LEED AP BD+C_Integrative Strategies

Total questions: 52

Worksheet time: 39mins

Name
Class
Date
1.

A project team has completed preliminary energy and water research and analysis that will help with the discussions for integrative design opportunities. What should be the project team's next step?

a)

Gather occupant feedback

b)

Conduct a preliminary water budget analysis

c)

Document how the analysis informed the OPR and BOD

d)

Convene a goal setting workshop

2.

A project team has convened to identify targeted LEED credits, identify initial responsibilities and deliverables, and identify potential integrative strategies for achieving performance targets. What is their next step in the project timeline?

a)

Conduct a preliminary water budget analysis and preliminary comparative energy modeling

b)

Document the owner's project requirements and basis of design

c)

Hire a commissioning authority

d)

Collect information about the local climate and site conditions

3.

A new government office building will provide individual occupant controls for lighting. What design strategy would most reduce the operational energy use associated with task lighting?

a)

Increasing the glazing on windows

b)

Installing higher reflective surfaces

c)

Installing automatic shading devices on windows

d)

Integrating individual controls with occupancy sensors

4.

A project team for a 3-story mixed-use project wants to increase the daylighting of the store on the ground floor to help the owner better display products for sale. What factors are NOT critical for allowing more daylight into the building?

a)

Depth of floor plates

b)

Design of the exterior envelope

c)

Including skylights in the design

d)

Adjacent surfaces

5.

A project team for a school wants to increase the daylighting and views for students in classrooms. What issue should be considered if the design team chooses to increase the amount of glazing?

a)

Glazing provides less insulating effects compared to standard walls

b)

Increased glazing will decrease the opportunity for thermal comfort control

c)

A decrease in lighting control can result from increased glazing

d)

Increased glazing will impact acoustical performance

6.

A project moved beyond the design phase before a green-building consultant was asked to join the project team. The building owner wants to hear about design strategies that are flexible and can earn multiple LEED points without negatively impacting the project budget. The design consultant suggests using light-colored pervious paving with recycled content in lieu of a black asphalt parking lot. This design strategy would assist in all of the following credits EXCEPT:

a)

SS Credit Rainwater Management

b)

SS Credit Heat Island Reduction

c)

MR Credit BPDO: Sourcing of Raw Materials

d)

SS Credit Open Space

7.

During the design phase of a new commercial development the design team finds that changing the orientation of the building and adding exterior horizontal louvers above the South-facing windows will be beneficial. Which credit would NOT be affected by these changes?

a)

EA Credit Green Power and Carbon Offsets

b)

EA Credit Optimize Energy Performance

c)

EQ Credit Daylight

d)

EQ Credit Enhanced Commissioning

8.

A new library will have a 5% energy improvement over a baseline building. The project team is considering increasing ventilation. The project uses mechanical ventilation. This change could have a negative impact on:

a)

EA Credit Demand Response

b)

EA Credit Optimize Energy Performance

c)

EA Prerequisite Minimum Energy Performance

d)

EA Prerequisite Fundamental Refrigerant Management

9.

A new 10 story office building will be built in an arid region. Installing occupancy sensors would impact which credits?

a)

EA Credit Optimize Energy Performance and EQ Prerequisite Minimum IAQ Performance

b)

EQ Prerequisite Minimum IAQ Performance and EQ Credit Thermal Comfort

c)

EQ Credit Enhanced IAQ Strategies and EQ Prerequisite Minimum IAQ Performance

d)

EQ Credit Thermal Comfort and EQ Credit Enhanced IAQ Strategies

10.

The design of a new five-story school includes plans for using stone from local quarries, a rainwater harvesting system, stacking the building program, solar thermal roof panels to heat hot water, and open grid paving.What green building strategies will these design decisions contribute toward?

a)

LT Credit Sensitive Land Protection

b)

EA Credit Green Power and Carbon Offsets

c)

SS Credit Site Development-Protect or Restore Habitat

d)

MR Credit Building Life-Cycle Impact Reduction

11.

A project team is removing cisterns from a project design and will install a green roof instead. The building has a FAR of 1.7. What project area would this change impact the least?

a)

SS Credit Rainwater Management

b)

SS Credit Open Space

c)

SS Credit Heat Island Reduction

d)

EA Prerequisite, Fundamental Commissioning and Verification

12.

A building design includes such green building strategies as a vegetated roof, task lighting, photovoltaic cells, and operable windows. What credit will these design strategies NOT help achieve?

a)

EQ Credit Thermal Comfort

b)

EQ Credit Interior Lighting

c)

EA Credit Renewable Energy Production

d)

EQ Credit Daylight

13.

A project team has hired a LEED consultant to assist them with their first LEED project. What credit requires pictures as proof of compliance?

a)

LT Credit Surrounding Density and Diverse Uses

b)

LT Credit Access to Quality Transit

c)

EQ Credit Construction IAQ Management Plan

d)

SS Credit Rainwater Management

14.

To be successful with MR Prerequisite Storage and Collection of Recyclables, who should assist in providing input on space requirements and the best infrastructure required for collection?

a)

A waste hauler or recycling provider

b)

An architect

c)

A project owner

d)

Building occupants

15.

Which statement is true regarding construction checklists as part of the commissioning process?

a)

Test sampling is prohibited even if the project contains a large number of identical systems.

b)

The contractor is responsible for filling out the checklist and returning it to the CxA.

c)

The checklist confirms the contractor has completed functional testing.

d)

Testing and balancing are not included in the checklist.

16.

If a project team is pursuing both the Integrative Process credit and EA Credit Optimize Energy Performance, which action should occur first?

a)

A basic energy analysis prior to conducting the energy simulation

b)

Creation of a baseline energy model

c)

Determination the energy costs savings

d)

Use of the exceptional calculation method for unregulated loads

17.

What is the benefit of preparing a concept model for compliance with the Integrative Process credit?

a)

It can be used to verify the prescriptive requirements are met for EA Prerequisite Minimum Energy Performance

b)

It can earn a project extra points when following the prescriptive compliance path of EA Credit Optimize Energy Performance

c)

It can be used as the baseline model for a proposed design

d)

It can form the basis of the preliminary energy model for a whole-building energy simulation

18.

Integrating which project team member into MR Prerequisite Construction and Demolition Waste Management Planning early in the design phase will assist later with earning the related credit?

a)

Contractor

b)

Owner

c)

Occupants

d)

Facility Manager

19.

What rating system is required to conduct a four-hour integrated design charrette to optimize the integration of green strategies?

a)

LEED BD+C: Homes

b)

LEED BD+C: Schools

c)

LEED BD+C: Healthcare

d)

None of the rating systems

20.

A project team for a new hospital is having an integrative design charrette to discuss the budget, schedule, and functional programmatic requirements, health mission statement, credits to target and the LEED certification level. What will the project team need to document from the charrette for IP Prerequisite Integrative Project Planning and Design?

a)

Simple box energy model and how the model informed the building design and a list of potential vendors

b)

Narrative describing how the budget and schedule impacted the credits selected and who is responsible for each credit

c)

Narrative describing how the health mission statement informed the budget and schedule and performance testing criteria

d)

Narrative explaining how the health mission statement addresses the credit requirements and a plan of action

21.

Which action must a project team take for implementation of the Integrative Process credit?

a)

Perform a site assessment during the pre-design phase

b)

Conduct a minimum four-hour integrated design charrette

c)

Document how the analysis informed building and site design decisions in the project's OPR and BOD

d)

Create a simple life-cycle assessment of the design

22.

Which action would NOT earn a project an Innovation credit for a LEED BD+C: New Construction project?

a)

Using a new strategy to mitigate the heat island effect

b)

Achieving the pilot credit for ergonomics

c)

Designing a net-zero building

d)

Implementing a green cleaning policy and program

e)

Development of a public education program

23.

For which reason would it be suggested that someone review the ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities?

a)

To become familiarized with the Integrative Process

b)

To learn about smart growth and sustainable neighborhood design

c)

To review what needs to be analyzed for a site assessment

d)

To review national green building codes

24.

In the integrative process, which statement is true about how the energy and water systems should be analyzed to identify the most synergies?

a)

The water systems should be analyzed first.

b)

The energy systems should be analyzed first.

c)

The energy and water systems should be analyzed at the same time.

d)

The order in which systems are analyzed does not matter.

25.

Which tool will assist the project team when conducting a preliminary energy research and analysis for Integrative Process credit?

a)

LEED Online

b)

USGBC energy calculator

c)

ASHRAE 90.1 user's manual

d)

EPA Target Finder

26.

Energy-related research for the Integrative Process credit should include all EXCEPT which element?

a)

Local climate

b)

Site conditions

c)

Proximity to public transportation

d)

Potential building features

27.

A building owner and primary project team have convened for a goal-setting workshop. Which factors are examples of what would NOT be determined in the workshop?

a)

The project must be completed in 24 months.

b)

The budget is $35M.

c)

The energy performance should be 25% better than similar buildings

d)

The lighting needs of certain workspaces.

28.

In a goal-setting workshop, which information should be documented for IP Credit Integrative Process?

a)

Owner's project requirements (OPR) and basis of design (BOD)

b)

Current facility requirements (CFR) and Cx plan

c)

Construction documents and daylighting analysis

d)

LEED credit submittals and financial incentive appl

29.

Which factors should be modeled in a preliminary energy analysis?

a)

All systems that consume energy in a building

b)

Only options that have large consequences on energy use

c)

Only non-process loads

d)

Indoor water-use demand

30.

A LEED AP is exploring possible strategies for a building's energy related systems. Which aspects must be evaluated for a simple box energy model to earn Integrative Process credit?

a)

Lighting levels, indoor water-use demand, and proximity to public transportation

b)

Thermal comfort ranges, plug and process loads, and off-site parking

c)

Site conditions, massing and orientation, building envelope attributes

d)

Building envelope attributes, programmatic and operational parameters, and acoustics

31.

An owner, architect, and general contractor in a goal-setting workshop for a school project are discussing how installing a large quantity of skylights in the building's roof would increase daylighting in the core of the building. What could help them with this decision and help with earning IP Credit Integrative Process?

a)

Perform a preliminary simple box energy model

b)

Hire a lighting designer

c)

Conducting a student survey of lighting conditions at nearby schools

d)

Comparing the design to schools with similar plug and process load needs

32.

Identifying at least one on-site, non-potable water source that could be used to offset water demand is required for which credit?

a)

WE Prerequisite Indoor Water-Use Reduction

b)

We Credit Indoor Water-Use Reduction

c)

WE Prerequisite Outdoor Water-Use Reduction

d)

Integrative Process

33.

A project team has discovered local code allows the collection of rainwater for irrigation use and offsetting potable water use to reduce indoor water demand and process water demand. If the project wants to earn Integrative Process credit, rainwater must be incorporated into how many water demand components (indoor, outdoor, process)?

a)

None

b)

1

c)

2

d)

3

34.

Which action does a project team need to take in the discovery phase for water-related systems to earn IP Credit Integrative Process?

a)

Identify at least one on-site, non-potable water source that could supply a portion of at least two demand components

b)

Show how the indoor water demand will be reduced by 30%

c)

Select manufacturers of WaterSense fixtures

d)

Identify initial responsibilities and deliverables for each team member

35.

In an initial goal-setting workshop, which actions would occur?

a)

Creating a map outlining walking paths to diverse uses, selecting a vendor to purchase RECs from, reviewing power requirements of different energy consuming systems

b)

Collection of information about local climates, reviewing EPDs of materials, life cycle analysis of the building design

c)

Hearing from all community representatives, clarifying functional and programmatic goals, building operations training

d)

Engagement of the owner and primary project team, setting a target certification level, picking LEED credits and assigning responsibilities

36.

Which options would be considered when evaluating building envelope performance as part of a simple box energy analysis?

a)

Temperature set-points

b)

Effects of the percentage of exterior glazing on energy loads

c)

Landscape conditions

d)

Hours of occupancy

37.

A project team is reviewing a simple box energy model for a large commercial building dominated by external loads. Which strategy can help decrease envelope loads?

a)

Increasing the insulating value of the glazing and window frame system

b)

Decreasing lighting power

c)

Reducing plug loads

d)

Demanding controlled ventilation

38.

A hospital project's preliminary energy model reveals high internal loads. Which suggestion would reduce energy use?

a)

Provide daylighting

b)

Oversize the HVAC system

c)

Fully glaze the western facade

d)

Change the building footprint

39.

Which outcome exemplify collaboration among team members? 

a)

The HVAC system contributes to MR Credit Building product disclosure and optimization - environmental product declarations

b)

Rainwater collection can be used for both SS Credit Rainwater Management and WE Credit Outdoor Water-Use Reduction.

c)

A density allowance is available for building green.

d)

A manufacturer is developing an HPD for a product.

40.

At which phase would a daylight consultant play a critical role?

a)

When any information needs to be identified for a daylight simulation

b)

During pre-design, to understand lighting and daylighting goals

c)

When the daylighting performance criteria need to be specified in the owner's project requirements

d)

When regularly occupied spaces are designed in the floor plan

41.

The coordination of energy and water systems for the Integrative Process credit should be addressed before which phase?

a)

Conceptual design

b)

Design development

c)

Schematic design

d)

Evaluation

42.

Which documentation do project teams need to submit for Integrative Process credit?

a)

A site assessment

b)

A water budget analysis

c)

A simple box energy modeling analysis

d)

An integrative process worksheet

43.

Which of the following is the beginning phase of the integrative process?

a)

Discovery

b)

Design and Construction (Implementation)

c)

Occupancy, Operations, and Performance Feedback

d)

Financing

44.

A team in a goal setting-workshop has selected to pursue LEED Gold, identified credits to pursue and assigned responsible parties to each credit and prerequisite. After evaluating possible energy strategies what does the team need to document for IP Credit Integrative Process?

a)

How the analysis informed the design decisions in the OPR and BOD

b)

The aggregate costs of the meetings

c)

The credit calculations for each credit

d)

The preliminary project schedule

45.

For Integrative Process credit which factors must project teams assess through simple box energy modeling before completion of schematic design?

a)

At least one load reduction strategy and one energy efficiency strategy

b)

At least one source of renewable energy

c)

At least one way to increase efficiency

d)

At least two potential load reduction strategies

46.

Which factor is aided by establishing regular meeting dates and clear communication channels? 

a)

Discovery

b)

Establishing project goals

c)

Resolving issues quickly

d)

Defining the LEED project scope

47.

Achieving the greatest effectiveness in cost and environmental performance requires that every issue and every team member be brought into the project at which of the following points?

a)

Design and construction

b)

Discovery

c)

Preliminary LEED review

d)

Occupancy, operations, and performance feedback

48.

Which situation might be a result of addressing the surrounding density and diverse uses early in the integrative process? 

a)

More reliance on automobiles

b)

Increased availability of uses within walking distance

c)

Decreased construction time

d)

Decreased water usage

49.

Which water-budget information provides enough data for use in the Discovery phase of water-related systems?

a)

A week's worth of data showing that 5,000 gallons (18,900 liters) of water will be used

b)

Data revealing that the building's indoor fixtures will use 10,000 gallons of water (37,854 liters)

c)

Data indicating that makeup water will be negligible

d)

Data concluding that a rainwater collection system will supply 20,000 gallons (75,708 liters) of water per year

50.

Which statement is true regarding a project team's ability to use the water budget from a school project and apply it to an office project?

a)

The application of the school project's water budget will apply to the office project if both projects use the same plumbing contractors.

b)

The application of the school project's water budget will apply to the office project if both projects have the same type and number of indoor fixtures.

c)

The application of the school project's water budget will apply to the office project if both projects have the same gross floor area.

d)

The application of the school project's water budget will not apply to the office project because water budgets are project-specific.

51.

Which factor is included in the analysis of a project's water budget? 

a)

The water required only by the building

b)

The water required only by the associated grounds

c)

The water required by both the building and the associated grounds

d)

Submeters used for measuring performance

52.

Which project team members' presence on a project would help meet the requirements of multiple credits for a prospective LEED BD+C: Data Center?

a)

LEED AP BD+C and LEED AP O+M

b)

LEED AP BD+C and a qualified CxA

c)

Two team members that are LEED AP BD+C

d)

LEED AP without specialty and daylighting modeler