General Building Repairs 235 pt 1

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

What is the main consideration when mixing mortar used to replace damaged brickwork?

a)

Workability of mortar ?

b)

Match the existing mortar ?

c)

Be weaker than the existing mortar ?

d)

Be stronger than the existing mortar ?

2.

Where should breathable felt be used:

a)

In the roof ?

b)

Over windows ?

c)

Under the floor ?

d)

In a concrete raft ?

3.

Which one of the following is likely to be caused by settlement of a building:

a)

Cracking ?

b)

Spalling ?

c)

Staining ?

d)

Efflorescence ?

4.

What is the cause of efflorescence on the face of a wall:

a)

Poor jointing of brickwork ?

b)

Poor protection from weather ?

c)

Use of excessive plasticiser ?

d)

Use of excessive retarder ?

5.

The PPE shown in the image below protects the user from breathing in harmful:

a)

gasses ?

b)

liquids ?

c)

vapours ?

d)

particles ?

6.

What is the best way to minimise hazards when replacing roof trusses:

a)

Use less labour to lift trusses ?

b)

Use mechanical lifting equipment ?

c)

Use lighter but stronger materials ?

d)

Use additional labour to lift trusses ?

7.

How many floor tiles are required for the floor plan shown in the image below using 600 mm x 600 mm tiles:

a)

32 ?

b)

42 ?

c)

52 ?

d)

62 ?

8.

How much concrete is required for the floor shown in the image below at a depth of 200 mm:

a)

0.12 m3 ?

b)

1.2 m3 ?

c)

12 m3 ?

d)

120 m3 ?

9.

What safety checks should be carried out before using a pole ladder:

a)

Count the rungs ?

b)

Look for defects ?

c)

Ensure it is made from timber ?

d)

Ensure it is made from aluminium ?

10.

What should an operative do if a steel trestle scaffold has its height adjustment pin missing:

a)

Use a nail ?

b)

Use a screwdriver ?

c)

Use it without adjusting it ?

d)

Report it to the Supervisor ?

e)

Ignore it and put myself and others at risk ?

11.

What task should require the use of the equipment shown in the image below:

a)

Replacing trench props ?

b)

Re-pointing brickwork ?

c)

Removing load-bearing walls ?

d)

Removing non-load-bearing walls ?

12.

Why should the tool shown in the image below be used before operatives excavate existing drainage:

a)

To measure the volume of earth ?

b)

To locate underground services ?

c)

To set drains to correct gradients ?

d)

To find out the depth of the trench ?

13.

What task should require using the tool shown in the image below:

a)

Rendering walls ?

b)

Applying plaster ?

c)

Finishing concrete ?

d)

Applying tile adhesive ?

14.

What task should require using the tool shown in this picture:

a)

Removing tiles ?

b)

Removing render ?

c)

Removing old mortar ?

d)

Removing copper pipe ?

15.

What is the most important consideration when buying materials for external facing brickwork repairs:

a)

Cheapest material ?

b)

Material availability ?

c)

Easiest material to use ?

d)

Match existing material ?

16.

Why should the equipment shown in the image below be used when mixing mortar

a)

To gauge quantities ?

b)

To mix materials ?

c)

To carry materials ?

d)

To slump test ?

17.

What type of drainage system keeps surface and foul water apart:

a)

Partially separate ?

b)

Combined ?

c)

Soakaway ?

d)

Separate ?

18.

Which of the following systems recycles rain water:

a)

Soakaway ?

b)

Combined ?

c)

Sustainable ?

d)

Partially separate ?

19.

Why is wet hessian used to cover finished concrete:

a)

It helps it to breath ?

b)

It protects from drying ?

c)

It protects from damage ?

d)

It helps the curing process ?

20.

Which of the following is the best way to inform people of potential hazards on site:

a)

Manufacturer’s instructions ?

b)

Working drawings ?

c)

Clear signage ?

d)

Specification ?