In a project to build a new dam in Badakhshan, there is a high risk of flooding during the rainy season, which could significantly delay construction. What should the project manager do to avoid this risk?
Risk Response Strategies - Negative Risks

Quiz
•
Professional Development
•
4th Grade
•
Medium
Afghanistan Center
Used 12+ times
FREE Resource
6 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Proceed with construction and deal with delays as they occur
Move the construction schedule to avoid the rainy season
Purchase insurance to cover potential delays
Accept the risk and proceed without changes
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During a project to deliver clean drinking water in Samangan, there is a risk that the water pipes may burst due to high water pressure in certain areas. What should the project manager do to mitigate this risk?
Accept the risk and hope for the best
Use high-quality pipes designed to withstand high pressure
Transfer the risk by hiring a water management company
Avoid installing pipes in high-pressure areas
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a project to develop a new e-learning platform for universities in Parwan, there is a risk of cyber-attacks that could compromise student data. What should the project manager do to transfer this risk?
Enhance internal security measures
Accept the risk and monitor for breaches
Obtain cyber insurance to cover potential cyber-attacks
Avoid storing sensitive data on the platform
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a project to upgrade the power grid in Kapisa, there is a minor risk of temporary power outages during the transition. What should the project manager do to accept this risk?
Implement extensive safeguards to prevent outages
Transfer the risk by outsourcing the upgrade
Avoid upgrading the power grid to prevent outages
Proceed with the upgrade and plan for minor outages
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During a project to build a new airport in Zabul, there is a significant risk of regulatory changes that could impact project approval and implementation. What should the project manager do to escalate this risk?
Accept the risk and continue with the project as planned
Develop contingency plans for different regulatory scenarios
Bring the risk to the attention of higher management or stakeholders who can influence regulatory bodies
Avoid addressing the risk until changes occur
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a project to provide renewable energy solutions in Nuristan, there is a risk that the solar panels may not generate enough power during the winter months. What should the project manager do to mitigate this risk?
Use higher-efficiency solar panels and incorporate battery storage solutions
Accept the risk and proceed without changes
Transfer the risk by hiring an external energy consultant
Avoid using solar panels during the winter months
Similar Resources on Quizizz
8 questions
PMP Mindset Quiz

Quiz
•
4th Grade
6 questions
Quiz Manejo de Proyectos

Quiz
•
1st Grade - University
7 questions
1. PMP Sample Questions

Quiz
•
4th Grade
8 questions
Estimation Techniques

Quiz
•
4th Grade
7 questions
PMBoK - RISK MANAGEMENT

Quiz
•
1st - 12th Grade
6 questions
EVM Basic Terminology

Quiz
•
4th Grade
10 questions
Infection prevention and control

Quiz
•
1st Grade - Professio...
5 questions
Expected Monetary Value (Correct it)

Quiz
•
4th Grade
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade