wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Production Planning and control

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Which of the following is not a part of Five M’s?

a)

Material

b)

Machine

c)

Motion

d)

Method

2.

The correct sequence of operations in production planning and control is

a)

Routing-Scheduling-Dispatching-Follow up

b)

Scheduling-Routing- Dispatching-Follow up

c)

Dispatching-Routing-Scheduling- Follow up

d)

Routing-Scheduling-Follow up-Dispatching

3.

Which of the following is true for ‘Routing’?

a)

It is flow of work in the plant

b)

Route sheets include list of machine tools that are to be followed

c)

It depends upon material handling facilities

d)

All of the above

4.

Loading may be defined as

a)

Sending the raw material to the machine

b)

Sending the finished material to the store

c)

Assign the work to the facilities

d)

Uploading a software in machine control panel

5.

Dispatching authorises the start of production operations by

(i)Release of material and components from stores to first process

(ii)Release of material from process to process

(iii)Issue of drawings instruction sheets

a)

Only i

b)

Only ii

c)

i & ii

d)

i , ii & iii

6.

The bill of material does not consists of

a)

Part number

b)

Specifications of part

c)

Name of the part

d)

Price of the part

7.

Procurement cycle time is time consumed for

a)

Receiving of raw material

b)

Inspection of various raw materials

c)

Inspection of purchased components parts

d)

All of the above

8.

The transit time consist of

a)

Time taken by raw material from machine to machine

b)

Time consumed in moving the work between various departments

c)

Time taken by a worker to machine a component

d)

None of the above

9.

Master schedule is prepared for

a)

Single product continuous production

b)

Multi product batch production

c)

Assembly product continuous production

d)

Single product batch production

10.

Which of the following chart is drawn Machine vs time?

a)

Man machine chart

b)

The load chart

c)

The progress chart

d)

Curve chart

11.

Gantt chart is mostly used for

a)

Routing

b)

Scheduling

c)

Follow up

d)

Inspection and quality control

12.

Key to chart is provided in

a)

Man machine chart

b)

The load chart

c)

The progress chart

d)

Gantt chart

13.

Centralized and decentralized are the types of

a)

Routing

b)

Dispatching

c)

Scheduling

d)

Follow up

14.

Productivity =

a)

Input / Output

b)

Output / Input

c)

Output – Input

d)

Input – Output

15.

The resources utilized for production are

a)

Materials, Machines, Manpower

b)

Materials, Methods, Machines

c)

Machines, Manpower, Methods

d)

Methods, Machine, Manpower

16.

The elimination of which of the following will improve industrial productivity

a)

Excess time

b)

Ineffective time

c)

Both (A) and (B)

d)

None of the above

17.

The time for which the worker or machine or both remain idle due to the shortcomings of the management or workers is known as

a)

Excess time

b)

Idle time

c)

Ineffective time

d)

Work content

18.

Productivity can be increased by

a)

By increasing the output from the same input

b)

By reducing the input for the same output

c)

Both (A) and (B)

d)

None of the above

19.

Identify one of the objective of work study

a)

problem solving

b)

cost effectiveness

c)

eliminates unnecessary human movements

d)

prepare balance sheet

20.

In ABC analysis, the C items are those which represents

a)

small percentage of the total annual consumption value

b)

high percentage of the total annual consumption value

c)

small percentage of closing inventory value

d)

high percentage of closing inventory value

21.

The time taken for the job from its arrival to the system until its departure is

a)

completion time

b)

flow time

c)

due time

d)

processing time

22.

The main objectives of work measurement is to:

a)

plan and schedule of production

b)

estimate the selling prices and delivery dates

c)

formulate a proper incentive scheme

d)

all of the above

23.

ABC analysis

a)

is meant for relative inventory control

b)

is a basic technique of materials management

c)

does not depend upon the unit cost of the item but on its annual consumption

d)

all of the above

24.

In break even analysis, total cost consists of

a)

fixed cost + sales revenue

b)

variable cost + sales revenue

c)

fixed cost + variable cost

d)

fixed cost + variable cost + profit

25.

ABC represents

a)

fast, slow and non-moving items

b)

high, medium and low items

c)

vital, essential and desirable items

d)

moving, non-moving and ghost items