wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

TUTORIAL 2 ECM442

Total questions: 10

Worksheet time: 19mins

Name
Class
Date
1.

How many types of standard available in Malaysia as a reference to prepare bill of quantities

a)

3

b)

1

c)

2

d)

7

2.

Write the full name for SMM and CESMM

4 lines
3.

In your own word, define the main function of standard in preparing bill of quantities. 

4 lines
4.

Explain the difference between building works and Civil Engineering works.

4 lines
5.

The unit for concrete slab in BQ by referring to SMM.

a)

m

b)

m2

c)

m3

d)

kg

6.

Explain in details 1 current practice of standard method of measurement in Malaysia that you have learnt.

4 lines
7.

Provide 3 reasons the need to standardized a BQ.

4 lines
8.

Define the party to prepare the quantities in BQ for Civil Engineering works.

a)

Quantity surveyor

b)

Architect

c)

Civil engineer

d)

Client

9.

Which country is Malaysia referring to as benchmark to produce and practice the standard in preparing the BQ.

a)

US

b)

UK

c)

South Korea

d)

Singapore

10.

Provide 2 differences between SMM and CESMM.

4 lines