Total questions: 15
Worksheet time: 5mins
This workgroup handles acknowledgement of request and endorsement for Implementation
An _________ realizes the optical transmission from the OLT towards the users and vice versa. It utilizes passive optical components
OLT
ONT
ODN
A or C
If additional LCP is needed, it is not considered as new ODN rollout, thus should be included in this project.
TRUE
FALSE
Sometimes TRUE
Sometimes FALSE
Simple Add NAP Opening means – there is an existing ______ in which there are inactive NAP which can be opened without cable laying.
ONU
NAP
OLT
LCP
This is the first module that was developed in WARPP.
Equipment Recovery
PM Tools
IBS & MMP
Network Migration
What is the correct "Add NAP Process & Assessment"?
The term used for "Area with existing PLDT facility."
Brownfield
Greenfield
ADD NAP
LCP
This are features of WARPP.
Management Reports
Export Data
Work Flow Monitoring
Alerts and Notifications
File Upload and Download
Fibrization aims to increase speed to _________ at 500m and good line quality.
10-50 MBps
5-10 MB
10-50 mbps
120%
The button that transfers the request to the next group.
FORWARD
STAGE
SUBMIT
NEXT
Those cleared approved for implementation shall be endorsed by the Program Team to the Area PM & FTK vendor.
TRUE
FALSE
Sometimes TRUE
Sometimes FALSE
Once approved by the clearing team, site is NO GO for implementation following the given criteria.
FALSE
TRUE
Maybe
A or C
WARPP Project Nomination Module can be accessed through :
WARPP Tools > Project Nomination
Wired Access > Project Nomination
Network Delivery > Project Nomination
None of the Above
Control Number is system generated.
TRUE
FALSE
Sometimes TRUE
Sometimes FALSE
The button that transfers the request back to Enterprise SPOC for revision of details.
RETURN
BACK
DECLINE
GO