CEM 304 - Midterm Activity

CEM 304 - Midterm Activity

University

10 Qs

quiz-placeholder

Similar activities

Module 9

Module 9

9th Grade - University

15 Qs

Cordless Drill Identification of Components #2

Cordless Drill Identification of Components #2

11th Grade - University

15 Qs

MODULAR CONSTRUCTION

MODULAR CONSTRUCTION

University

15 Qs

Design and Build Project Strategies Quiz

Design and Build Project Strategies Quiz

University

12 Qs

Risk Assessment and Management Concepts

Risk Assessment and Management Concepts

12th Grade - University

10 Qs

CEM 304 - Midterm Activity

CEM 304 - Midterm Activity

Assessment

Quiz

Construction

University

Practice Problem

Hard

Created by

Jamaica Asor

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During a high-rise project, a worker slipped on scattered debris and fell on the same level. Which type of accident is this?

Fall from height

Slip, trip, and fall

Caught-in/between

Struck-by

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A laborer’s hand got stuck while operating a rebar bending machine without a guard. What accident type is this?

Electrocution

Struck-by

Caught-in/between

Fall from height

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An electrician accidentally touches an exposed live wire while working. Which control should have been prioritized first?

Provide PPE (rubber gloves)

Install insulation and grounding systems

Conduct toolbox meetings daily

Provide ear protection

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A worker was hit by a falling hammer from above. Which PPE would have reduced the injury risk?

Safety shoes

Goggles

Hard hat

Gloves

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A construction company rotates workers assigned to noisy jackhammer tasks every 2 hours. What control is applied here?

PPE

Engineering control

Administrative control

Hazard elimination

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During excavation, a wall collapses and traps two workers inside the trench. What type of accident is this?

Struck-by

Slip, trip, fall

Caught-in/between

Electrocution

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A worker fainted from heat exhaustion after continuous work under the sun. Which preventive measure best applies?

Rotate workers and provide hydration breaks

Require hard hats

Install guardrails

Issue gloves

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?