wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

System & SLA

Total questions: 18

Worksheet time: 9mins

Name
Class
Date
1.

21-its mandotary to add id outage in ticket

a)

True

b)

False

2.

which tool remove suspend

a)

A-CST 360

b)

B-NST

3.

18-whick tool to get PW for service

a)

A-Matrix

b)

B-CST 360

4.

16-which tool check outage

a)

A-Matrix

b)

B-CST 360

5.

10-you can check logs Accepted or rejected by

a)

A-Matrix

b)

B-NST

6.

8-which tool check line Disabled or Enabled

a)

A-NST

b)

B-Matrix

7.

13-which protocol resolve ip to name

a)

A-DHCP

b)

B-DNS

8.

17-which command to get Default gateway

a)

A-ipconfig

b)

B-ping

9.

2-which cable connected before CPE

a)

A-RJ 45

b)

B-RJ 11

10.

3-if CST has welding from main wire will remove it by using

a)

A-Roesitta

b)

B-RJ 45

11.

4-if CST connected from his main to CPE direct its correct

a)

A-True

b)

B-False

12.

6-if CST has voice down and has fix by Electrical consider Fixing by TE

a)

A-True

b)

B-False

13.

12-which protocol from CPE get Ips Automatic

a)

A-DNS

b)

B-DHCP

14.

First escalation SLA for voice down case is :

a)

1 working day

b)

1 day

c)

1 hour

15.

First escalation SLA For BLQ case is :

a)

2 working day

b)

1 working day

c)

2 days

16.

If CST has ADSL Led Down so case is

a)

Data down

b)

voice down

c)

unable to obtain ip

17.

If CST has Internet Led down so Case is :

a)

data down

b)

unable to obtain ip

c)

BLQ

18.

CSt has ADSL Led unstable so case is :

a)

physical instability

b)

logical instability

c)

data down