wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

QUIZ CNC MILLING

Total questions: 20

Worksheet time: 13mins

Name
Class
Date
1.

CNC term is

a)

Computer Numerical Contouring

b)

Computer Numerical Control

c)

Control Numerical Computer

d)

Computer Numerical Center

2.

Advantages of CNC machine. Tick the 3 correct answers

a)

Avoids human errors

b)

Lower maintenance requirement

c)

Reduce space requirement

d)

Higher productivity and better quality

e)

High operator skill to handle machine

3.

Main parts of the CNC Milling. Tick the 3 correct answers

a)

Main Spindle

b)

Tailstock

c)

Automatic Tool Changer (ATC)

d)

Electrode Wire

e)

Control Panel

4.

The Linear Axes of CNC Milling

a)

XZ

b)

XYZ

c)

ABC

d)

UVW

5.

The location of machine table and spindle (tool) at X0,Y0,Z0

a)

Work Zero Point

b)

Workshift

c)

Home Position

d)

Machine Coordinate Point

6.

Work Zero Point is.........Tick the 3 correct answers.

a)

A point on the workpiece

b)

Work origin

c)

Home Position

d)

X0,Y0,Z0

e)

Machine zero point

7.

Cutting along a straight line between two point

a)

G00

b)

G01

c)

G02

d)

G03

8.

Cutting a circular anti-clockwise direction between two point

a)

G01

b)

G02

c)

G03

d)

G04

9.

Absolute Coordinate System

a)

G91

b)

G90

c)

G50

d)

G01

10.

Meaning for G43 :

a)

Tool Offset Right

b)

Tool Offset Left

c)

Tool Length Offset

d)

Tool Radius

11.

Work Coordinate System is.....tick the 3 correct answers

a)

The location of the workpiece

b)

Distance between the workpieces to the home position

c)

XY Axis as a Workshift

d)

Tool Radius Compensation

12.

G codes for Workshift

a)

G50

b)

G54

c)

G40

d)

G42

13.

Change a tool

a)

M03

b)

M05

c)

M06

d)

M08

14.

M30 has the same function as M02

a)

YES

b)

NO

15.

Meaning this codes ' M03 S1200' is....

a)

Tool change at speed 1200 RPM

b)

Spindle rotation clockwise at 1200 RPM

c)

Spindle rotation anti-clockwise at 1200 RPM

d)

Tool rise up at 1200 RPM

16.

Refer the drawing for Absolute Coordinate System, select the correct coordinates.....

a)

B (25.0 ,0)

b)

C (X25.0, Y25.0)

c)

D (X60.0, Y50.0)

d)

F (X75.0, Y75.0)

17.

Terms for the Incremental Coordinate System. Tick the 3 correct answers

a)

G91

b)

X movement to the right, X+ and to the left X-

c)

Require a reference point

d)

Depends on the distance of movement

e)

Refer the work origin X0, Y0 and Z0

18.

The Automatic Tool Changers (ATC) function to attachment and changing of the tool is done directly by rotating the drum at its home position.

a)

YES

b)

NO

19.

In part programing...G01 X10.0 Y10.0 F250, F code stand for...

a)

Function

b)

Figure

c)

Flow

d)

Feedrate

20.

A typical block of a part program contains a variety of code words except..........

a)

G codes

b)

Block Number

c)

Tool function

d)

Machine table function

e)

Spindle speed function