The phases and deliverables of a system development life cycle project should be determined:

During the initial planning stages of the project.

After early planning has been completed but before work has begun

Throughout the work stages, based on risk and exposures

Only after all risk and exposures have been identified and the IS auditor has recommended appropriate controls

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the audit of an acquired software package, an IS auditor finds that the software purchase was based on information obtained through the Internet, rather than from responses to a request for proposal. The IS auditor should first:

Test the software for compatibility with existing hardware

Perform a gap analysis

Review the licensing policy

Ensure that the procedure had been approved.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Ideally, stress testing should be carried out in a

Test environment using test data

Production environment using live workloads

Test environment using live workloads

Production environment using test data

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Change control for business application systems being developed using prototyping could be complicated by the:

Iterative nature of prototyping.

Rapid pace of modifications in requirements and design

Emphasis on reports and screens

Lack of integrated tools

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The best time for an IS auditor to assess the control specifications of a new application software package which is being considered for acquisition is during:

The internal lab testing phase

Testing and prior to user acceptance

The requirements gathering process

The implementation phase

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following helps an information systems (IS) auditor evaluate the quality of new software that is developed and implemented?

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the BEST approach to ensure that sufficient test coverage will be achieved for a project with a strict end date and a fixed time to perform testing?

  1. Requirements should be tested in terms of importance and frequency of use.

Test coverage should be restricted to functional requirements

Automated tests should be performed using scripting

The number of required test runs should be reduced by retesting only defect fixes

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?