1.
A cross section shows what?
a)
Face BWK
b)
Room widths
c)
Roof detail
d)
Foundation detail
2.
Which tool do you use to set out a 90 degree quoin?
a)
T square
b)
Builders square
c)
Tri square
d)
Builders sqaure
3.
1: 5 and 1:50 are used on which drawings?
a)
Detail drawing & elevation
b)
Detail drawing & plan
c)
Cross section & plan
d)
Detail drawing & section
4.
We can use a CAT (cable avoidance tool) scanner to locate what before we start our building work?
a)
Existing foundations
b)
Existing services
c)
Existing soil
d)
Clay
5.
What is a building line?
a)
The line from which we set out and is approved by the L.A
b)
A line approved by the HSE
c)
A line approved by your supervisor
d)
The front of the building
6.
To what depth do we clear a new site?
a)
100mm
b)
150mm
c)
200mm
d)
225mm
7.
Why do we carry out "site strip" to a depth of 150mm?
a)
To allow for drainage
b)
To allow for the floor to be layed
c)
To stop vegetation growing back
d)
Cos Darran says so
8.
Equal diagonals ensure what?
a)
Plumb brickwork
b)
Straight BWK
c)
A square Build
d)
A straight build
9.
A method statement tells us what?
a)
How to carry out our work & to do it safely
b)
How to carry out our work and the cost
c)
How to carry out our work and the time it takes
d)
How to carry out our work & our wages
10.
What does a datum peg do?
a)
Gives us a point to measure from
b)
Gives us a point to level from
c)
Gives us a point to set out from
d)
Gives us a GPS re
11.
Why do we protect site datums from damage?
a)
To ensure accuracy?
b)
To assist the bricklayers?
c)
To ensure a faster completion?
d)
Cos Ricardo said so?
12.
A straight edge & spirit level are used for which job?
a)
Plumbing your brickwork
b)
Transferring levels
c)
Transferring data
d)
A method statement
13.
What is the piece of equipment in the picture called?
a)
A setting out pole
b)
A timber post
c)
A timber profile
d)
A datum peg
14.
By reversing it between 2 pegs is how we check which tool for accuracy?
a)
Straight edge
b)
Optical level
c)
Laser level
d)
Spirit level
15.
Why do we put pegs in the bottom of a foundation?
a)
To reinforce it
b)
To keep it level
c)
To keep it straight
d)
To keep it clean
16.
What tool do you use when checking your gauge?
a)
Ranging line
b)
Straight edge
c)
Builders square
d)
Tape measure