The separation of coarse aggregate from the mortar or of water from the other ingredients of freshly mixed concrete, resulting from excessive horizontal movement or free fall of the mix, or from overvibration after placement
Segregation
Stratification
Bleeding
Laitance
The separation of an excessively wet or or overvibrated concrete mix into horizontal layers with increasingly lighter material migrating toward the top
Segregation
Stratification
Bleeding
Laitance
The emergence of excess mixing water on the surface of newly placed concrete, caused by settlement of solids within the mass. Also called water gain.
Segregation
Stratification
Bleeding
Laitance
A milky deposit containing cement and aggregate fines on the surface of new concrete, caused by the bleeding of excess mixing water, overworking of the mix, or improper finishing
Segregation
Stratification
Bleeding
Laitance
The process of leveling, smoothing, compacting, and treating a newly placed concrete surface to produce the desired texture and appearance
Finishing
Formwork
Mixing
Pouring
A wooden or metal straightedge drawn over a newly placed concrete slab to bring it to proper level
Screed
Float
Darby
Trowel
A firmly established grade strip or edge form serving as a guide for making a true level surface on a newly placed concrete slab
Screed
Float
Darby
Trowel
A flat tool for spreading and smoothing a fresh concrete, stucco, or plaster surface
Screed
Float
Darby
Trowel
A long wooden or metal straightedge for smoothing a fresh concrete surface immediately after screeding
Screed
Float
Darby
Trowel
Any of various flat-bladed hand tools for applying, spreading, working, or smoothing plastic material, such as concrete, mortar, and plaster
Screed
Float
Darby
Trowel
A float having a large, flat blade attached to a long handle
Bull float
Power trowel
Edger
Pavement saw
A portable machine having steel trowels mounted on radial arms that rotate about a vertical shaft to smooth, compact, and finish a fresh concrete surface
Bull float
Power trowel
Edger
Pavement saw
A trowel having a long, curved lip for rounding the edges of a fresh concrete slab as it begins to set
Bull float
Power trowel
Edger
Pavement saw
A wheel-mounted, rotary power saw equipped with a silicon-carbide or diamond blade for cutting a control joint in a hardened concrete slab
Bull float
Power trowel
Edger
Pavement saw
The assumption of a rigid or hard state by concrete, mortar, plaster, or glue due to a physical or chemical change
Set
Cure
Heat of hydration
Hydration
To maintain newly placed concrete or mortar at the required temperature and humidity for the first seven days following placement, casting, or finishing to ensure satisfactory hydration of the cementitious materials and proper hardening
Set
Cure
Heat of hydration
Hydration
The heat generated by the process of hydration, as during the setting and curing of a concrete mix
Set
Cure
Heat of hydration
Hydration
The process in which a substance combines chemically with water, as that occurring when cement is mixed with water
Set
Cure
Heat of hydration
Hydration
Exposed concrete required special care in the selection of materials, forming, placing, and finishing to acquire the desired appearance
Architectural concrete
Béton brut
Natural concrete
Cast-in-place concrete
A colored finish produced by sprinkling a dry mixture of cement, sand, and a pigment on a fresh concrete surface following screeding and after any free water has evaporated, and then working the mixture into the surface with a float
Dry-shake finish
Béton brut
Float finish
Broom finish
Concrete left in its natural state after formwork is removed, esp. when the concrete surface reflects the texture, joints, and fasteners of a board form
Dry-shake finish
Béton brut
Float finish
Broom finish
A fine-textured finish obtained by smoothing a fresh concrete, plaster, or stucco surface with a wood float
Dry-shake finish
Béton brut
Float finish
Broom finish
A striated finish obtained by stroking a broom or stiff brush over a freshly troweled concrete surface
Dry-shake finish
Béton brut
Float finish
Broom finish
A decorative finish produced by sandblasting, etching with an acid, or scrubbing a concrete surface after the initial set in order to remove the outer layer of cement paste and expose the aggregate
Exposed aggregate finish
Bushhammered finish
Swirl finish
Trowel finish
A coarse-textured finish obtained by fracturing a concrete or stone surface with a power-driven hammer having a rectangular head with a corrugated, serrated, or toothed face
Exposed aggregate finish
Bushhammered finish
Swirl finish
Trowel finish
A textured finish given to a fresh plaster or concrete surface by troweling with a circular, overlapping motion
Exposed aggregate finish
Bushhammered finish
Swirl finish
Trowel finish
A dense, smooth finish obtained by working a fresh concrete or plaster surface with a steel trowel
Exposed aggregate finish
Bushhammered finish
Swirl finish
Trowel finish
Voids on a formed concrete surface, caused by segregation during placement or by insufficient consolidation
Honeycomb
Spalling
Crazing
The chipping or scaling of a hardened concrete or masonry surface caused by freeze-thaw cycles or the application of deicing salts. Also called scaling.
Honeycomb
Spalling
Crazing
Numerous hairline cracks occurring n the surface of a newly hardened concrete slab as a result of rapid drying shrinkage
Honeycomb
Spalling
Crazing
A reduction in volume of concrete, mortar, or plaster caused by a loss of moisture
Drying shrinkage
Setting shrinkage
A reduction in volume of concrete prior to its final set, caused by hydration of the cement paste
Drying shrinkage
Setting shrinkage