1.

It shall be unlawful for any person to install, remove, or replace any water heater without first _____.

a)

obtaining a plumbing contractor license from the Authority Having Jurisdiction

b)

obtaining a permit from the Authority Having Jurisdiction

c)

having a plumbing journeyman’s license

d)

having permission from the building owner

2.

A vent connector connected to a chimney flue serving a fireplace is _____.

a)

prohibited unless the fireplace flue opening is permanently sealed

b)

prohibited

c)

required to be a direct-vent type

d)

required to use Type B connector

3.

A draft hood-equipped water heater is vented through a concealed space. The portion of the vent passing through the concealed space shall _____.

a)

not exceed 6 feet in length

b)

be a minimum 5 inches in diameter

c)

be listed Type B, Type L, or listed material having equivalent insulating qualities

d)

be a minimum 24 gauge material

4.

The minimum capacity for a storage water heater is _____.

a)

not regulated by code

b)

required to be a minimum of 40 gallons

c)

required to be a minimum of 50 gallons

d)

based on the “first hour rating” and the number of bedrooms and bathrooms

5.

A water heater installed in a residential garage shall be _____.

a)

listed for a garage installation

b)

located or protected from damage by a moving vehicle

c)

located not less than 16 inches above the garage floor

d)

a direct-vent water heater

6.

A final water heater inspection shall be made after _____.

a)

all plumbing fixtures have been installed

b)

all gas appliances have been installed

c)

work authorized by the permit has been installed

d)

the plumber has left the job

7.

A three-bedroom home with two bathrooms is equipped with a gas storage-type water heater. The minimum capacity for the water heater in accordance with the first hour ratings is _____. (OPEN BOOK)

a)

38 gallon

b)

49 gallon

c)

62 gallon

d)

74 gallon

8.

Outdoor combustion air shall be supplied by _____.

a)

1-1/2 inch Schedule 80 PVC

b)

2 inch Schedule 40 PVC

c)

one or two permanent openings

d)

18 gauge round duct

9.

Indoor combustion air supplied by using the “Standard Method” requires a minimum volume of _____.

a)

100 cu. ft. per 1,000 Btu/hr

b)

50 cu. ft. per 1,000 Btu/hr

c)

50 cu. ft. per 2,000 Btu/hr

d)

25 cu. ft. per 2,000 Btu/hr

10.

Combustion air ducts that terminate in an attic shall _____.

a)

be screened at the attic end only

b)

be screened at both ends

c)

not be screened

d)

not be screened unless screen openings are at least 1 inch minimum

11.

Draft hood-equipped and other fuel-burning Category I water heaters may be installed in closets, bedrooms and bathrooms provided _____.

a)

the appliance is listed

b)

the closet is of fire-resistant construction

c)

the closet has a listed, gasketed door assembly and a listed self-closing device

d)

combustion air is provided by adjacent room

12.

Water heaters supported from the earth shall rest on _____.

a)

listed concrete blocks

b)

a level concrete or other approved base

c)

level solid undisturbed earth

d)

a listed base of noncombustible construction

13.

A special gas vent shall only be installed on a water heater if _____.

a)

a gravity vent is not practicable

b)

head height above the water heater is less than 1 foot

c)

it is listed and installed per the listing and the manufacturer’s instructions

d)

the fire department or fire marshal deems it to be necessary

14.

The maximum horizontal length of a 5-inch vent connector for a water heater shall not exceed _____.

a)

3 feet

b)

6 feet

c)

7-1/2 feet

d)

4 feet

15.

Referring to the above drawing for a direct vent appliance with an input of 50,000 Btu or less, the minimum distance at X shall be _____ inches. The minimum distance at Y shall be at least _____ inches.

a)

12, 9

b)

12, 12

c)

9, 12

d)

9, 9

16.

Referring to the above drawing for a direct vent appliance with an input greater than 50,000 Btu, the minimum distance from an opening into a building shall be _____ inches. The minimum distance of the bottom of the vent terminal above finish grade shall be _____ inches.

a)

12, 9

b)

12, 12

c)

9, 12

d)

9, 9

17.

A Type B vent with a listed cap of 14 inches shall terminate at least _____ higher than any portion of a building within 10 feet.

a)

1 foot

b)

2 feet

c)

18 inches

d)

3 feet

18.

When using an alternative method of sizing with two vent connectors for draft hood-equipped water heaters, the effective area of the common vent connector or vent manifold and all junction fittings shall not be less than the area of the larger vent connector plus _____ percent of the areas of smaller flue collar outlets.

a)

50

b)

75

c)

25

d)

10

19.

Where utilizing louvers and grills to provide combustion air, and the design and free area are not known, it shall be assumed that wood louvers will have _____ percent free area and metal louvers and grills will have _____ percent free area.

a)

50, 25

b)

25, 75

c)

25, 50

d)

50, 75

20.

Exit terminals of mechanical draft systems shall not be less than _____ above grade where located adjacent to public walkways.

a)

6 feet

b)

7 feet

c)

10 feet

d)

8 feet

21.

Clearances for listed water heaters shall be _____.

a)

a minimum of 1 inch to combustible construction

b)

a minimum of 2 inches to combustible construction

c)

in accordance with their listing and the manufacturer’s instructions

d)

a minimum of 6 inches to unprotected combustible construction

22.

A Type B gas vent shall terminate at least _____ feet above the highest connected equipment draft hood or flue collar.

a)

12

b)

6

c)

5

d)

10

23.

Indirect-fired water heaters that incorporate a single-wall heat exchanger shall _____.

a)

(A) have a maximum operating pressure in the heat exchanger not exceeding the maximum operating pressure of the potable water supply

b)

(B) have a heat-transfer medium of potable water or other nontoxic fluid recognized as safe by the FDA

c)

(C) bear the proper “caution” labels

d)

(D) meet all of the above

24.

The passageway for a water heater in an attic shall be unobstructed and shall have a solid flooring not less than _____ inches wide from the entrance opening to the water heater.

a)

22

b)

30

c)

24

d)

36

25.

For attic installation, the passageway and servicing area adjacent to the appliance shall be _____.

a)

identified

b)

well lighted

c)

dry

d)

floored

26.

For each additional elbow up to and including 45 degrees, the maximum vent connector capacity listed in the venting tables, where two 90 degree elbows are used, shall be reduced by what percentage?

a)

.5

b)

5

c)

6.25

d)

50

27.

The code requirement for “an adequate supply of potable running water” is for _____.

a)

cleansing and sanitation

b)

protection of trap seals

c)

water-cooled equipment

d)

hydronic systems

28.

The primary reason for installing backflow prevention assemblies is to _____.

a)

prevent excessive pressure

b)

prevent mixing of hot and cold water

c)

prevent pollution or contamination of the potable water supply

d)

prevent scalding

29.

Ballcocks in water closet tanks shall be installed so that the critical level of the water inlet is above the full opening of the overflow pipe at least _____.

a)

1/2 inch

b)

1 inch

c)

3 inches

d)

6 inches

30.

Minimum height of the atmospheric vacuum breaker critical level above of a urinal equipped with a flushometer valve: _____

a)

1 inch

b)

3 inches

c)

6 inches

d)

12 inches

31.

Minimum height of the atmospheric vacuum breaker critical level above the overflow rim of a tank, vat or swimming pool: _____

a)

1 inch

b)

2 inches

c)

6 inches

d)

12 inches

32.

Minimum height of the atmospheric vacuum breaker critical level above all downstream piping for lawn sprinkler system: _____

a)

1 inch

b)

6 inches

c)

12 inches

d)

24 inches

33.

PEX tubing shall not be installed within the first _____ of piping connected to a water heater.

a)

12 inches

b)

18 inches

c)

24 inches

d)

36 inches

34.

Each outlet on a nonpotable water system that is used for special purposes shall be posted _____.

a)

DANGER – PROCESSED WATER

b)

DANGER – CONTAMINATED WATER

c)

DANGER – POLLUTED WATER

d)

CAUTION – NONPOTABLE WATER DO NOT DRINK

35.

All malleable iron water fittings shall be _____.

a)

2 inch or smaller

b)

galvanized

c)

flanged

d)

removed

36.

Water valves 2-1/2 inches and larger may have bodies that are _____.

a)

galvanized

b)

die-cast

c)

aluminum core

d)

cast iron

37.

Changes in direction of copper tubing may be made with _____.

a)

non deforming bending equipment

b)

heat annealing

c)

ferrous fittings

d)

plastic fittings

38.

Water piping systems shall be designed on the basis of the _____.

a)

maximum pressure

b)

minimum pressure

c)

average residual pressure

d)

average service pressure

39.

Copper water tube Type “M” may be installed within a building _____.

a)

below slab only

b)

above ground only

c)

for cold water only

d)

if it is wrapped

40.

After allowing for friction and other pressure losses, the residual water pressure shall be at least _____.

a)

.433 psi

b)

7.5 psi

c)

15 psi

d)

29 psi

41.

Combination temperature and pressure relief valves shall be installed _____.

a)

based on their listing requirements and the manufacturer’s instructions

b)

within 3 inches to 6 inches of the water heater

c)

in lieu of pressure-relief valves

d)

on all nonstorage-type water heaters

42.

Galvanized steel piping installed under a concrete floor slab within a building shall _____.

a)

have a machine-applied coating

b)

have a spiral wrap

c)

be installed without joints

d)

be installed with brazed joints

43.

Water piping may be installed in the same trench with less than 12 inches of separation from a building sewer constructed of _____.

a)

cast iron

b)

clay

c)

asbestos cement

d)

bituminized fiber

44.

Building supplies shall be no smaller than that required for the installation and, in no case, smaller than _____ inch(es).

a)

1/2

b)

3/4

c)

1

d)

2

45.

The type of valve required on a building supply to any building is a _____.

a)

fullway valve

b)

corporation valve

c)

butterfly valve

d)

globe valve

46.

Other than systems sized by the use of Table 610.4, the maximum velocity of a cold water system containing copper and copper alloy tube and fittings shall be limited to _____.

a)

5 feet per second

b)

8 feet per second

c)

10 feet per second

d)

15 feet per second

47.

Discharge piping serving a pressure-relief shall be provided with a _____.

a)

full size drain

b)

check valve to prevent backflow

c)

trapped drain line

d)

drain that terminates 30 inches or more above grade

48.

Hard-drawn copper tubing, marked with a blue stripe, is referred to as _____.

a)

Type “K”

b)

Type “L”

c)

Type “M”

d)

Type “DWV”

49.

The color stripe on Type “K” hard-drawn copper tubing is _____.

a)

green

b)

blue

c)

red

d)

yellow

50.

Whenever fixtures and/or fixture fittings are installed that require a residual water pressure higher than 15 pounds per square inch _____.

a)

(A) that minimum pressure shall be provided

b)

(B) provisions shall be made to use fixtures that do not require

c)

(C) the piping system shall be not less than copper tubing Type L

d)

(D) A and C apply

51.

The duration for a water system pressure test shall be for a period of not less than _____ minutes.

a)

5

b)

10

c)

15

d)

30

52.

Except as required in Section 601.3.3, nonpotable water systems shall have a _____ with black uppercase lettering, with the words “CAUTION: NONPOTABLE WATER, DO NOT DRINK.”

a)

white background

b)

blue background

c)

green background

d)

yellow background

53.

Any water system that prevents dissipation of building pressure back into the water main shall be provided with an approved, listed, and adequately sized _____ or other approved device.

a)

double-check valve

b)

expansion tank

c)

temperature & pressure relief valve

d)

PRV

54.

Solder and fluxes used in piping systems conveying potable water are prohibited when the lead content exceeds _____ percent.

a)

0.2

b)

0.5

c)

1

d)

1.5

55.

The minimum wall thickness for threaded plastic pipe (not molded fittings) shall be _____.

a)

Schedule 40

b)

ScheduIe 80

c)

1/8 inch

d)

1/16 inch

56.

Heat-fusion weld joints _____.

a)

are used in some thermoplastic systems

b)

are low-temperature, metallic pipe welds

c)

require prior approval of an Authority Having Jurisdiction

d)

may be used in drainage systems but not pressure systems

57.

A _____ joint is an example of a mechanical joint for CPVC Plastic pipe.

a)

welded

b)

soldered

c)

solvent welded

d)

flanged

58.

A type of plastic water piping that may be tested with air is _____.

a)

PVC

b)

CPVC

c)

PP

d)

PEX

59.

Three-inch horizontal drainage piping shall have a grade or slope of not less than _____.

a)

1/4 inch per foot

b)

1/8 inch per foot

c)

1/2 inch per foot

d)

1 inch per foot

60.

The maximum fixture unit loading allowed on a 2 inch waste stack is _____.

a)

four

b)

six

c)

eight

d)

sixteen

61.

The maximum trap loading for a 3 inch trap is _____.

a)

one unit

b)

three units

c)

four units

d)

six units

62.

The minimum size trap and trap arm for a bathtub is _____.

a)

1-1/2 inches

b)

2 inches

c)

2-1/2 inches

d)

3 inches

63.

The maximum discharge capacity for intermittent flow only, in gallons per minute, for one fixture unit is equal to _____.

a)

7-1/2 gpm

b)

15 gpm

c)

30 gpm

d)

50 gpm

64.

The minimum size drain line for a wall-hung urinal is _____ inches.

a)

2

b)

1-1/4

c)

1-1/2

d)

3

65.

The discharge line from an ejector shall be provided with a backwater valve, _____.

a)

or swing check valve, and gate valve

b)

or double check valve, and globe valve

c)

spring-loaded check valve, and union

d)

gate valve, and flange

66.

A horizontal drain pipe has an existing load of 30 fixture units. After adding a new discharge pipe from an ejector rated at 60 gpm, the total load on the horizontal drain pipe will be _____.

a)

90 fixture units

b)

120 fixture units

c)

130 fixture units

d)

150 fixture units

67.

The total number of fixture units at “A” is _____.

a)

16

b)

20

c)

22

d)

24

68.

The minimum size pipe at “B” is _____.

a)

1-1/2 inches

b)

2 inches

c)

1-1/4 inches

d)

2 1/2 inches

69.

The number of fixture units at “C” is _____.

a)

2

b)

4

c)

6

d)

8

70.

The minimum size trap at “D” is _____.

a)

1-1/2 inches

b)

2 inches

c)

3 inches

d)

4 inches

71.

Of those listed, the appropriate fitting at “E” would be a _____.

a)

drainage wye

b)

drainage tee

c)

combination Y and 1/16 bend

d)

long sweep 90˚ bend

72.

The cleanout opening at “F” shall be at least _____.

a)

2 inch

b)

2-1/2 inch

c)

3 inch

d)

4 inch

73.

The minimum size trap arm at “G” is _____ inch.

a)

2

b)

2-1/2

c)

3

d)

4

74.

The maximum fixture units allowed on a 4-inch horizontal drain with a 1/8 inch per foot slope is _____. (OPEN BOOK)

a)

256 fixture units

b)

225 fixture units

c)

215 fixture units

d)

173 fixture units

75.

A straight run of building sewer will require cleanouts at intervals not to exceed _____.

a)

50 feet

b)

75 feet

c)

100 feet

d)

300 feet

76.

With appropriate cause and Authority Having Jurisdiction approval, building sewers 8 inches or larger shall be permitted to have a slope of not less than _____.

a)

1/16 inch per foot

b)

1/8 inch per foot

c)

1/4 inch per foot

d)

1/2 inch per foot

77.

The drainage fixture unit value assigned to a bathtub or combination bath/shower is _____.

a)

1.5

b)

2.0

c)

2.5

d)

3.0

78.

A connection to the public sewer, or private sewage disposal system, is required for _____.

a)

buildings with or without plumbing fixtures

b)

buildings with plumbing fixtures

c)

buildings with emergency drain systems

d)

buildings with storm drain systems

79.

All indirect waste piping that requires an airgap shall discharge into the building drainage system through _____.

a)

an automatic vent

b)

an airgap of two pipe diameters

c)

a drainage airgap of 1 inch minimum

d)

a trap

80.

Except for refrigeration coils and ice-making machines, the minimum size of the indirect waste pipe shall not be smaller than the drain on the unit and not smaller than _____ inch(es).

a)

3/4

b)

1

c)

1-1/4

d)

1-1/2

81.

Drains, overflows, or relief pipes from a water distribution system shall discharge to the building drain by _____.

a)

indirect waste by means of a water-distribution airgap

b)

direct connection to the building drain

c)

direct connection to the building drain through a trap

d)

indirect waste piping through a vented trap

82.

Devices that are not regularly classified as plumbing fixtures, but which have drip or drainage outlets, shall be drained by _____.

a)

a connection directly to the building

b)

indirect waste pipes discharging into an open receptor through an airgap or airbreak

c)

indirect waste piping connected to the building drain

d)

direct connection to a storm sewer

83.

The developed length from the fixture outlet of a bar sink to the receptor shall not exceed _____ feet.

a)

6

b)

5

c)

3

d)

15

84.

A standpipe for a clothes washer shall have a minimum and maximum length of _____.

a)

4 inches and 12 inches

b)

18 inches and 30 inches

c)

18 inches and 24 inches

d)

12 inches and 36

85.

No drain, overflow, or relief vent from a water supply system, or any other discharges under pressure shall be discharge to the drainage system _____.

a)

by means of indirect waste through an airgap or airbreak

b)

by direct connection

c)

through the garbage disposal

d)

with a branch wye tailpiece

86.

1. Drinking fountains may be installed with _____.

a)

a hose connection

b)

a condensate pump

c)

a Hartford loop

d)

indirect waste

87.

1. _____ shall not be used for chemical or industrial waste that requires pretreatment.

a)

Glass

b)

PVC

c)

Cast-iron

d)

Copper tube

88.

Whenever practicable, all piping receiving chemical waste shall be _____.

a)

concealed

b)

readily accessible

c)

covered

d)

in clear view

89.

No chemical waste vent shall _____.

a)

(A) terminate outside the building

b)

be connected to any vent from water service lines

c)

intersect vents for other services

d)

connect to any waste line

90.

When discharged into the drainage system, condensate shall drain by means of a(an) _____.

a)

indirect waste pipe

b)

direct waste pipe

c)

Johnson Tee

d)

backflow preventer

91.

The minimum size condensate waste pipe from a 12-ton refrigeration unit is _____.

a)

3/4 inch

b)

1 inch

c)

1-1/4 inches

d)

1-1/2 inches

92.

1. Vent pipes protect fixture traps against _____.

a)

evaporation

b)

siphonage

c)

clogging

d)

cross-connections

93.

4. One factor for determining the size of a vent pipe is _____.

a)

its accessibility

b)

its length

c)

the type of building

d)

the price of material

94.

5. The combination of vent pipes that will provide sufficient aggregate cross-sectional vent area for required a 4-inch house sewer is _____.

a)

1 - 2 inch and 4 – 1-1/2 inch

b)

2 - 2 inch and 1 – 2-1/2 inch

c)

3 - 2 inch and 1 – 1-1/2 inch

d)

4 - 2 inch

95.

7. The diameter of an individual vent shalI not be less than _____.

a)

1-1/4 inches

b)

1-1/2 inches

c)

2 inches

d)

3 inches

96.

8. The distance “X” in the sketch above shall be at Ieast _____.

a)

1 inch

b)

2 inches

c)

6 inches

d)

12 inches

97.

10. The vent pipe opening is above the crown weir of the trap in _____.

a)

sketch “A”

b)

sketch “B”

c)

sketch “C”

d)

sketches “A” and “B”

98.

11. A 2-inch vent pipe will serve a total of _____.

a)

14 bathtubs

b)

16 showers

c)

24 lavatories

d)

15 water closets

99.

12. Each vent pipe or stack shalI extend through its flashing and shall terminate vertically above the roof at least _____.

a)

6 inches

b)

12 inches

c)

18 inches

d)

24 inches

100.

18. Parallel vent stacks are required for drainage stacks that extend above the building drain _____.

a)

five stories or more

b)

10 stories or more

c)

50 feet

d)

100 feet

101.

19. The parallel vent stack shall be connected to the drainage stack by means of a _____.

a)

circuit vent

b)

loop vent

c)

yoke vents

d)

continuous vents

102.

21. Horizontal vent pipes shall be level or so graded as to drip back by gravity to _____.

a)

the main vent pipe

b)

the main soil stack

c)

the loop vent

d)

the drainage pipe they serve

103.

25. A drainage stack extends 14 stories above the building drain and is served by a parallel vent stack. A relief yoke vent connection between the vent stack and the drainage stack is required at _____.

a)

floors 5 and 10

b)

floors 4 and 9

c)

floors 4 and 10

d)

floors 5 and 9

104.

26. The fitting that is required for making the yoke vent intersection with the drainage stack is a _____.

a)

sanitary tee

b)

tapped tee

c)

double tee branch

d)

wye branch

105.

34. The pipe section between the kitchen sink inlet and the lavatory inlet (point “A”) serves as a _____.

a)

vent pipe for the kitchen sink

b)

waste pipe for the lavatory

c)

vent pipe for the lavatory

d)

both A and B

106.

The total number of fixture units at point “B” is _____.

a)

one unit

b)

two units

c)

three units

d)

four units

107.

38. The sketch represents _____.

a)

reverse circuit loop venting

b)

continuous waste and vent

c)

special venting for island fixtures

d)

combination waste and vent

108.

39. The pipe section at “A” is called a _____.

a)

foot vent

b)

yoke vent

c)

loop vent

d)

fixture vent

109.

42. The type of fitting acceptable at “D” is a _____.

a)

sanitary tee

b)

sanitary tapped tee

c)

90-degree elbow

d)

90-degree sweep

110.

44. The maximum length for piping “C” without a vent is _____.

a)

5 feet

b)

10 feet

c)

15 feet

d)

25 feet

111.

45. The minimum size (diameter) of the tailpiece for the floor drain served by “A” is _____.

a)

1-1/2 inches

b)

2 inches

c)

2-1/2 inches

d)

3 inches

112.

47. The minimum size (diameter) for vent piping “B” shall be approximately equal to _____.

a)

the cross-sectional area of the drain pipe served

b)

one-half the inside cross-sectional area of the drain pipe served

c)

the size of the uppermost trap

d)

one-half the size of the uppermost trap

113.

50. Horizontal wet venting _____.

a)

is not permitted by the code

b)

shall be permitted for public bathrooms

c)

shall be permitted for a bathroom group located on the same floor level

d)

shall be a minimum 4 inches in size

114.

55. The _____ fixture drain or trap arm connection to the wet vent shall be downstream of fixture drain or trap arm connections to the horizontal branch.

a)

shower

b)

floor drain

c)

water closet

d)

bathtub

115.

64. Fixtures, other than circuit vented fixtures, located on the same floor as circuit-vented fixtures shall be either common vented or _____.

a)

individually vented

b)

wet vented

c)

island vented

d)