Ag Mech I- 4.04: Framing walls, floor and roofs

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

When Sheri is framing a building, sills are installed

a)

anytime

b)

first

c)

last

d)

sixth

2.

What are the horizontal parts of a building's framing to which the studs are attached?

a)

foundations

b)

plates

c)

ridges

d)

trusses

3.

Trimmer studs for doors are installed

a)

at the bottom

b)

at the top

c)

on each side

d)

on one side

4.

If Jonathan goes to the building supply store and asks for hurricane ties, what is he purchasing?

a)

ledger strips

b)

metal framing anchors

c)

roofing nails

d)

sheetrock screws

5.

If one end of a stud is nailed to the sole plate, where should the other end be nailed?

a)

ceiling joist

b)

floor joist

c)

foundation

d)

top plate

6.

When a builder is using platform framing, the subfloor is nailed to the:

a)

girder

b)

joists

c)

sill

d)

top plates

7.

Since Stan is using platform framing, he should attach the rafters to the:

a)

header

b)

let-in brace

c)

sole plate

d)

top plate

8.

Shannon is building a shop. What is the FIRST the she needs to do before starting to construct her building?

a)

buy lumber

b)

get subcontractors

c)

pay workers

d)

study plans

9.

In platform-type framing, the wall studs are nailed:

a)

on the soleplate

b)

on the ledger

c)

to the rafters

d)

to the sills

10.

When platform-type framing is used for a wood structure, the building is constructed from:

a)

bottom to top

b)

left to right

c)

right to left

d)

top to bottom

11.

What is a major ADVANTAGE of using metal framing anchors?

a)

eliminate floor joists from the framing system

b)

reduce splitting wood cased by toenailing

c)

replace the need for a subfloor system

d)

strengthen warped studs

12.

What framing part should a carpenter nail to both the top plate and the sole plate?

a)

ceiling joist

b)

floor joist

c)

rafter

d)

stud

13.

If a builder uses precut studs for platform-type framing, the lumber needed for a door header is two pieces measuring:

a)

1" x 4"

b)

1" x 6"

c)

2" x 4"

d)

2" x 10"

14.

Janna discovers a major problem in ballon-type framing is that there is/are no:

a)

ceiling joists for nailing

b)

pitch to the roof

c)

platform to stand on

d)

trimmer studs to cut

15.

If a carpenter is marking and cutting short studs to install above or below a window, he is making:

a)

cripple studs

b)

headers

c)

regular studs

d)

trimmer studs

16.

Because extra strength is needed for support, MOST framing lumber used for wood buildings should be:

a)

1" thick

b)

2" thick

c)

4" thick

d)

6" thick

17.

A major advantage of platform-type framing is that MOST of the framing is done after the:

a)

rafters are cut

b)

roof is covered

c)

subfloor is installed

d)

studs are installed

18.

The slope of the roof is the:

a)

color

b)

girder

c)

slant

d)

span

19.

When lumber is used for the horizontal part of the framing, where should the crown of a warped board be located?

a)

bottom

b)

left side

c)

right side

d)

top

20.

What is the unit length of a rafter if the total length including 14" overhang is 200"?

a)

14"

b)

100"

c)

186"

d)

200"

21.

The unit of a rafter is the length without the:

a)

bird's eye

b)

plumb cut

c)

tail and overhang

d)

top or bottom angle

22.

If one is unable to use a rafter table, the length of a common rafter can be determined by using the:

a)

bird's eye

b)

estimating methods

c)

ridgeboard

d)

stepping method

23.

When a carpenter frames a building using platform framing, the floor joist header is installed:

a)

anytime

b)

first

c)

last

d)

second

24.

If one is unable to use joist hangers to install floor joists, what has to be cut and nailed for the joists to rest on:

a)

ledgers

b)

rafters

c)

studs

d)

top plates

25.

When Jan uses platform-type framing, where is the top plate attached?

a)

above the ceiling joists

b)

below the studs

c)

on top of the rafters

d)

on top of the studs