wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

EAL unit 4 revision 3

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

which earthing system is not recommended for petrol stations, caravans and marina pontoons?

a)

TNS

b)

TT

c)

TNC

d)

PME

2.

What is the maximum value for Ze, for a TN-C-S system?

a)

0.8

b)

0.35

c)

20

d)

1666

3.

which earthing system, due to a high possibility of high Zs values, must have additional protection?

a)

TNS

b)

TT

c)

TNCS

d)

PME

4.

Which earthing system is frequently used in hospitals?

a)

TNS

b)

IT

c)

TNC

d)

PME

5.

Which supply system uses a PEN conductor?

a)

TT

b)

TNS

c)

IT

d)

TNCS

6.

the metalwork that does not form part of an electrical installation, but may be electrified under fault conditions, is called:

a)

extraneous conductive parts

b)

basic protection

c)

exposed conductive parts

d)

fault protection

7.

which of the following is an extraneous conductive part?

a)

the metal casing on a washing machine

b)

metal switch back plate

c)

metal casing on an electric motor

d)

metal casing on a gas pipe

8.

A current that goes beyond the rated value in an otherwise healthy circuit is one definition of:

a)

earthing

b)

bonding

c)

overload

d)

short circuit

9.

the maximum disconnection time for TT systems, above 32A is:

a)

5s

b)

1s

c)

.2s

d)

.4s

10.

A TNS earthing system operates through the:

a)

earth electrode

b)

PEN conductor

c)

supply cable armour

d)

the earth itself

11.

Which of the following symbol represents the external earth fault look impedance value?

a)

Zx

b)

Zs

c)

Ze

d)

Zt

12.

Which of the following symbols represents the total earth loop impedance value?

a)

Zx

b)

Zs

c)

Ze

d)

Zt

13.

the protection provided by equipotential bonding and automatic disconnection of supply, is called:

a)

extraneous conductive parts

b)

basic protection

c)

exposed conductive parts

d)

fault protection

14.

Equipotential bonding is carried out to:

a)

earth all equipment

b)

earth all exposed conductive parts

c)

link all extraneous conductive parts

d)

stop fuses operating

15.

Which earthing system changes L -E faults to L - N faults?

a)

TNS

b)

TT

c)

IT

d)

TNC