5 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is the primary role of a Quantity Surveyor?

a) Designing buildings

b) Managing construction sites

c) Estimating construction costs

d) Supervising construction workers

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a common method of measuring concrete work?

a) Square meter method

b) Cubic meter method

c) Linear meter method

d) Lump sum method

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a Bill of Quantities (BOQ)?

A) A fixed amount for additional works.

B) An allowance for minor changes in project scope.

B) To provide a breakdown of labor costs only.

D) To outline the scope of work and provide a cost estimate for a project.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is typically not included in preliminary costs?

A) Site establishment

B) Contractor’s overheads

C) Labor costs

D) Insurance

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is used to determine the cost of excavation work?

A) Volume of soil to be excavated

B) Number of laborers on-site

C) Type of foundation used

D) The duration of the project

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?