What is the primary role of a Quantity Surveyor?
a) Designing buildings
b) Managing construction sites
c) Estimating construction costs
d) Supervising construction workers
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a common method of measuring concrete work?
a) Square meter method
b) Cubic meter method
c) Linear meter method
d) Lump sum method
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main purpose of a Bill of Quantities (BOQ)?
A) A fixed amount for additional works.
B) An allowance for minor changes in project scope.
B) To provide a breakdown of labor costs only.
D) To outline the scope of work and provide a cost estimate for a project.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is typically not included in preliminary costs?
A) Site establishment
B) Contractor’s overheads
C) Labor costs
D) Insurance
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is used to determine the cost of excavation work?
A) Volume of soil to be excavated
B) Number of laborers on-site
C) Type of foundation used
D) The duration of the project
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?