Variation in Construction Contracts

Authored by Muhammad Nasrol Jamal

Other

University

Variation in Construction Contracts
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Variation to the original work is almost certain to happen in construction projects due to:

Site Conditions

Statutory requirements

Change in Client’s requirements

Defective contract drawings, bills of quantities, specification, etc

Poor cost control e.g: omissions required due to shortage of fund

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Without variation clause, changes to the original contract are not allowed. If changes to the Works are necessary:

Separate contract has to be drawn up (e.g; for additional work)

A new contract has to be prepared to replace the existing contract (e.g; changes in design)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For contracts based on the bill of quantities, does the contractor have the right to claim variations for works not specified or measured in the bill of quantities?

Yes

No

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For contracts based on drawings and specifications, does the contractor have the right to claim variations for all works necessary to complete the project, even if these works are not shown in the drawings and described in the specifications?

Yes

No

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a Variation mean in the context of the work as described in the Contract Document?

Any change to the work

Only changes in quantity

Only changes in quality

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the types of variations of work mentioned?

Change of quantity of work

Change of quality of work

Removal of work executed onsite

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is included in a variation?

Change of works/materials

Change of contract terms

Change of project manager

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?