Prof Prac CTTO

Total questions: 49

Worksheet time: 1hrs 1mins

Name
Class
Date
1.

"CEC" stands for

a)

Civil Engineering Code

b)

Code of Engineering Consultants

c)

Consultants Ethical Code

d)

Code of Ethical Conduct

2.

Under RA 9266: Suspension and Revocation of Certificates of Registration, Professional Identification Card or the Special / Temporary Permit

a)

Section 22

b)

Section 23

c)

Section 12

d)

Section 10

3.

Not classified under Group 2 - buildings of moderate complexity of plan / design

a)

Public market

b)

Open air recreational facilities

c)

Retail / wholesale stores

d)

Residential condominiums

4.

The responsibility of the Architect in the Construction Phase of the Regular Design Services

a)

Prepares shop drawings

b)

Be held responsible for failure of contractor to carry out work

c)

Makes periodic visits to the site

d)

Makes exhaustive on-site supervision

5.

Any formal grouping of two or more architects or architectural firms working in joint venture on a project basis

a)

Architectural firm

b)

Association

c)

Architectural company

d)

Architectural partnership

6.

Means a juridical entity that shall be synonymous with an Architectural Partnership registered with the SEC

a)

Architectural firm

b)

Architectural company

c)

Architectural corporation

d)

Architectural partnership

7.

Architectural service / phase where the architect and client choose the contractor

a)

Bidding / negotiation phase

b)

Evaluation phase

c)

Construction phase

d)

Contract document phase

8.

A type of pre-design service where the Architect states the project terms of reference (TOR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private)

a)

Architectural programming

b)

Space planning

c)

Design brief preparation

d)

Feasibility study

9.

Cost records purpose

a)

Tax payment

b)

Basis for final compensation of the architect

c)

Counting purposes

d)

Post-auditing of project expenses

10.

Classified under Group 5: Monumental Buildings

a)

Art galleries

b)

Museums

c)

Auditoriums

d)

Exhibition halls

11.

Means a group of two or more Architects duly registered with the SEC and then with the Board of Architecture

a)

Architectural partnership

b)

Architectural company

c)

Architectural corporation

d)

Architectural firm

12.

When computing for compensation using the Multiple of Direct Personnel Expense, the multiplier to be used will range from?

a)

2.5 to 3.5

b)

1.5 to 2.5

c)

1.0 to 2.0

d)

2.0 to 3.0

13.

If an Architect assumes the function of going to the project site for monitoring and supervision, what service is being provided?

a)

Full-time construction supervision

b)

Construction inspector

c)

Construction management

d)

Project supervision

14.

Is it possible for a person who earned a bachelor's degree in Architecture to take up master's degree in Architecture given the fact the s/he is not yet a board passer?

a)

Yes, a bachelor's degree is enough.

b)

Yes, only if s/he is an honor student.

c)

Maybe, depending on the admission requirements of the school.

d)

No, s/he must pass the board exam first.

15.

In what section of RA 9266 can you find the provision that all practicing architects shall maintain a program of continuing professional development?

a)

Section 30

b)

Section 34

c)

Section 24

d)

Section 28

16.

Any head of a government agency or officer(s) of a private firm / institution who violates Section 7 - sub-paragraph of RA No. 8981 shall be punished by imprisonment of not less than:

a)

6 months & 1 day to not more than 6 years, or a fine of not less than Php 50,000 to not more than Php 500,000 or both at the discretion of the court

b)

3 months & 1 day to not more than 6 years, or a fine of not less than Php 50,000 to not more than Php 500,000 or both at the discretion of the court

c)

6 months & 5 days to not more than 6 years, or a fine of not less than Php 100,000 to not more than Php 500,000 or both at the discretion of the court

d)

3 months & 5 days to not more than 6 years, or a fine of not less than Php 100,000 to not more than Php 500,000 or both at the discretion of the court

17.

Under RA 9266: Rating and licensure examination

a)

Section 15

b)

Section 20

c)

Section 11

d)

Section 30

18.

Under the Multiple of Direct Personnel Expense, the multiplier ranges from ________ depending on the office set-up, overhead, and experience of the Architect and the complexity of the project.

a)

1.5 to 3.5

b)

1.0 to 2.5

c)

1.5 to 2.5

d)

1.5 to 2.0

19.

Means a document which forms part of the Architects' National Code which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct

a)

Professional Identification Card

b)

Code of Ethical Conduct

c)

Contract Document

d)

Standards of Professional Practice

20.

In comparative selection, the client issues an invitation to qualified architectural companies. The letter of invitation includes the Terms of Reference for the Project (TOR). Where is the TOR based?

a)

Project framework

b)

Project description

c)

Project contract

d)

Design brief

21.

If in case, equipment fails to function or if a portion of the building collapses due to deficiencies in the plan / design or due to the deficiencies in the manner of construction, what possible liability can a CM assume?

a)

The CM faithfully discharged his function/s during the construction.

b)

The CM participated in the planning / designing approval.

c)

The CM did not participate in the planning / designing approval.

d)

The CM faithfully discharged his function/s during the project implementation.

22.

A guarantee that the execution of work is in accordance with the terms of contract

a)

Proposal bond

b)

Performance bond

c)

Payment bond

d)

Guarantee bond

23.

Structures that belong to Group 3

a)

Theaters

b)

Exposition buildings

c)

Museums

d)

Mausoleums

24.

It is unlawful for any architect to sign his/her name, affix his/her seal or use any other method of signature on architectural plans, specifications, or other documents made under another architect's supervision. Under what section of RA 9266 is this stated?

a)

Section 30

b)

Section 40

c)

Section 10

d)

Section 20

25.

Not included in the fee of the Architect for detailed architectural and engineering design services

a)

Soil test

b)

Air-conditioning system

c)

Auxiliary system

d)

Structural design

26.

Under comparative selection, the first step in the selection process involves invitation. The client issues an invitation which includes the Terms of Reference (TOR) for the project which is based on the ______ prepared by another Architect.

a)

Conceptual framework

b)

Schematic design

c)

Architectural program

d)

Design brief

27.

Government employees and employees of private firms or persons/entities who are not registered and licensed architects shall not perform architectural works in the performance of their official function without the direct supervision of a licensed architect. Such activity shall constitute unauthorized practice of architecture which shall be penalized in accordance with ________ of RA No. 9266.

a)

Section 9

b)

Section 19

c)

Section 29

d)

Section 26

28.

Means a group of professionals in architecture and allied professions, incorporated with Architects for the purpose of delivering professional service in architecture and allied professions; in case an existing Architectural Corporation does not comply with the 75% composition requirement, it shall comply and register again with the SEC and the BOA.

a)

Architectural partnership

b)

Architectural corporation

c)

Architectural firm

d)

Architectural company

29.

Can an Architect be the Architect-of-Record and Architect-in-Charge of construction at the same time?

a)

No, it is against the Civil Code.

b)

It depends on the type of project.

c)

No, they should always be different.

d)

Yes, it is possible.

30.

How many days must an Architect's action on request for payment must be made?

a)

15 days

b)

10 days

c)

20 days

d)

5 days

31.

Any person shall be guilty of misdemeanor and charged in court by the Commission and shall, upon conviction be sentence to a fine of not less than?

a)

Php 150k but not more than Php 5 million to suffer imprisonment for a period not less than 3 months or not exceeding 6 years, or both, at the discretion of the court

b)

Php 100k but not more than Php 5 million to suffer imprisonment for a period not less than 6 months or not exceeding 6 years, or both, at the discretion of the court

c)

Php 100k but not more than Php 5 million to suffer imprisonment for a period not less than 5 months or not exceeding 6 years, or both, at the discretion of the court

d)

Php 200k but not more than Php 5 million to suffer imprisonment for a period not less than 3 months or not exceeding 6 years, or both, at the discretion of the court

32.

In regular design services, it is the phase when an Architect reviews and refines the owner's space requirements and translates it into an architectural program.

a)

Project definition phase

b)

Conceptual design phase

c)

Pre-design phase

d)

Architectural programming

33.

In what phase of the architectural design services does the feasibility study is conducted?

a)

Regular design services

b)

Pre-design services

c)

Specialized allied services

d)

Comprehensive architectural services

34.

What pre-design services involves detailed analysis of the project that will determine the viability of a proposed development? The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.

a)

Value management

b)

Pre-feasibility studies

c)

Space management studies

d)

Economic feasibility studies

35.

Stipulates the procedural and administrative aspects of the contract

a)

Specifications

b)

Owner-contractor agreement

c)

General conditions

d)

Owner-architect agreement

36.

Under what article in RA 9266 provides the conditions for the creation, composition, qualifications, terms of office, powers and functions, compensation of the Professional Regulatory Board of Architecture (PRBoA)?

a)

Article IV

b)

Article I

c)

Article II

d)

Article III

37.

Percent of the professional fee that is component for the civil liability of the architect

a)

15%

b)

10%

c)

5%

d)

20%

38.

After completion of working drawings, specifications, and other documents and upon submission to client, what stage is next?

a)

Bidding / negotiation phase

b)

Contract document phase

c)

Specifications phase

d)

Construction phase

39.

The person that's directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents s/he has signed and sealed.

a)

Consulting Architect

b)

Architect-of-Record

c)

Architect-in-Charge of Construction

d)

Concept Architect

40.

The art, science, or profession of planning, designing, and constructing buildings in their totality taking into account their environment, in accordance with the principles of utility, strength, and beauty

a)

Architecture

b)

General Practice of Architecture

c)

Architect

d)

Engineering

41.

Will the AoR be criminally liable with regards to the plans, projects, and contracts s/he signed and sealed?

a)

No, it is the Design Engineers who are liable.

b)

Yes, the AoR assumes the civil liability.

c)

No, it is the Architect-in-Charge of Construction who assumes the liability.

42.

Not included in the Project Development Cost

a)

Income tax

b)

Cost of site acquisition

c)

Cost of permits

d)

Clearance and utilities

43.

Means a sole proprietorship, a partnership, or a corporation registered with the DTI and/or SEC and then with the Board of Architecture and PRC

a)

Architectural partnership

b)

Architectural corporation

c)

Architectural firm

d)

Architectural company

44.

How many sets of plans/documents are to be given/submitted to the owner under Regular Design Services?

a)

6

b)

4

c)

5

d)

7

45.

Under Pre-Design Services, the cost of printing extra set of drawings, reports, maps, contract documents over the _____ copies submitted to the client, overseas and long distance calls, technical and laboratory tests, licenses, fees, taxes, and similar cost items needed by the project are chargeable to the client.

a)

8 copies

b)

6 copies

c)

7 copies

d)

5 copies

46.

"MoP" means?

a)

Manual of Professionals

b)

Manual of Project

c)

Manual of Procedure

d)

Manual of Practice

47.

Particular section in RA 9266 that refers to Coverage of Temporary / Special Permits

a)

Section 43

b)

Section 38

c)

Section 32

d)

Section 30

48.

In RA 9266, under what article are the conditions for examination, registration, and licensure stated?

a)

Article IV

b)

Article I

c)

Article III

d)

Article II

49.

Not a part of contract documents

a)

Certificate of registration

b)

Drawings

c)

Specifications

d)

Special provisions or conditions