NERC standards

NERC standards

Professional Development

7 Qs

quiz-placeholder

Similar activities

Boas práticas: Higienização.

Boas práticas: Higienização.

1st Grade - Professional Development

10 Qs

Quiz sobre Ondas

Quiz sobre Ondas

Professional Development

10 Qs

Elementos de Eletrostática

Elementos de Eletrostática

Professional Development

7 Qs

Atividades proposta.

Atividades proposta.

12th Grade - Professional Development

11 Qs

idek

idek

KG - Professional Development

8 Qs

Definição de fluido

Definição de fluido

University - Professional Development

6 Qs

Cálculos I: Formulações e densidade

Cálculos I: Formulações e densidade

1st Grade - Professional Development

10 Qs

4.1 Circuitos Elétricos - Elementos dos Circuitos - Évio

4.1 Circuitos Elétricos - Elementos dos Circuitos - Évio

Professional Development

10 Qs

NERC standards

NERC standards

Assessment

Quiz

Physics

Professional Development

Medium

Created by

Jenn Leyva

Used 11+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Which COM standards are subject to enforcement? Mark ALL that apply.

COM-001-0

COM-001-3

COM-002-4

COM-003-3

2.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Which functional entities are subject to NERC COM-001-3? Mark ALL that apply.

Transmission Operator

Balancing Authority

Reliability Coordinator

Distribution Provider

Generator Operator

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

COM-001-3 R1 states "Each ___ shall have Interpersonal Communication capability with the following entities..."

Reliability Coordinator

Transmission Operators

Balancing Authorities

Intercommection

4.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Which of the following are considered "measures" (evidence) for R1 of COM-001-3? Mark ALL that apply.

physical assets

operator logs

voice recordings

installation documentation

Cisco receipts

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is an enforceable standard for Event Reporting?

EOP-001-0

EOP-004-4

EOP-004-6

EOP-001-2b

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

At what amount of time must RCs, BAs and TOPS report loss of monitoring or control capability at its staffed BES control center?

(*hint* page 9)

30 minutes

2 hours

1 minute

15 minutes

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

True of False: EOP-004-4 includes the phrase "Royal Canadian Mounted Police"

True

False

Answer explanation

Media Image