
Receipting and Receiving
Authored by MCCSSS GSS
Other
Professional Development
Used 27+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
21 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the logical sequence of events for the receiving process?
Quality
Quantity
Discrepancies
Physical Inspection
DD 1348 -1A
NAVMC 11869
Physical Inspection
Data Recording
Item to Documentation
D6T
COR
DATE
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the four actions that must happen during Physical Verification?
-Check AAC
-Check External Package
-Check Internal Pakage
-Open box to retrieve material and documentation
-Check the condition Code
-Check internal box
-retrieve documentation
-Do not open box
-Receive for item without checking
-Open box to retrieve document
-Issue to customer
-File receipt
-Sign document
-Issue to customer
-File 1348
-Add destroy date
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the five annotations required for item-to-documentation?
Rank
Section
Unit Name
Initials
Dates
Names
Rank
dates
signatures
D6T
D6T
COR
Dates
Signatures
Initials
Quantity
Quality
Discrepancies
Dates
Signatures
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the name of the documentation that Supply must validate to ensure the customer is authorized to sign for the material on behalf of their section
DD FORM 1348
Delegation of Authority or NAVMC 11869
Delegation of Supervision
NAVMC 11896
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where on the DD-FORM 1348, you will annotate the destruction date?
Upper right hand corner
bottom left corner
upper left corner
Block 10 on the 1348
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which box on 1348 that you must annotate the quantity actually received
Block 2
Block 22
Block 15
Block 10
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
You are the DASF clerk and have received a verified DD-1348-1A from the receiving point. What do you annotate or stamp on the DD-1348-1A when it is receipted for in GCSS-MC?
D6T, Date, Serial #
D6T, Date, Initials
COR, Date, Initials
COR, Dates, Names
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?