1.

Once the Cpk of a process is determined, it can predict the ________ of a product as long as the process _______.

a)

Production; rate remains stable

b)

Life cycle; is within specification

c)

Quality; is not stopped

d)

Quality; remains in control

2.

The Cpk is a statistical control process term that describes the ______.

a)

Standard outcome of a process

b)

Standard deviation of a process

c)

Capacity of a process

d)

Means of a process

3.

A _______ is a graphic method to show how the data is distributed across the range of values.

a)

Pareto diagram

b)

Histogram

c)

Scatter diagram

d)

Flow chart

4.

If the histogram of a process is not bell shaped, then the process is _________.

a)

Not centered

b)

Not stable

c)

Normal

d)

None of the above

5.

SPC stands for ________.

a)

Standard practices and competencies

b)

Statistical process control

c)

Staffing protocol and cost

d)

Standard parts cost

6.

Production department develop a quality history database by __________.

a)

Working as a team to solve problems

b)

Stopping the line when the number of defects suddenly increase

c)

Recording inspection data

d)

Using concurrent engineering

7.

Workers perform _______ to control product quality, and develop SPC charts and determine its parts meet specification.

a)

Root cause analysis

b)

Predictive maintenance activity

c)

Team meetings

d)

Inspections

8.

Random part should be selected from a production run for inspection because ______.

a)

Selecting parts batches take too long for an operator to inspect

b)

The odds of finding one bad parts are increased

c)

To prevent the operator from only maintaining the machine when a sample is getting ready to be taken

d)

Its the best method to ensure the sample is representative of the characteristics of the production run

9.

A histogram is one type of tool that can be used to _______.

a)

Weigh material

b)

Network computers

c)

Measure process control

d)

Assure worker attendance

10.

Statistical process control (SPC) is used to ________.

a)

Provide instruction for control equipment

b)

Determine when a process is going to produce bad parts before it actually does

c)

Provide high performance control of machines in process application

d)

Schedule preventative maintenance

11.

The Japanese Term Kaizen means

a)

Continuous Improvement

b)

Quality

c)

Mistake Proofing

d)

Inspection

12.

Who is the driving force throughout the life cycle of a product

a)

Engineers

b)

Operators

c)

Quality Inspectors

d)

Customers

13.

Which of the following is the federal agency devoted to workplace safety

a)

NIOSH

b)

OSHA

c)

EPA

d)

None of the Above

14.

Which type of Audit is requested by your manager

a)

Internal Audit

b)

External Audit

c)

3rd Party Audit

d)

Other

15.

Kaizen is an important aspect of what quality control system

a)

5S

b)

Lean

c)

TQM

d)

Six Sigma

16.

What is the difference between Kaizen and Six Sigma?

a)

Kaizen is obervation/inspection based, while Six Sigma is data driven.

b)

Six Sigma is focused on small quality improvements

c)

Kaizen is focused on improving the quality of incoming raw materials

d)

None of the above

17.

The typical accuracy of a modern dial caliper is about __________.

a)

0.1 inches

b)

0.01 inches

c)

0.001 inches

d)

None of the Above

18.

To precisely measure the diameter inside a cylinder a(n) __________ should be held squarely across the cylinder.

a)

Dial Caliper

b)

Outside Micrometer

c)

Inside Micrometer

d)

Dial Indicator

19.

What is the minimum diameter that a inside micrometer can measure?

a)

5 mm

b)

10 mm

c)

25 mm

d)

Other

20.

What would be the best measurement device to see how much a part varies from its required dimension?

a)

Dial Caliper

b)

Micrometer

c)

Dial Indicator

d)

Machinist Rule

21.

The process of zeroing the probe on a dial indicator using a part that has been found to be a precise length is known as __________.

a)

Calibration

b)

Gauging

c)

Mastering

d)

Zeroing

22.

How often should micrometers be inspected and re calibrated using gauge blocks?

a)

Daily

b)

Weekly

c)

Monthly

d)

Twice a year

23.

The sampling plan uses a __________ chart that indicates to an inspector the number of parts to inspect based on the size of the product batch.

a)

Process

b)

Frequency

c)

Inspection

d)

Other

24.

New product design teams should perform a(n) __________ as early in the design process as possible.

a)

Design Failure Mode and Effect Analysis (DFMEA)

b)

Root Cause Analysis

c)

Design Review

d)

Other

25.

Which of these is NOT a core principle of Total Quality Management?

a)

Quality Improvement

b)

Everyone involved in quality improvement

c)

Customer satisfaction

d)

Cost savings

26.

What is benchmarking?

a)

Determining industry leader in an area and using them as a guide

b)

Setting a standard measure of quality

27.

This group meets to determine what to do with non conforming parts(Red Tags)

a)

Quality Assurance

b)

Material Review Board (MRB)

c)

Kaizen Event

d)

Quality Control Board

28.

Two variables, x and y, are related. Variable x increases or decreases with y. Which of the following tools could best be used to graphically show this relationship?

a)

Control Chart

b)

Histogram

c)

Bi-Modal Histogram

d)

Scatter Plot

29.

A team wants to illustrate which defect types are occurring most frequently. The quality tool they would use is a:

a)

Run Chart

b)

Pareto Chart

c)

Cause and Effect/Ishakawa Diagram

d)

Stratification

30.

Which of the following tools would be most appropriate for collecting data to study the symptoms of a problem?

a)

Control Chart

b)

Check List

c)

Check sheet

d)

Histogram

31.

A type of line graph used to assess the stability of a process is called a:

a)

Line Chart

b)

Run Chart

c)

Control Chart

d)

Check Sheet

32.

Which of these statements about tolerance and control limits is true?

a)

Tolerance is the same as control limits

b)

Control limits is the same as specifications

c)

Tolerance means that the measurement falls within the agreed upon process limits

d)

Control limits mean that the measurement falls within the agreed upon process limits

33.

A Run chart is a useful tool to show…

a)

the error margin of a sample vs. whole population

b)

behavior of data points against specifications

c)

behavior of data points against control criteria

d)

patterns and trends in a row of data points

34.

If there are seven data points either above or below the mean, but still within the control limits, what should you do?

a)

Ignore it and continue to measure the process

b)

Reinspect the product

c)

Find the cause because that means the process is not in control

d)

Reject the product

35.

The four categories of costs associated with product quality costs are:

a)

External failure, internal failure, prevention, and inspection

b)

Warranty, product liability, training, and appraisal

c)

External failure, internal failure, repair, and appraisal

d)

External failure, internal failure, prevention, and appraisal

36.

What should the company focus on to achieve quality more economically?

a)

External Failuire Cost

b)

Internal Failure Cost

c)

Prevention Cost

d)

Appraisal Cost

37.

The cost of scrap rework, in a product quality cost system is categorized as a:

a)

Internal Failure Cost

b)

External Failure Cost

c)

Appraisal Cost

d)

Prevention Cost

38.

The cost of quality related training in a product quality cost system is categorized as a

a)

Internal Failure Cost

b)

External Failure Cost

c)

Appraisal Cost

d)

Prevention Cost

39.

Which of the following quality costs are failure costs?

a)

Customer Survey Cost

b)

Calibration Cost

c)

Product Recall Cost

d)

Pre-Dispatch Inspection Costs

40.

Costs associated with preparation of quality management system and inspection procedures for inspection and testing should be charged to:

a)

Internal Failure Cost

b)

External Failure Cost

c)

Appraisal Cost

d)

Prevention Cost

41.

The basic objective of a quality cost program is to:

a)

minimize internal failures

b)

Calculate the cost of quality department

c)

Improve the overall profitability of the organization

d)

Support accounting department

42.

The term DMAIC is associated with:

a)

Digital Measurement

b)

Six Sigma

c)

Calibration

d)

Sustainable Development

43.

What does PDCA stand for?

a)

Plan, Design, Control, Action

b)

Plan, Do, Check, Act

c)

Product, Development, Continuous, Development

d)

Process, Deployed, Corrective, Action

44.

What does QMS stand for?

a)

Quality Method Statement

b)

Quality Multiple Solutions

c)

Quality Measurement System

d)

Quality Management System

45.

The term UCL is associated with:

a)

Control Charts

b)

Innovation

c)

Non Destructive Testing

d)

Audits