wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

24-25 PM1 Charter Creation & Decision Making

Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

Delores is leading a marketing project. She meets with the stakeholders to define and document all the needs for the marketing project. The activity that Delores is participating in is referred to as:

a)

collecting requirements.

b)

controlling the scope.

c)

creating the WBS.

d)

verifying the scope.

2.

Kristi is in charge of planning a charity event for the hospital. She wants to review the requirements of each of the stakeholders. Kristi should be reviewing which document?

a)

requirements documentation

b)

requirements management plan

c)

requirements traceability matrix

d)

work breakdown structure

3.

Jackie is developing a document that will outline the methods to create and manage requirements, as well as the method used to prioritize requirements. Jackie is working on the:

a)

requirements documentation.

b)

requirements management plan.

c)

requirements traceability matrix.

d)

work breakdown structure.

4.

Sam is an event planner and is considering locations for an annual conference. He has decided to ask the board of directors to vote on two locations, so that whichever location receives over 50% of the group's support will win. Sam is using which technique to collect requirements?

a)

dictatorship

b)

majority

c)

plurality

d)

unanimity

5.

Kacie is working on a new car design for an automotive company. She is currently working on a way to analyze, document, and manage all the stakeholder requirements for the new design. Kacie is working on the:

a)

requirements management plan.

b)

requirements documentation.

c)

requirements traceability matrix.

d)

work breakdown structure.

6.

Carol is managing a construction project and is considering relocating her team closer to the project construction worksite. She asks the stakeholders to vote on this decision and will make the move only if they all agree to it. Carol is using which tool or technique to collect requirements?

a)

dictatorship

b)

majority

c)

plurality

d)

unanimity

7.

Peter is working on a respiration project for firefighters. Before finalizing the product requirements, he would like to show a working model to the firefighters at the local station to gather feedback. The technique that Peter should use to test the working model would be a/an:

a)

facilitated workshop.

b)

observation.

c)

prototype.

d)

survey.

8.

The project manager is using group decision-making techniques in

establishing requirements for the food refrigeration project. Which are

the techniques she could use?

a)

autocracy, majority, plurality, and unanimity

b)

dictatorship, majority, plurality, and unanimity

c)

dictatorship, majority, and plurality

d)

majority, plurality, and unanimity

9.

Heather is working on a project to create a new running shoe. She is working with her stakeholders to decide the color combination for the shoe. Heather decides that they will vote, and everyone has to agree on

the color combination. Heather is using which tool or technique to collect requirements?

a)

dictatorship

b)

majority

c)

plurality

d)

unanimity

10.

Angela is meeting with town officials to determine the needs for a transportation project that she is developing. The activity that Angela is participating in is referred to as:

a)

collecting requirements.

b)

controlling the scope.

c)

creating the WBS.

d)

verifying the scope.

11.

Dave's team is breaking down a computer science project into work packages so they can determine milestones. Which process is Dave's team participating in?

a)

collecting requirements

b)

creating the WBS

c)

defining scope

d)

verifying scope

12.

Jo Anne is meeting her curriculum team to break down pieces of the project. At the meeting, she leads her team through the process of decomposing to encompass all of the work on the project. This allows Jo

Anne's team to track, define, and manage each activity. Jo Anne's team is participating in:

a)

collecting requirements

b)

creating the WBS

c)

defining scope

d)

verifying scope

13.

Steve is in charge of building a house, and he is currently working on the project scope statement. Steve has a budget of $250,000 and six months to finish building the house. These components would be listed under

what section in the project scope statement?

a)

project acceptance criteria

b)

project constraints

c)

project deliverables

d)

project exclusions

14.

Tammy is a construction project manager and is currently working on the project scope statement. The stakeholders for this neighborhood project refuse to have a community clubhouse and pool. This requirement would be listed under what section in the project scope statement?

a)

project acceptance criteria

b)

project constraints

c)

project deliverables

d)

project exclusions

15.

Steve is in charge of building a house, and he is currently working on the project scope statement. Steve has collected all necessary requirements from the stakeholders. He has determined that he needs to provide three bedrooms, two bathrooms, and a two-car garage in a 1,700-square-foot house. These components would be listed under what section in the project scope statement?

a)

project acceptance criteria

b)

project constraints

c)

project deliverables

d)

project exclusions

16.

Steve is in charge of building a house, and he is currently working on the project scope statement. Steve has listed the following:

1. We will have good weather on all workdays, so there will be no delay in the building of

the house.

2. All contractors will work efficiently with each other and cause no problems or delays on the house.


These would be listed under what section in the project scope statement?

a)

project acceptance criteria

b)

project assumptions

c)

project constraints

d)

project deliverables

17.

Amber is the project manager employed to run the March of dimes in NC. She is currently working on the project scope statement. She documented that "We collect the personal information we receive offline when you volunteer, donate or participate in our events." What component would this be listed under?

a)

project acceptance criteria

b)

project constraints

c)

project deliverables

d)

project exclusions