What is the first step when using a metric meter for testing an appliance?

Metric and Imperial Meter Quiz

Quiz
•
Professional Development
•
12th Grade
•
Hard
Tim McNeill
Used 1+ times
FREE Resource
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Record the reading and start the stopwatch
Turn off the appliance
Subtract the first reading from the second
Compare the reading against the appliance data badge
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How long should you wait before recording the second reading on a metric meter?
1 minute
2 minutes
5 minutes
10 minutes
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the formula for calculating the gas rate using a metric meter?
Two minutes of gas x 30
Two minutes of gas x 50
Two minutes of gas x 100
Two minutes of gas x 10
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the multiplier used for calculating the gross heat input with a metric meter?
288
317
100
200
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the multiplier used for calculating the net heat input with a metric meter?
288
317
100
200
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should you do after obtaining the readings from a metric meter?
Turn off the appliance
Compare the reading against the appliance data badge
Record the reading again
Wait for 5 minutes
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step when using an imperial meter for testing an appliance?
Record the reading and start the stopwatch
Turn off the appliance
Time one complete revolution of the red dial
Compare the reading against the appliance data badge