1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following statements is true?
Impact analysis is useful for confirmation testing during maintenance testing
Confirmation testing is useful for regression testing during system design
Impact analysis is useful for regression testing during maintenance testing
Confirmation testing is useful for impact analysis during maintenance testing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For which of the following situations is exploratory testing suitable?
When time pressure requires speeding up the execution of tests already specified
When the system is developed incrementally, and no test charter is available
When testers are available who have enough knowledge of similar applications and technologies
When in advance knowledge of the system already exists, and evidence is to be provided that it should be tested intensively
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Match the following:
1. Test estimation
2. Test control
3. Test monitoring
-
a. Measures of tracking process
b. Effort required to perform activities
c. Reallocation of resources
1-b, 2-c, 3-a
1-b, 2-a, 3-c
1-c, 2-a, 3-b
1-a, 2-b, 3-c
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following is MOST likely to be a benefit of test execution tools?
It is easy to create regression tests.
It is easy to maintain version control of test assets.
It is easy to design tests for security testing.
It is easy to run regression tests.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many test cases are required to cover 100% 0 – switch coverage respectively from X2?
4
1
3
2
6.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
From a Testing perspective, what are the MAIN purposes of Configuration Management?
Identifying the version of software under test.
Controlling the version of testware items.
Developing new testware items.
Tracking changes to testw are items.
Analysing the need for new testware items.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a MAJOR task of test planning?
Scheduling test analysis and design tasks.
Initiating corrective actions.
Monitoring progress and test coverage.
Measuring and analyzing results.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?