

Organizational Structures

Organizational Structures

4th Grade

7 Qs

1. PMP Sample Questions

1. PMP Sample Questions

4th Grade

7 Qs

PMP Quiz -01

PMP Quiz -01

1st - 5th Grade

10 Qs

Prevention Vs. Inspection

Prevention Vs. Inspection

Assessment

Quiz

Professional Development

4th Grade

Medium

Created by

Afghanistan Center

Used 1+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a project to develop new medical protocols for Aga Khan Foundation hospitals, the project manager wants to ensure that healthcare staff understands the new procedures and can implement them correctly from the start. What action should the project manager take to prevent problems from occurring?

Conduct regular audits to identify any deviations from protocols.

Develop detailed procedure manuals and provide training sessions.

Wait for issues to arise and then address them as they come up.

Perform quality checks on staff performance periodically.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During a health project aimed at reducing infection rates in hospitals, the project manager needs to identify and solve hygiene-related issues during the project. What action should the project manager take to inspect and address these issues?

Implement comprehensive training programs for hospital staff.

Conduct regular audits and checks on hospital hygiene practices.

Develop and distribute detailed hygiene procedure manuals.

Wait for complaints from patients to identify problems.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a project to roll out a new vaccination program, the project manager wants to ensure consistent and correct administration of vaccines to prevent any issues. What action should the project manager take?

Perform regular quality checks on vaccination records.

Develop detailed procedure manuals and conduct staff training programs.

Collect feedback from patients after vaccinations are administered.

Address any issues that arise during vaccination administration.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As part of a health project to improve patient safety, the project manager wants to ensure medical equipment is functioning correctly and identify issues promptly. What action should the project manager take?

Schedule regular training sessions for staff on equipment usage.

Develop detailed maintenance manuals for the equipment.

Perform regular quality checks on medical equipment.

Wait for equipment failure reports to address issues.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a healthcare project to implement electronic health records (EHR), the project manager aims to catch errors or issues early in the deployment. What inspection action should the project manager take?

Schedule periodic reviews and testing of the EHR system.

Provide comprehensive training for all EHR system users.

Develop detailed user manuals for the EHR system.

Collect user feedback after the EHR system is fully implemented.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During a project to upgrade a hospital’s diagnostic equipment, the project manager wants to ensure proper use and maintenance of the new equipment to prevent problems. What preventive action should the project manager take?

Schedule regular inspections of the diagnostic equipment.

Develop and distribute comprehensive training and operation standards.

Wait for maintenance issues to arise and then address them.

Perform quality checks on diagnostic results periodically.