Week 10 - Fault Tree Analysis

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

FTA is a ____________ method.

a)

down-top

b)

top-down

c)

straight

2.

A fault tree shows the logical relationships between events and ____________ that lead to failure.

a)

logic

b)

gates

c)

causes

3.

A fault tree analysis (FTA) is a _____________ analytical tool.

a)

simple

b)

deductive

c)

different

4.

FTA can be used as a useful tool in ___________

a)

accident investigations

b)

safety documentation

c)

inspection logs

5.

Using this fault tree, a non-technical person with minimal training can determine the combination and alternatives of events that may lead to failure or a hazard.

a)

True

b)

False

6.

The main drawback of FTA is that it examines only ________ top event(s) at a time.

a)

one

b)

two

c)

three

7.

The _____________ is the main building block for the analytical tree

a)

oval

b)

circle

c)

rectangle

d)

triangle

8.

A circle represents a ____________ event in the tree.

a)

main

b)

underdeveloped

c)

negative

d)

base

9.

The two primary components of a fault tree are ___________ and __________ gates.

a)

logic - cause

b)

logic - event

c)

cause - event

10.

The first stage of FTA is to______________

a)

know the system

b)

validate the tree

c)

construct the tree

d)

define the top event

11.

The triangle in FTA signifies a __________________ of a fault tree branch.

a)

lack of information

b)

special circumstances

c)

transfer

12.

The Fault Tree needs to be validated for completeness and _____________.

a)

review

b)

accuracy

c)

top event

13.

When all the causes and sub-causes have been identified, the next stage is to _______________ the fault tree.

a)

construct

b)

validate

c)

evaluate

14.

In ____________ gate, both input together result in the output

a)

AND

b)

OR

c)

Logic

15.

The FTA process is used to solve only management issues.

a)

True

b)

False

16.

Which of these are the benefit of FTA? [choose all that apply]

a)

extensive process

b)

reliability of the system

c)

one top event

d)

meaningful data

17.

FTA can account for human error.

a)

True

b)

False

18.

Tradeoffs refer to __________________ implemented.

a)

top-down methods

b)

alternative methods

c)

deductive methods

19.

Tree branches stop in FTA when all events leading to the base event are complete.

a)

True

b)

False

20.

The overall success of FTA depends on _________.

a)

the cost of analysis

b)

the skill of analyst

c)

the top events

d)

the anticipated failures