1.
When a PBI (Product Backlog Item) is assigned to a developer, he or she is ultimately accountable for it.
a)
true
b)
false
2.
Creating a Definition of Done is considered a technical job that is why it is done exclusively by the Developers in a Scrum Team. The Product Owner and the Scrum Master do not have a say.
a)
false
b)
true
3.
Who is required to attend the Daily Scrum event?
a)
The Scrum Master and Product Owner
b)
The Whole scrum team
c)
The Developers and Product Owner(because she is actively working on PBIs)
4.
When does the Product Owner cancel a Sprint?
a)
When there is a budget constraint
b)
When Developers cannot complete all of the PBI's
c)

When Sprint Goal becomes obsolete

5.
The Sprint Goal became obsolete and as a result, the Product Owner has decided to cancel the Sprint. What do we do with the PBIs that are completed (based on the Definition of Done)?
a)
We move the items to the product backlog
b)
We move the items to the next sprint backlog
c)

Items are reviewed.Most likely, the scrum team will release them back to PBI

6.
Who is accountable for the Sprint Backlog?
a)
The Product Owner
b)
The Project Manager
c)
The Scrum Master
d)
The Developers
7.
Who is responsible for engaging with stakeholders?
a)
The Product Owner
b)
The Scrum Master
c)
The Developers
8.

What could be reasons for the Scrum Master to attend the Daily Scrum event? (Select 2 best answers)

a)
The developers asked the scrum master to attend
b)
To measure the performance of the sprint
c)
To make sure every developer has enough tasks to work on
d)
To facilitate the daily scrum event
e)
He or she is not allowed to skip the daily scrum event
9.
Who is accountable for the Scrum Team’s effectiveness?
a)
The Project Manager
b)
The Scrum Master
c)
The Whole scrum team
d)
The Developers
e)
The Product Owner
10.
What can be considered a feedback loop? (Select 4)
a)
Sprint Planning
b)
Sprint Review
c)
Daily Scrum
d)
Product Backlog Refinement
e)
Sprint Retrospective
11.
Which sentences best describe the Increment? (Select 4)
a)
The increment includes all increments from previous sprint
b)
All PBIs that were completed (based on DOD) during the sprint
c)
The scrum team decides when to release the increment
d)
All increment is a concrete stepping stone towards the product goal
e)
The increment must be released after each sprint
12.

What would happen when the Developers obtain solid experience?

(Select 2)

a)
They might update DOD
b)
They may skip Sprint retrospective meetings
c)
They would not need a scrum master anymore
d)
Their velocity would increase
13.
Which statements are correct about the length of the Sprint? (Select 2)
a)
A longer length of the sprint is preferred when the project is riskier
b)
The scrum team decides the length of the sprint during sprint planning (according to work)
c)
The maximum duration of the sprint is 1 month
d)
The length of the sprint should not be changed too frequently
14.

A Scrum Team works on a software product. When do developers integrate the code?

a)
Just before the sprint review event
b)
Before each release
c)
Frequently at various times a day
d)
In front of customer ,during sprint review
15.

How often does the Scrum Master measure the performance of the Sprint?

a)
At the beginning of the each week
b)
Once per day
c)
The Scrum Master doesnot do it
d)
Once per sprint
16.
Technical debt should be removed by performing a “hardening” Sprint before the release of the increment.
a)
false
b)
true
17.
The Developers of a Scrum Team have been working together for 3 years. They have a lot of experience and know each other very well. In this case, they can remove the Scrum Master.
a)
false
b)
true
18.
Which of the options below are NOT Mandatory in Scrum? (Select 3)
a)
Planning Poker
b)
Story Points
c)
Product Goal
d)
Sprint Goal
e)
Burndownchart
19.
The Developers have chosen several items to put in the Sprint Backlog. Several days go by and they come to the conclusion that some of the items are not needed to achieve the Sprint Goal. What should the developers do?
a)
Leave the items in the sprint and do as many items as they can
b)
Cancel the sprint
c)
Remove the items from the sprint if the PO agrees
d)
Consult with the scrum master and remove the items form the sprint
20.
In the middle of the Sprint, the customer comes up with a “very important feature” that should be added to the Sprint Backlog. She asks the Developers to add it and start working on it ASAP. What should the developers do?
a)
Estimate the PBI,add it to the product backlog and remove a PBI of the same estimate
b)
Write a PBI in the sprint backlog
c)
Write a PBI in the product backlog
d)
Ignore the sutomer
e)
Politely explain the customer she needs to speak with PO
21.
What is mandatory in Scrum? (Select 3)
a)
Product Goal
b)
QA Speacialist
c)
Project Manager
d)
Product Backlog
e)
Sprint Retrospective
22.
The Scrum Team has decided there would be 4 releases in the project. Which of the following statements are correct? (Select 2)
a)
The Scrum team decides which increments should be releasable and which shouldn’t
b)
All increments should be usable
c)
Only the increments before the releases should be releasable
d)
The 4th increment includes all previous increment
23.
Who creates the Definition of Done (DoD)?
a)
The whole scrum team
b)
The Chief Technical Architect
c)
The Developers
d)
The Product Owner
24.
Who measures the performance of the project in Scrum?
a)
The Product Owner
b)
The CTO
c)
The Project Manager
d)
The Developers
e)
The Scrum Master
25.
The Product Owner can be a Developer in the same Scrum Team.
a)
true
b)
false
26.
Who is responsible for managing the Product Backlog?
a)
The Developers
b)
The Product Owner
c)
The Customer
d)
The Scrum Master
e)
The Team Leader
27.
What would happen if 2 new developers join the team?
a)
Short reduction in productivity
b)
Twice as mich PBIswould be done
c)
An immediate increase in productivity
28.

Which of the sentences below are not true about the Developers in a Scrum Team? (Select 2)

a)
Decide when to release the increment
b)
Monitor the progress of the sprint
c)
Make changes to the sprint backlog
d)
Participate in the daily scrum event
e)
Monitor the progress of the project
29.
The developers are working on a product that is going well. However, during Sprint 7, they have a hard time understanding some of the items in the Sprint Backlog. What should they do?
a)
The developers can work on the items they understand and all the rest put in the product backlog
b)
Ask the scrum master to intervene and help out
c)
Ask the PO to explain the items clearly and add acceptance criteria
d)
Consult with customer to find out what exactly should be done
30.
Who makes decisions regarding product releases?
a)
The whole scrum team
b)
The Developers
c)
The Scrum Master
d)
The Product Owner
e)
The Customer
31.
The Scrum Team consists of…?
a)
10 or fewer people
b)
3-9 people
c)
2-6 people
d)
10 or more people
32.
What is a valid service from a Scrum Master to a Product Owner? (Select 4)
a)

Helping the Scrum Team understand the need for clear and concise Product Backlog items

b)
Helping find techniques for effective Product Goal definition and Product Backlog management
c)
Facilitating stakeholder collaboration as requested or needed.
d)
Helping the Scrum Team focus on creating high-value Increments that meet the Definition of Done
e)
Helping establish empirical product planning for a complex environment
33.
During the Sprint, the Developers and the Product Owner do Product Backlog Refinement. The Product Owner has clearly explained a PBI to the Developers. The Scrum Team uses story points as a unit of measurement. The developers estimate the PBI at 10 Story Points, but the Product Owner doesn’t agree with that. She believes the PBI should be estimated at 5 Story Points. Which size would be more accurate?
a)
What the PO suggested because she got the requirements from the customer and she knows best how much work is needed to fulfill these requirements
b)
What the Developers suggested because they do the work and the sizing of the PBIs
34.
The Developers are trying to convince the Product Owner to change the order of an item in the Product Backlog.
a)
This is acceptable because the developers may know something PO doesn't
b)
This is unacceptable because PO is accountable for the ordering of PBI
35.
Who has the authority to cancel a Sprint?
a)
The Customer
b)
The Developers
c)
A sprint cannot be cancelled
d)
The Product Owner
e)
The CTO
36.
Who creates the Sprint Goal?
a)
The Developers
b)
The Scrum Master
c)
The Customer
d)
The scrum team
e)
The Product Owner
37.
Select the Commitments that go with each Scrum Artifact.
a)
The Definition of Done
b)
The Product Vision
c)
The Sprint Goal
d)
The Product backlog
e)
The Product Goal
38.
Who determines how many items to select for the Sprint Backlog?
a)
The Scrum Master
b)
The Customer
c)
The Product Owner
d)
The Team Leader
e)
The Developers
39.
Each developer must answer the 3 questions during Daily Scrum. (What did I do yesterday? What will I do today? Do I see any impediments?)
a)
true
b)
false
40.

What would be an accurate activity to do during Sprint Retrospectives? (Select 3)

a)
Discuss newly created items that deal with techinical debt
b)
Discuss on Definition of Done
c)
Discuss the way the developers work to reduce techinical debt
d)
Discuss complex PBI
e)

Discuss length of sprint

41.
Which sentences best describe the Sprint Planning event? (Select 3)
a)
We discuss how the last sprint went with regards to individuals, interactions,processes,tools and DOD
b)
Sprint Planning is of eight hours for a one-month Sprint
c)
We discuss how and what we want to accomplish but also why it matters
d)
The whole scrum team attends
e)
We discuss how and what we want to accomplish but also who will do it
42.
What happens between Sprint #5 and Sprint #6?
a)
Nothing
b)
Its time to have a special event to discuss technical debt
c)
The SM must officially give sprint #6 a start
43.
What is the maximum duration of a Sprint?
a)
4 Weeks
b)
1 Week
c)
2Weeks
d)
3 Weeks
44.

Besides the official events, Scrum allows other events.

a)
false
b)
true
45.
The Sprint Review event is a formal event for inspection and adaptation.
a)
true
b)
false
46.
What are the outputs of the Sprint Planning event? (Select 2)
a)
Projected capacity of the developers
b)
The definition of done
c)
The Sprint Goal
d)
A high priority process improvement
e)
The Sprint Backlog
47.
The Daily Scrum event is held at the same time and place every working day of the Sprint.
a)
false
b)
true
48.

What should NOT happen during a Sprint? (Select 2)

a)
Change in the Sprint backlog
b)
Change in the product backlog
c)
chnages that would endanger the sprint goal
d)
A decrease in quality goals
49.
It is not mandatory to have a Product Goal as long as the Product Owner creates a Product Vision.
a)
true
b)
false
50.
The Definition of Done is the commitment for the Product Backlog.
a)
false
b)
true
51.
When are PBIs considered ready for selection in a Sprint Backlog (during Sprint Planning). (Select 2)
a)
When the PBIs are refined based on DOR
b)
When the PO has clearly explained the most intricate PBIs and developers understand them
c)
When the PBIs can fit into one sprint
d)
When the description of the PBIs is written in a User story format
52.
The Sprint Backlog contains at least one item about improving the way we work
a)
true
b)
false
53.
The Sprint is over when…(select 2)
a)
The sprint goal becomes obsolete
b)
All the PBIs from the sprint backlog are completed according to DOD
c)
The duration of the timebox is over
d)
The customer cancels it
54.
What is considered a long-term objective for the Scrum Team?
a)
The product goal
b)
The product vision
c)
The sprint goal
d)
The project goal
55.
The Sprint Backlog consists of… (select all that apply).
a)
The sprint goal
b)
The definition of done
c)
The PBIs selected for the sprint
d)
The product vision
e)
An actionable plan delivering the PBIs
56.
Before we start the first Sprint, the Product Backlog must be complete.
a)
true
b)
false
57.
Which sentences best describe the Product Backlog? (Select 3)
a)
The product backlog is never complete
b)
The biggest items(PBIs) should be top
c)
The PBI is complete because all customer requests are written in it
d)
customer requirements are reflected in it
e)
We change the product backlog when we receive feedback
58.
The entire Scrum Team defines the Product Goal.
a)
true
b)
false
59.

Which statement would best describe the relationship between the Product Backlog and the changes in the marketplace the business operates in?

a)
Changes in the market place donot affect the product backlog
b)
the product backlog already has all requirements needed for the product
c)
Changes in the market place lead to changes in the product backlog
60.
A Product Owner can set (and go after) multiple Product Goals at the same time to serve as targets for the Scrum Team.
a)
true
b)
false
61.
Select the Scrum pillars.
a)
Transparency
b)
Commitment
c)
Inspection
d)
Openness
e)
Adaptation
62.
During the Sprint, what kind of tests do the Developers perform?
a)
Integration Test
b)
Load Test
c)
Smoke Test
d)
Whatever tests are necessary
63.
The Scrum Team must be cross-functional.
a)
false
b)
true
64.
A Scrum Team develops a complex app game that uses artificial intelligence. The project is complex. The members of the team decide that it would be helpful to have a specialized Quality Assurance team
a)
Yes it is allowed.It will incerase the quality of the product and minimize the risk when the scrum team release the increments
b)
No this is not allowed
65.
Which of the following are not Scrum Values? (Select All That Apply)
a)
Focus
b)
Respect
c)
Truth
d)
Commitment
e)
Openness
66.
Which sentence best describes the Scrum pillar transparency?
a)
The whole process must be visible to those responsible for the outcome
b)
Significant aspects of the process must be visible to key stakeholders
c)
The whole process must be visible to key stakeholders
d)
The emergent process and work must be visbile to those performing the work as well as those receiving the work
67.
What does the term “cross-functionality” mean?
a)
Cross-functional teams do not rely on help outside the team.They have all expertize to create a usable increment
b)
Cross-functional teams choose how to best accomplish their work
c)
Cross-functional teams consist of designers,developers,Devops speacialist and a team leader
68.
It’s not prohibited to have Team Leaders when many Scrum Teams are working on the same product.
a)
true
b)
false
69.

Three Scrum Teams are working on the same product. How many Product Backlogs should be there?

a)
As many as PO decides
b)
3
c)
1
70.
What is correct when multiple Scrum Teams are working on the same product? (Select 3)
a)
There can be multiple product backlog
b)
There is only one sprint backlog
c)
There is only one product goal
d)
There can be multiple scrum masters
e)
There can be multiple Definition of done
71.
When the project is riskier, shorter Sprints are preferred.
a)
false
b)
true
72.
What is Scrum founded on?
a)
Empiricism and Lean Thinking
b)
Empirical Critique & System Thinking
c)
Empirical Control Theory and Critical Thinking
73.
During the Sprint Review event, the Developers demonstrate only PBIs that are 100% complete
a)
false
b)
true
74.

When does the Scrum Team craft the Sprint Goal?

a)
During Release planning
b)
During sprint planning
c)
The scrum team does not craft sprint goal
d)
During sprint zero
75.
Scrum is a process that has been used to manage work on complex products since the early 1990s.
a)
false
b)
true
76.
When should the increment be released?
a)
At the end of every sprint
b)
When the increment is bug-free
c)
When the PO decides
d)
When the increment is in usable condition
e)
When the scrum team decides
77.
The Scrum Master is responsible for engaging with stakeholders.
a)
true
b)
false
78.

Having a Definition Of Ready is mandatory in Scrum.

a)
false
b)
true
79.
What would be a good way to divide 120 developers into teams?
a)
The SM decides the no of teams and assigns developers to each team
b)
The PO decides the no of teams and assigns developers to each team
c)
Let the developers get together and discuss their skills and experience and organize themselves into teams
80.
The Scrum Team must deliver an increment at the Sprint Review event.
a)
false
b)
true