Search Header Logo

Lesotho Highlands Water Project Quiz

Authored by mukatimui kabika

Geography

11th Grade

Used 1+ times

Lesotho Highlands Water Project Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the Lesotho Highlands Water Project (LHWP)?

To reduce migration to South Africa

To transfer water from Lesotho to South Africa

To promote tourism in Lesotho

To expand Lesotho’s mining industry

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which major river’s headwaters are used in the project?

Zambezi River

Limpopo River

Senqu/Orange River

Vaal River

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lesotho is unique because it is the only country that is:

Completely surrounded by desert

Entirely above 1,000 meters in elevation

Made up of volcanic islands

Covered by rainforest

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The project mainly supplies water to which area of South Africa?

Cape Town

Durban metropolitan area

Free State and Greater Johannesburg area

Northern Cape Province

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of the Senqu/Orange River water will be transferred to South Africa upon completion?

10%

25%

40%

75%

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which dam was completed in 1998?

Polihali Dam

Mohale Dam

Katse Dam

Tsoelike Dam

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long is the tunnel that transfers water to South Africa?

10 km

20 km

32 km

50 km

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?