Lean 8 Wastes Quiz

Lean 8 Wastes Quiz

University

19 Qs

quiz-placeholder

Similar activities

Scrum and Waterfall

Scrum and Waterfall

University

14 Qs

Operating Systems

Operating Systems

KG - University

20 Qs

Cost, Profit, and Waste Management Quiz

Cost, Profit, and Waste Management Quiz

University

14 Qs

OS Basics

OS Basics

University

20 Qs

Lean Manufacturing : System Model

Lean Manufacturing : System Model

University

16 Qs

DW (EM25) - Elementos y procesos de UX (T4)

DW (EM25) - Elementos y procesos de UX (T4)

University - Professional Development

18 Qs

Quiz sobre Metodologías de Desarrollo de Software

Quiz sobre Metodologías de Desarrollo de Software

12th Grade - University

20 Qs

Kuis IoT 2

Kuis IoT 2

University

20 Qs

Lean 8 Wastes Quiz

Lean 8 Wastes Quiz

Assessment

Quiz

Computers

University

Easy

Created by

Khalil Al-Masri

Used 1+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of Lean 8 Wastes?

Minimizing defects

Maximizing efficiency

Reducing waste

Increasing productivity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which waste category does overproduction fall under in Lean 8 Wastes?

Motion waste

Waiting waste

Overprocessing waste

Inventory waste

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the term used to describe unnecessary movement of people or equipment in Lean 8 Wastes?

Transportation waste

Motion waste

Waiting waste

Defect waste

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which waste refers to the time spent waiting for materials, information, or equipment in Lean 8 Wastes?

Overproduction waste

Transportation waste

Waiting waste

Inventory waste

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which waste category does excessive inventory belong to in Lean 8 Wastes?

Overprocessing waste

Defect waste

Inventory waste

Motion waste

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the term used for the unnecessary processing or steps taken that do not add value in Lean 8 Wastes?

Overproduction waste

Overprocessing waste

Transportation waste

Waiting waste

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which waste refers to the production of defective or faulty products in Lean 8 Wastes?

Overproduction waste

Defect waste

Transportation waste

Motion waste

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?