SDLC stands for...
Software development litigation cycle.
System development life conditions.
Software development life cycle.
System development life cycle.
SDLC is a collection of (a) that contain set a group of activities in the information system development.
Which of these is the correct order of the SDLC?
Support & Security, Planning, Design, Analysis, Implementation
Planning, Analysis, Design, Implementation, Support & Security
Analysis, Planning, Design, Support & Security, Implementation
Planning, Analysis, Implementation, Design, Support & Security
Identify the correct activities involve in the first phase of SDLC
review project request
conduct preliminary investigation
identify project development team
convert to new system
Which activities involve in analysis?
conduct feasibility studies
evaluate system security
convert to new system
perform detailed analysis of the old system
Which activities correct for design phase?
Develop program and apps
perform maintenance for the system
acquire hardware and software
develop details of the system
Choose the true activities for implementation
allocate resources
evaluate system security
install and test new system
conduct feasibility study
Choose the correct support and security activity
design prototype to proposed system functionality
determine the inefficiency or stability of the new system
showing users how to use the system
determine user's wan, needs and requirement
What is the responsibility of a System Analyst in development team?
designing new computer systems and frameworks
designing and creating software programs
establish a project schedule and determine each phase
supplying material, equipment, hardware, software
A detailed analysis covers all of these EXCEPT
The user's needs and requirements.
Acquire hardware and software.
A recommendation of a solution.
The deficiencies of the old system.
Who should review the detailed design before it is developed?
The developer.
The users.
As many stakeholders as possible.
The ICT support team.
When should users be trained on a new system?
During the Analysis phase.
During the Design phase.
During the Implementation phase.
During the Support & Security phase.
In which phase is the performance of the new system monitored?
During the Analysis phase.
During the Design phase.
During the Implementation phase.
During the Support & Security phase.
An acceptance test is carried out..
When testing the new system with other integrated systems
When testing that the new system works on the hardware.
When testing the new system module by module.
When testing that the new system works with real data and real users
What happens in the design phase?
The code is produced
Planning the solution, look and feel of the software interface
Making changes when the software has been created
Ensuring the requirements are understood
How many types of testing are given in system life cycle? (a)
Which of them is the slowest method of system implementation.
Direct
Parallel
Phased
Pilot
A company that wants the quickest method of implementation.
Direct
Parallel
Phased
Pilot
What do you called where the new system is introduced into one branch or office of the company and its performance assessed before being introduced elsewhere in the company?
Phased implementation
Parallel running
Direct changeover
Pilot running
Which stage checks that the system does what it's supposed to and is working correctly after installation
Implementation
Support & Security
Design
Analysis
What document is produced to identify whether the project is technically possible and worth the cost of development?
Analysis report
Profit and loss account
Feasibility study
Prototype
"While at the supermarket, one of the workers gave me a handout containing questions that I had to answer and return. " Which research method is described above
Questionnaires
Interviews
Collecting Document
Observation
"I went to a company as a system analyst, sat down to see how the current system works. I did not talk to anyone." Which research method is described above?
Questionnaires
Interviews
Collecting Document
Observation
The modification of the software to match changes in the ever changing environment, falls under which category of system maintenance
corrective
adaptive
perfective
preventive
system or software maintenance includes
errors corrections
enhancement capabilities
deletion of obsolete capabilities
all of the mentioned
The Planning phase is the most crucial step in creating a successful system, during this phase you decide exactly what you want to do and the problems you’re trying to solve, by:
Designing numerous items including output, input, databases, programs, procedures and controls
Defining the objectives of the project, as well as end user expectations and requirements
The end-user’s requirements should be determined and documented, what their expectations are for the system, and how it will perform.
Identifying available resources, such as personnel and finances
In which phase is the development team being establish?
During the Analysis phase.
During the Design phase.
During the Planning phase.
During the Support & Security phase.
"My work is to go through the books of the company I am working for in order to establish what data is inputted into the system." In which phase is this activities perform?
During the Analysis phase.
During the Design phase.
During the Planning phase.
During the Support & Security phase.
There are several tools and techniques used for describing the system design of the system. These tools and techniques are: Flowchart, Data flow diagram (DFD), Data dictionary and others.
During the Analysis phase.
During the Design phase.
During the Planning phase.
During the Support & Security phase.
A group of employees can attain large amounts of knowledge at the same time. This statement is refer to which type of training
One-on-one
Classroom Style
Web based
Interactive