1.

"•Determination of the amount and timing of production resources needed to produce finished products as per master production schedule" refers to...

a)

RRP

b)

MRP -1

c)

MRP- 2

d)

Shop Floor Planning

2.

Which of these does NOT appear in the Operations Management Cycle?

a)

Tactical Planning

b)

Evaluation

c)

Maintenance

d)

Control

3.

Production Activity Control involves

a)

Capacity Control and Quality Control

b)

Priority Control and Inventory Control

c)

Priority Control and Capacity Control

d)

Quality Control and Inventory Control

4.

Recently launched SUV from...?

a)
b)
c)
d)
5.

These are steps involved in:

a)

Resource Requirement Planning

b)

Material Requirement Planning

c)

Manufacturing Requirement Planning

d)

Rough- cut Capacity Planning

6.

Master Production Schedule, Materials Requirement Plan and Capacity Requirement Plan appear at which Level of Planning Hierarchy?

a)

Level 1

b)

Level 2

c)

Level 3

d)

Level 4

7.

Why is Production Control Important?

a)

Enables Optimum Utilization of All Resources

b)

It Co-ordinates, monitors and provides feedback to manufacturing management

c)

Enables Low Cost Production and reliable customer service

d)

All of the Above

8.

This represents...

a)

Production Planning System

b)

Resource Requirements Planning

c)

Materials Requirement Planning

d)

Manufacturing Requirements Planning

9.

"Planning, direction and co-ordination of the firm’s facilities to achieve the predetermined production objectives in the most economical manner" refers to

a)

Line of Balancing

b)

Production Planning & Control

c)

Resource Requirement Planning

d)

Shop Floor Planning

10.

"Assignment of Jobs to various work centres or machines for future processing" refers to...

a)

Scheduling

b)

Sequencing

c)

Loading

d)

Expediting

11.

Work Station Selection, Work Flow Analysis, Operation Design... these are part of:

a)

Process Planning System

b)

Resource Requirement Planning

c)

Material Requirement Planning

d)

Manufacturing Requirement Planning

12.

Inventory Transactions Data, Planned Order Schedule, Exception Reports are outputs of

a)

RRP

b)

MRP- I

c)

MRP - II

d)

MPS

13.

This Represents

a)

Production Planning System

b)

Resource Requirement Planning

c)

Material Requirement Planning

d)

Shop Floor Planning & Control

14.

Production / Manufacturing Cycle Time is also refered to as....

a)

Overtime

b)

Load Time

c)

Lead Time

d)

Product Through-Put Time

15.

Which of these is NOT a PPC Function?

a)

Routing

b)

Statistical Quality Control

c)

Inspection

d)

Expediting