WorksheetsPROF PRAC: SITUATIONAL
Total questions: 50
Worksheet time: 26mins
It is the act of planning and architectural designing; The scientific, aesthetic and orderly coordination of all the processes which enter into the production of a complete building or structure.
General Practice of Architecture
Architecture
Professional Practice of Architecture
Standard Practice of Architecture
An architect registered and licensed or permitted to practice under RA 9266 who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.
Architect in-Charge-of-Construction
Consulting Architect
Architect-of-Record
Architect
It is defined as the 'duly notarized or written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services to be rendered by an Architect registered and licensed under RA 9266.'
Service Agreement
Scope of Works
Manual of Procedure
Method of Compensation
A sole proprietorship, a partnership or a corporation registered with DTI and/or SEC and then with the Board of Architecture and the PRC.
Architectural Company
Architectural Firm
Architectural Corporation
Architectural Partnership
A juridicial entity that shall be synonymous with an Architectural Partnership
Architectural Company
Architectural Firm
Architectural Partnership
Architectural Corporation
Composition requirement for Architectural Corporation
70%
75%
60%
85%
Two or more Architects duly registered with SEC and Board of Architecture
Architectural Corporation
Architectural Partnership
Architectural Company
Architectural Firm
UAP Document 200
Architects' Guidelines
Code of Ethical Conduct
Standards of Professional Practice
General Conditions
UAP Document 210
Architects' Guidelines
Standards of Professional Practice
Code of Ethics
General Conditions
Contract Documents are the documents attached to the agreement, including all additions, deletions and modifications incorporated therein. Which of these are included?
Special Provisions/Conditions
General Conditions
Drawings
Specifications
Bid Documents
Detailed physical planning of land or property on which vertical structures such as buildings, monuments and/or structures and horizontal developments such as rrow, open spaces and recreational related facilities are to be proposed.
Physical Planning
Site Planning
Urban Design
Comprehensive Development Plan
Detailed site development planning of all areas surrounding a building/structure and/or a group of buildings but only within the property limits of the land on which such structures are to be erected.
Physical Planning
Site Planning
Urban Planning
Site Development Planning
Physical and Systematic design undertaken by an Architect on a community and urban plane
Urban Planning
Urban Design
Urban Site Development
Community Planning
RULE I OF RA 9266
PRBOA
TITLE
EXAMINATION
PRACTICE OF ARCHITECTURE
Chairman term of the Board term of office after appointment
1 year
2 years
3 years
5 years
Is CPD required?
Yes.
No.
Maybe.
call a friend
They prescribe and adopt the IRR of the Architecture Act of 2004 for carrying out the provisions for RA 9266.
PRC
PRBOA
PCAB
UAP
A writ ordering a person to attend court hearing and testify.
Subpoena ad Testificandum
Subpoena duces tecum
A writ ordering a person to attend court and bring relevant documents.
Subpoena ad testificandum
Subpoena duces tecum
Situation: You just passed the recent Licensure examination for Architects and, what do you do next?
Put up your own firm
Get ready for Oath taking
Look for greener pasture
Go back to your old job and make it better
What is not mentioned in the Architect's Credo?
Clients
Colleagues
Industry Partners
Government
After paying the fee for the renewal of your license, how long before you can get the PRC ID?
1 day
7 working days
2 weeks
one month
After passing the licensure exam, you decided to marry your boyfriend. Since you wanted to update your professional records at PRC, you applied/submitted a Petition for Change of Registered Name due to Marriage and/or Petition for Correction of Entries or data. What is the maximum processing time for PRC, from receipt of complete documents, to act on your petition?
one month
two months
7 working days
2 weeks
Situation: During the summer holidays, a couple decided to have their house repaired. They acquired the services of Architect 'A' to give the Roofing Repairs to their father, who happens to be a roofing contractor. Everything went well until the rains came. Now, the house is flooding and leaks coming everywhere. They asked Architect 'A' to make good the defects but the architect refused. Who is liable for the damage?
Architect A, since he should have checked the work of the roofing contractor.
The roofing contractor, he was the one who repaired the roof.
The couple, they were the ones that asked that their father do the repairs.
How do you pay a Painting subcontractor?
Per Hour
Per Day
Per Square Meter
Lump Sum
How do you compensate a 'Project-Hired' Painter?
Per Hour
Per Day
Per Square Meter
Lump Sum
Due to the flooding and leaks, the whole house had to be rewired. After a successful mediation, Architect 'A' continued with the project. How are the electricians paid?
Lump sum
Per outlet, switches and complexity
Ask the contractor
Based on Material Cos
In a medium sized construction, who plans the time schedule?
Owner
Supervisor
Construction Manager
Architect
Whose responsibility is it to obtain a Certificate of Occupancy upon completion of the project?
Architect
Contractor
Owner
Construction Manager
Who is responsible in asking for a Final Inspection of a project?
Architect
Owner
Contractor
Sub Contractor
Who is responsible for carrying out the Architectural Design Plans and Details in the actual construction?
Project Architect
Project Engineer
Project Manager
Owner
Who is the professional responsible for the design and overall appearance of the project proposal?
Project Manager
Project Engineer
Owner
RLA
Which is not a duty of a Construction Manager?
Project Coordination and Supervision
Cost and Time control
Keeping of Records
Preparation of As-Built Plans
Architects in business is usually involved in
Design-Build
Teaching
Real Estate Development
Design Consultancy
Who can change the members of the IAPOA?
PRC Chairman
President of the Philippines
IAPOA
Secretary of the Board
What law covers the Intellectual property rights?
RA 9285
RA 8293
RA 9003
PD 8395
Under Sec. 22 of RA 9266, the board may refuse to issue a Certificate of Registration and Professional Identification Card to a person:
Who has paid money to secure a Certificate of Registration
Who is of unsound mind
Who has falsely impersonated a practitioner or a former practitioner
Who has undertaken architectural service without a valid service agreement.
The COFILCO is an umbrella-organization of consultants accredited by the Government Procurement Policy Board (GPBB) in a non-exclusive manner for the following types of professions and/or services: architecture, environmental planning/investigation/consulting, engineering (civil/structural, geodetic, electrical, mechanical, sanitary, electronics and communications), master plumbing, landscape architecture, interior design, accounting, project/construction management, management consulting and real estate housing.
Council of Filipino Consulting Organization
Chinese Federation of Consulting Organization
Congregation of Filipino Consulting Organizations
Confederation of Filipino Consulting Organizations
After securing your company's Articles of Incorporation and By-Law, where should you register before starting to operate your business?
PRBOA
PRC
DTI and SEC
Local Government
For an Architectural Partnership, which agency should they register with?
DTI
SEC
Both
NOTA
If an Architect wants to register a 'single proprietorship' firm, where will he register?
UAP
PRC
DTI
SEC
What should be secured first before applying for a Business Permit?
City Hall
SEC
DTI
BIR
As per RA 9266, how many sets of Plans and Technical Specifications should an architect provide for the Owner for purposes of obtaining a Building Permit?
5
6
7
8
When was RA 9266 signed into law?
September 15, 2004
January 29, 2004
March 17, 2004
July 28, 2004
When was the IRR of RA 9266 approved?
September 15, 2004
January 29, 2004
March 17, 2004
July 28, 2004
Who is responsible for the implementation of RA 9266
PRBOA
OBO
DPWH
Commission and the Bpard
Who is responsible for the administration of the provisions of the Building Code in the field as well as the enforcement of orders and decisions made pursuant thereto?
DPWH Secretary
Building Official
Municipal Engeineer/ Architect
PRBOA
Which of the following is not a qualification of a Building Official?
Duly registered Architect or Civil Engineer
A member of good standing of a duly accredited organization of his profession for not less than two years.
Has a master's degree in building design and construction
A Filipino Citizen and of Good Moral Character
Who or whaT body is responsible for Zoning exemption, reclassification, or change of zone ordinance?
Mayor
Governor
CIty Council
HLURB
As per Supplemental IRR of RA 9266, SPP, what is the basis of the preparation of Contract Documents wherein the Architect prepares the detailed designs, Construction Drawings and Technical Specs in 7 sets?
Approved Schematics and Conceptual Plans
Architectural Program
Approved Design Development Documents
Feasibility Studies