1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a requirement for a plumbing system after installation?
It must be sound.
It must be flushed through.
It must be painted.
It must be commissioned.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a necessary step after installing pipework?
Painting
Flushing through
Insulating
Expanding
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step before carrying out a soundness test?
Measure the pipe length
Walk around the system
Check the water flow
Inspect the pipe color
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the soundness test?
To check for leaks
To measure pipe length
To assess water quality
To evaluate pipe color
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in soundness testing for rigid pipes?
Attach the hydraulic test bucket
Walk around the system and check for leaks
Slowly fill the system with water
Pump system up to 1.5 x working pressure
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How long should you wait after pumping the system to 1bar before checking for pressure loss?
15 minutes
30 minutes
45 minutes
60 minutes
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the significance of maintaining pressure for a specific time during the test?
To ensure system stability
To check for leaks
To allow for pressure loss detection
To fill the system with water
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?