wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Physical Quiz

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

Selt result is 40 and customer is exchange

a)

Escalate direct to iu Team

b)

let customer connect from his main

2.

If customer has unpaid bills and he pass grace period we will

a)

Continue troubleshooting with customer

b)

stop troubleshooting and inform cst to pay his bill

3.

After completing PO will be consider as a fix

a)

True

b)

False

4.

changing router is consider fix

a)

True

b)

False

5.

cst has noise fluctuation diagnose CCA action will

a)

escalate to iu without any troubleshooting

b)

inform customer to check with other cpe

c)

inform customer to remove this diagnose and run fix again

6.

Cst has stolen cable You will

a)

Escalate to iu after do all steps needed

b)

Escalate to iu with 1 working day

c)

Escalate to iu with 3 working day

7.

Technician dispatch is recommended Mean cst face

a)

Physical problem

b)

Logical problem

8.

cst has Wrong card and port And cst has no logs while he is up and matrix down

a)

Reset and configure and then escalate to IU

b)

Escalate direct to IU

c)

Inform customer to connect from main

9.

Cst is facing BLQ while he has Tech Dispatch is recommended 1st step will be

a)

Connect from main

b)

Ask customer to remove Diagnose

10.

Cst Has adsl led down , matrix down , has 12 logs last 12 hour and has no logs last 3 hours so will handle

a)

Data down

b)

physical instability

11.

If customer complain from slowness service and the result of running mode is technician dispatch and unstable speed 6 mega CCa action

a)

Give script

b)

Escalate BLQ To IU

c)

Escalate physical instability

12.

CSt is facing data down after Connecting from main wire customer become up and stable CCA Will

a)

inform customer to change his cpe

b)

inform customer by solvent

c)

let customer change his splitter

13.

voice over labing case override wrong card and port

a)

True

b)

False

14.

cst has voice down after connect from main voice is down CCA Will

a)

Escalate to IU

b)

Esclate to Pilot follow UP

15.

Sla of Need optimization pool is

a)

24 hours

b)

1 hour

c)

2 hours