004 Processes Quiz

004 Processes Quiz

Professional Development

20 Qs

quiz-placeholder

Similar activities

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Central Heating revision | 6035

Central Heating revision | 6035

Professional Development

22 Qs

Engineering Technology 7 Aug 2019 - Choose The Correct Picture

Engineering Technology 7 Aug 2019 - Choose The Correct Picture

Professional Development

20 Qs

What's in the Box?

What's in the Box?

Professional Development

17 Qs

What you know about Transformers

What you know about Transformers

Professional Development

15 Qs

6035 | Scientific Principles | LO1

6035 | Scientific Principles | LO1

Professional Development

15 Qs

6035 Hot Water Exam Test

6035 Hot Water Exam Test

Professional Development

24 Qs

HAND TOOL

HAND TOOL

Professional Development

20 Qs

004 Processes Quiz

004 Processes Quiz

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 16+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following parts of the Building Regulations deals with building structural strength?

Part A.

Part B.

Part F.

Part L.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be used to protect a customer's carpet?

Safety shoes.

Plywood.

Dust sheets.

Heat mat.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the name of the tool shown below?

Mole grips.

Stillson.

Basin wrench.

Spirit level.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does LCS stand for?

Long Coil Strand.

Low Carbon Steel.

Low Copper Steel.

Loose Cover Sheet.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the correct vertical clipping interval for 15 mm copper tube?

0.5m

1.2m

1.5m

2.0m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what point should an inhibitor be added to a central heating system during commissioning?

After the first flush.

Before flushing.

Before the final fill of the system.

Before cleaning the pipework.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which one of the following types of screw is shown in the image below?

Phillips.

Pozidrive.

Slotted.

Mirror.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?