1.
WORD CLOUD QUESTION
20 sec • Ungraded
Tulis Unit anda
Answer explanation
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Setiap berapa lama Pengukuran rutin untuk Monitoring Heatloss Boiler?
2 Bulan
3 Bulan
4 Bulan
5 Bulan
Answer explanation
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Berapa maksimum temperature casing boiler pada saat beroperasi?
50 °c
60 °c
65 °c
70 °c
Answer explanation
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Berapakah jarak ideal Pengukuran dengan thermal imager
1-3 meter
3-5 meter
5-10 meter
10-20 meter
Answer explanation
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Manakah yang bukan bagian yang diminta dilakukan Pengukuran Monitoring Heatloss boiler
Casing depan
Casing samping
Casing atas
Casing bawah
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Apakah penyebab adanya kebocoran panas / Heatloss pada casing boiler?
Pecah tube
Carry over pada drum
Kerusakan batu / refraktori
Tingginya tekanan boiler
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?