wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Awareness 2 - Module 2

Total questions: 20

Worksheet time: 12mins

Name
Class
Date
1.

Among listed below, which is a part of Asset Management Objective? Please choose 2.

a)

To ensure asset management activities are complied to legislations, regulations, policies and stakeholder's requirement.

b)

Develop Asset Management Strategies to ensure assets is at optimum level of service and maintained at good condition.

c)

Asset information that is integrity, systematic and easily accessible.

d)

Asset Lifecycle Management practices continuously monitored and improved.

2.

How many elements are contained in Asset Management Objective?

a)

3

b)

4

c)

5

d)

6

3.

Please choose the correct combination of main documents that are related to ISO 55001.

a)

Strategic Asset Management Plan (SAMP), Asset Management Plan (AMP), Air Selangor Integrated Management Systems Manual (AIMS)

b)

Air Selangor Integrated Management Systems Manual (AIMS), Guideline of Asset Management Plan (GALM), Asset Management Plan (AMP)

c)

Strategic Asset Management Plan (SAMP), Procedures of Asset Management Plan (PALM), Air Selangor Integrated Management Systems Manual (AIMS)

4.

In 2021, all operational asset of Production has been chosen to be included in ISO 55001 certification.


Please choose the correct combination of Asset Portfolio involved.

a)

Dam/ ORS, River Monitoring System, Water Treatment Plant

b)

Water Treatment Plant, Reservoir, River Monitoring System

c)

River Monitoring System, Water Treatment Plant, Pumping System

5.

In Asset Planning, there are two main strategies outlined in Asset Management Plan as basis for planning for asset lifecycle.


Please choose 2.

a)

Strategic Planning & Initiative (SPI) Projection

b)

Maintenance Strategies & Planning

c)

Growth Projection

d)

Asset Condition

6.

Prior to Asset Registration, asset is classified based on its types. Please choose the correct asset type of asset registered in TAMS - WAMS.


Please choose 2.

a)

Non - Tracked Asset

b)

Tracked Asset

c)

Inventory Asset

d)

Non - Inventory Asset

7.

To satisfy SPAN's requirement, how many calendar days is the processing period for asset from handover date to asset registration on TAMS?

a)

40

b)

30

c)

35

d)

45

8.

In Asset Maintenance, work can be classified based on its work function.


Please choose the correct combination of work category.

a)

Corrective Maintenance, Preventive Maintenance, Predictive Maintenance

b)

Corrective Maintenance, Risk Maintenance, Pre-determined Maintenance

c)

Preventive Maintenance, Predictive Maintenance, Risk Maintenance

d)

Preventive Maintenance, Corrective Maintenance, Risk Maintenance

9.

Preventive maintenance schedules shall contain a list of maintenance triggers, that shall be set at a regular interval.


Please choose the correct combination of Maintenance Trigger in TAMS-WAMS.

a)

Calendar Anniversary, Runtime Anniversary, Calendar Interval

b)

Runtime Anniversary, Maintenance Anniversary, Compliance Interval

c)

Calendar Anniversary, Calendar Interval, Compliance Interval

d)

Maintenance Anniversary, Runtime Anniversary, Calendar Anniversary

10.

For Work Order with cost less than RM 1, the Work Order will be automatically Approved.


Determine if the statement is True of False.

a)

True

b)

False

11.

If auto-close WO function is enabled and Planner does not close the WO, System will automatically close the WO after 60 days from ‘Complete’ WO status.


Determine if the statement is True or False

a)

True

b)

False

12.

For Planned Work Order, it requires approval from Maintenance Manager.


Determine if the statement is True or False

a)

True

b)

False

13.

The standard Asset Condition Score is defined from 1 to 5, where 1 as Very Poor and Required Replacement. While 5 is Very Good and New Condition.


Determine if the statement is True or False.

a)

True

b)

False

14.

How many working day(s) period should AMS Coordinator escalate TAMS – WAMS Registration template to the

authorized person responsible for Asset Registration, i.e. Asset Owner, Developers, Consultants after notification from OD?

a)

One (1)

b)

Two (2)

c)

Three (3)

d)

Four (4)

15.

Work Priority for Work Order is defined from 1 - 9. Among listed below, please choose 2 examples of Low Priority Work (1 - 2).

a)

Routine Work

b)

Scheduled Work

c)

Compliance/ Acts

d)

ERP Red Code

e)

Urgent but not Critical

16.

What are the parameters of Asset Management used for Asset Monitoring and Analysis?


Please choose 4.

a)

Asset Condition Score (ACS)

b)

Failure Mode, Effect and Criticality Analysis (FMECA)

c)

Mean Time Between Failure (MTBF)

d)

Mean Time to Repair (MTTR)

e)

Maintenance Program

17.

Asset Disposal SOP has been documented for all capitalize water assets managed by Air Selangor in AMP.


Among listed below, please choose 3 types of asset category not included in the Asset Disposal SOP.

a)

Administration

b)

IT

c)

Fleet Services

d)

Dam/ORS

e)

WTP

18.

Each asset registered in TAMS – WAMS shall be directly assigned with Asset Criticality

rating. Asset Criticality Rating is rated from 1 - 9, with 1- Extremely High and 9 - Not Critical.


Determine if the statement is True or False.

a)

False

b)

True

19.

Badge number shall be standardized and the prefix suggested

shall describe type of asset. How many digit(s) of badge number is configured in TAMS-WAMS?

a)

5

b)

6

c)

7

d)

8

20.

In TAMS only Non - Tracked assets in ‘In-Store/In-Repair’ status can be changed to ‘Retire’

status. Meanwhile, ‘In-Repair/ In-store/ Out of Service’ status for Tracked assets can be

change to Retire status.


Determine if the statement is True or False.

a)

True

b)

False