Boiler Clinic QZ-1

Authored by fredy adnansyah

Fun

Professional Development

Used 1+ times

Boiler Clinic QZ-1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

6 questions

Show all answers

1.

WORD CLOUD QUESTION

20 sec • Ungraded

Tulis Unit anda

Answer explanation

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Setiap berapa lama Pengukuran rutin untuk Monitoring Heatloss Boiler?

2 Bulan

3 Bulan

4 Bulan

5 Bulan

Answer explanation

Media Image

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Berapa maksimum temperature casing boiler pada saat beroperasi?

50 °c

60 °c

65 °c

70 °c

Answer explanation

Media Image

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Berapakah jarak ideal Pengukuran dengan thermal imager

1-3 meter

3-5 meter

5-10 meter

10-20 meter

Answer explanation

Media Image

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Manakah yang bukan bagian yang diminta dilakukan Pengukuran Monitoring Heatloss boiler

Casing depan

Casing samping

Casing atas

Casing bawah

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Apakah penyebab adanya kebocoran panas / Heatloss pada casing boiler?

Pecah tube

Carry over pada drum

Kerusakan batu / refraktori

Tingginya tekanan boiler

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?