Module 27112 Exam - Ceiling and Roof Framing
Authored by Jason Jones
Other
12th Grade
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following building components keeps opposite walls from spreading apart?
Trimmer studs
Rafters
Ceiling joists
Purlins
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To transfer roof loads to the foundation, ceiling joists are usually installed _____.
on a doubled top plate
between pairs of wall studs
directly over wall studs
with metal anchor plates
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When ceiling joists must be overlapped above a loadbearing partition, the overlap must be at least _____.
3"
6"
12"
18"
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of roof labeled F is a _____.
gable roof
shed roof
gambrel roof
gable-and-valley roof
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of roof labeled B is a _____
gable roof
gambrel roof
mansard roof
hip roof
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of roof labeled E is a _____
gable roof
hip-and-valley roof
mansard roof
gable-and-valley roof
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Letter E is pointing to a _____
hip rafter
valley jack rafter
valley rafter
hip jack rafter
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?