Module 27112 Exam - Ceiling and Roof Framing

Authored by Jason Jones

Other

12th Grade

Used 3+ times

Module 27112 Exam - Ceiling and Roof Framing
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following building components keeps opposite walls from spreading apart?

Trimmer studs

Rafters

Ceiling joists

Purlins

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To transfer roof loads to the foundation, ceiling joists are usually installed _____.

on a doubled top plate

between pairs of wall studs

directly over wall studs

with metal anchor plates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When ceiling joists must be overlapped above a loadbearing partition, the overlap must be at least _____.

3"

6"

12"

18"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled F is a _____.

gable roof

shed roof

gambrel roof

gable-and-valley roof

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled B is a _____

gable roof

gambrel roof

mansard roof

hip roof

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled E is a _____

gable roof

hip-and-valley roof

mansard roof

gable-and-valley roof

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Letter E is pointing to a _____

hip rafter

valley jack rafter

valley rafter

hip jack rafter

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?