6.0 SDLC

Total questions: 30

Worksheet time: 20mins

Name
Class
Date
1.

SDLC stands for...

a)

Software development litigation cycle.

b)

System development life conditions.

c)

Software development life cycle.

d)

System development life cycle.

2.

SDLC is a collection of (a)   that contain set a group of activities in the information system development.

3.

Which of these is the correct order of the SDLC?

a)

Support & Security, Planning, Design, Analysis, Implementation

b)

Planning, Analysis, Design, Implementation, Support & Security

c)

Analysis, Planning, Design, Support & Security, Implementation

d)

Planning, Analysis, Implementation, Design, Support & Security

4.

Identify the correct activities involve in the first phase of SDLC

a)

review project request

b)

conduct preliminary investigation

c)

identify project development team

d)

convert to new system

5.

Which activities involve in analysis?

a)

conduct feasibility studies

b)

evaluate system security

c)

convert to new system

d)

perform detailed analysis of the old system

6.

Which activities correct for design phase?

a)

Develop program and apps

b)

perform maintenance for the system

c)

acquire hardware and software

d)

develop details of the system

7.

Choose the true activities for implementation

a)

allocate resources

b)

evaluate system security

c)

install and test new system

d)

conduct feasibility study

8.

Choose the correct support and security activity

a)

design prototype to proposed system functionality

b)

determine the inefficiency or stability of the new system

c)

showing users how to use the system

d)

determine user's wan, needs and requirement

9.

What is the responsibility of a System Analyst in development team?

a)

designing new computer systems and frameworks

b)

designing and creating software programs

c)

establish a project schedule and determine each phase

d)

supplying material, equipment, hardware, software

10.

A detailed analysis covers all of these EXCEPT

a)

The user's needs and requirements.

b)

Acquire hardware and software.

c)

A recommendation of a solution.

d)

The deficiencies of the old system.

11.

Who should review the detailed design before it is developed?

a)

The developer.

b)

The users.

c)

As many stakeholders as possible.

d)

The ICT support team.

12.

When should users be trained on a new system?

a)

During the Analysis phase.

b)

During the Design phase.

c)

During the Implementation phase.

d)

During the Support & Security phase.

13.

In which phase is the performance of the new system monitored?

a)

During the Analysis phase.

b)

During the Design phase.

c)

During the Implementation phase.

d)

During the Support & Security phase.

14.

An acceptance test is carried out..

a)

When testing the new system with other integrated systems

b)

When testing that the new system works on the hardware.

c)

When testing the new system module by module.

d)

When testing that the new system works with real data and real users

15.

What happens in the design phase?

a)

The code is produced

b)

Planning the solution, look and feel of the software interface

c)

Making changes when the software has been created

d)

Ensuring the requirements are understood

16.

How many types of testing are given in system life cycle? (a)  

17.

Which of them is the slowest method of system implementation.

a)

Direct

b)

Parallel

c)

Phased

d)

Pilot

18.

A company that wants the quickest method of implementation.

a)

Direct

b)

Parallel

c)

Phased

d)

Pilot

19.

What do you called where the new system is introduced into one branch or office of the company and its performance assessed before being introduced elsewhere in the company?

a)

Phased implementation

b)

Parallel running

c)

Direct changeover

d)

Pilot running

20.

Which stage checks that the system does what it's supposed to and is working correctly after installation

a)

Implementation

b)

Support & Security

c)

Design

d)

Analysis

21.

What document is produced to identify whether the project is technically possible and worth the cost of development?

a)

Analysis report

b)

Profit and loss account

c)

Feasibility study

d)

Prototype

22.

"While at the supermarket, one of the workers gave me a handout containing questions that I had to answer and return. " Which research method is described above

a)

Questionnaires

b)

Interviews

c)

Collecting Document

d)

Observation

23.

"I went to a company as a system analyst, sat down to see how the current system works. I did not talk to anyone." Which research method is described above?

a)

Questionnaires

b)

Interviews

c)

Collecting Document

d)

Observation

24.

The modification of the software to match changes in the ever changing environment, falls under which category of system maintenance

a)

corrective

b)

adaptive

c)

perfective

d)

preventive

25.

system or software maintenance includes

a)

errors corrections

b)

enhancement capabilities

c)

deletion of obsolete capabilities

d)

all of the mentioned

26.

The Planning phase is the most crucial step in creating a successful system, during this phase you decide exactly what you want to do and the problems you’re trying to solve, by:

a)

Designing numerous items including output, input, databases, programs, procedures and controls

b)

Defining the objectives of the project, as well as end user expectations and requirements

c)

The end-user’s requirements should be determined and documented, what their expectations are for the system, and how it will perform.

d)

Identifying available resources, such as personnel and finances

27.

In which phase is the development team being establish?

a)

During the Analysis phase.

b)

During the Design phase.

c)

During the Planning phase.

d)

During the Support & Security phase.

28.

"My work is to go through the books of the company I am working for in order to establish what data is inputted into the system." In which phase is this activities perform?

a)

During the Analysis phase.

b)

During the Design phase.

c)

During the Planning phase.

d)

During the Support & Security phase.

29.

There are several tools and techniques used for describing the system design of the system. These tools and techniques are: Flowchart, Data flow diagram (DFD), Data dictionary and others.

a)

During the Analysis phase.

b)

During the Design phase.

c)

During the Planning phase.

d)

During the Support & Security phase.

30.

A group of employees can attain large amounts of knowledge at the same time. This statement is refer to which type of training

a)

One-on-one

b)

Classroom Style

c)

Web based

d)

Interactive