wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

IS Task Type SOP

Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

Each task type on the SOP includes the following (select all that apply)

a)

Purpose

b)

Estimated Task Length

c)

Information/ tips specific to that task type

d)

What the PM should provide in a task

e)

What the IS will do in a task

2.

What email should you grant permissions to when assigning a task to the IS team?

a)

technorics@entrata.com

b)

implementationspecialists@entrata.com

c)

contentcollection@entrata.com

d)

techtonics@entrata.com

e)

isteam@entrata.com

3.

True or False: You have to provide a reference property for every task type

a)

True

b)

False

4.

Which of the following is not a supported image file type for an upload property images task?

a)

TIFF

b)

JPEG/JPG

c)

PDF

d)

PNG

e)

GIF

5.

True or False: Copy property settings is an IS task type

a)

True

b)

False

6.

If one of your clients is requesting that a check scanner be installed at one of their properties today what should you do?

a)

Talk to Collin and see if a task can be escalated

b)

Work with support to have the check scanner installed

c)

It is not possible to perform a same day check scan install

7.

An IS team member will always rely on ________ to determine what work needs to be done on a given task.

a)

The task types selected on the custom form

b)

The title of the task

c)

Their intuition

d)

Fate

8.

Which of the following are reasons an IS team member would need to send a Resident Insure Website task back to you? (Select all that apply)

a)

Required fields on the underwriting survey have not been completed by the client

b)

The preferred carrier column is empty

c)

The preferred carrier column is hidden from view and edit access to the underwriting form has not been granted to techtonics@entrata.com

d)

The underwriting form provided is outdated and missing important information

9.

True or False: When creating a bulk task you must provide a list of every property that needs the work done. You cannot say, "all properties in x database."

a)

True

b)

False

10.

True or False: You cannot pair a Leasing Center Questionnaire with any other task type.

a)

True

b)

False

11.

True or False: Both High and Urgent priority tasks must include an update addressed to your supervisor as well as the IS AD that includes a justification statement outlining why the task merits immediate attention.

a)

True

b)

False

c)

I'm sorry

12.

What is the Estimated Task Length for a duplicate property task?

a)

5-10 min

b)

1-4 hrs

c)

6-10 hrs

d)

45 min - 1.5 hrs

13.

Which of the following are not copied over in a duplicate property task? (select all that apply)

a)

Picklist Settings

b)

The Leasing Center Dashboard

c)

Applications & Leases

d)

Website settings

e)

Property content (images, floor plan images, logos)

14.

True or False: A document exists that shows every setting that is copied over in each IS copy settings task type as well as every setting that is copied over with the profile.

a)

True

b)

False

15.

True or False: If the properties and products are listed on the project overview tab of your project they do not need to be listed on the quality review task custom form.

a)

True

b)

False

16.

True or False: A complete list of properties and products to be checked is required on the custom form of both partial and final quality review tasks.

a)

True

b)

False

17.

BONUS: Which of the following lists every member of the IS team?

a)

Adam, Makenna, Nick, Maddi, Ian, Igor, Kseniia, Kate

b)

Adam, Makenna, Nick, Maddi, Paige, Igor, Kseniia, Nicole, Kate

c)

Adam, Makenna, Nick, Ian, Igor, Kseniia, Kassidy, Nicole, Kate

d)

Adam, Makenna, Nick, Maddi, Ian, Igor, Kseniia, Nicole, Kate