The phases and deliverables of a system development life cycle project should be determined:
During the initial planning stages of the project.
After early planning has been completed but before work has begun
Throughout the work stages, based on risk and exposures
Only after all risk and exposures have been identified and the IS auditor has recommended appropriate controls
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the audit of an acquired software package, an IS auditor finds that the software purchase was based on information obtained through the Internet, rather than from responses to a request for proposal. The IS auditor should first:
Test the software for compatibility with existing hardware
Perform a gap analysis
Review the licensing policy
Ensure that the procedure had been approved.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Ideally, stress testing should be carried out in a
Test environment using test data
Production environment using live workloads
Test environment using live workloads
Production environment using test data
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Change control for business application systems being developed using prototyping could be complicated by the:
Iterative nature of prototyping.
Rapid pace of modifications in requirements and design
Emphasis on reports and screens
Lack of integrated tools
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The best time for an IS auditor to assess the control specifications of a new application software package which is being considered for acquisition is during:
The internal lab testing phase
Testing and prior to user acceptance
The requirements gathering process
The implementation phase
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following helps an information systems (IS) auditor evaluate the quality of new software that is developed and implemented?
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is the BEST approach to ensure that sufficient test coverage will be achieved for a project with a strict end date and a fixed time to perform testing?
Requirements should be tested in terms of importance and frequency of use.
Test coverage should be restricted to functional requirements
Automated tests should be performed using scripting
The number of required test runs should be reduced by retesting only defect fixes
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?