PROF PRAC: SITUATIONAL

Total questions: 50

Worksheet time: 26mins

Name
Class
Date
1.

It is the act of planning and architectural designing; The scientific, aesthetic and orderly coordination of all the processes which enter into the production of a complete building or structure.

a)

General Practice of Architecture

b)

Architecture

c)

Professional Practice of Architecture

d)

Standard Practice of Architecture

2.

An architect registered and licensed or permitted to practice under RA 9266 who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect in-Charge-of-Construction

b)

Consulting Architect

c)

Architect-of-Record

d)

Architect

3.

It is defined as the 'duly notarized or written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services to be rendered by an Architect registered and licensed under RA 9266.'

a)

Service Agreement

b)

Scope of Works

c)

Manual of Procedure

d)

Method of Compensation

4.

A sole proprietorship, a partnership or a corporation registered with DTI and/or SEC and then with the Board of Architecture and the PRC.

a)

Architectural Company

b)

Architectural Firm

c)

Architectural Corporation

d)

Architectural Partnership

5.

A juridicial entity that shall be synonymous with an Architectural Partnership

a)

Architectural Company

b)

Architectural Firm

c)

Architectural Partnership

d)

Architectural Corporation

6.

Composition requirement for Architectural Corporation

a)

70%

b)

75%

c)

60%

d)

85%

7.

Two or more Architects duly registered with SEC and Board of Architecture

a)

Architectural Corporation

b)

Architectural Partnership

c)

Architectural Company

d)

Architectural Firm

8.

UAP Document 200

a)

Architects' Guidelines

b)

Code of Ethical Conduct

c)

Standards of Professional Practice

d)

General Conditions

9.

UAP Document 210

a)

Architects' Guidelines

b)

Standards of Professional Practice

c)

Code of Ethics

d)

General Conditions

10.

Contract Documents are the documents attached to the agreement, including all additions, deletions and modifications incorporated therein. Which of these are included?

a)

Special Provisions/Conditions

b)

General Conditions

c)

Drawings

d)

Specifications

e)

Bid Documents

11.

Detailed physical planning of land or property on which vertical structures such as buildings, monuments and/or structures and horizontal developments such as rrow, open spaces and recreational related facilities are to be proposed.

a)

Physical Planning

b)

Site Planning

c)

Urban Design

d)

Comprehensive Development Plan

12.

Detailed site development planning of all areas surrounding a building/structure and/or a group of buildings but only within the property limits of the land on which such structures are to be erected.

a)

Physical Planning

b)

Site Planning

c)

Urban Planning

d)

Site Development Planning

13.

Physical and Systematic design undertaken by an Architect on a community and urban plane

a)

Urban Planning

b)

Urban Design

c)

Urban Site Development

d)

Community Planning

14.

RULE I OF RA 9266

a)

PRBOA

b)

TITLE

c)

EXAMINATION

d)

PRACTICE OF ARCHITECTURE

15.

Chairman term of the Board term of office after appointment

a)

1 year

b)

2 years

c)

3 years

d)

5 years

16.

Is CPD required?

a)

Yes.

b)

No.

c)

Maybe.

d)

call a friend

17.

They prescribe and adopt the IRR of the Architecture Act of 2004 for carrying out the provisions for RA 9266.

a)

PRC

b)

PRBOA

c)

PCAB

d)

UAP

18.

A writ ordering a person to attend court hearing and testify.

a)

Subpoena ad Testificandum

b)

Subpoena duces tecum

19.

A writ ordering a person to attend court and bring relevant documents.

a)

Subpoena ad testificandum

b)

Subpoena duces tecum

20.

Situation: You just passed the recent Licensure examination for Architects and, what do you do next?

a)

Put up your own firm

b)

Get ready for Oath taking

c)

Look for greener pasture

d)

Go back to your old job and make it better

21.

What is not mentioned in the Architect's Credo?

a)

Clients

b)

Colleagues

c)

Industry Partners

d)

Government

22.

After paying the fee for the renewal of your license, how long before you can get the PRC ID?

a)

1 day

b)

7 working days

c)

2 weeks

d)

one month

23.

After passing the licensure exam, you decided to marry your boyfriend. Since you wanted to update your professional records at PRC, you applied/submitted a Petition for Change of Registered Name due to Marriage and/or Petition for Correction of Entries or data. What is the maximum processing time for PRC, from receipt of complete documents, to act on your petition?

a)

one month

b)

two months

c)

7 working days

d)

2 weeks

24.

Situation: During the summer holidays, a couple decided to have their house repaired. They acquired the services of Architect 'A' to give the Roofing Repairs to their father, who happens to be a roofing contractor. Everything went well until the rains came. Now, the house is flooding and leaks coming everywhere. They asked Architect 'A' to make good the defects but the architect refused. Who is liable for the damage?

a)

Architect A, since he should have checked the work of the roofing contractor.

b)

The roofing contractor, he was the one who repaired the roof.

c)

The couple, they were the ones that asked that their father do the repairs.

25.

How do you pay a Painting subcontractor?

a)

Per Hour

b)

Per Day

c)

Per Square Meter

d)

Lump Sum

26.

How do you compensate a 'Project-Hired' Painter?

a)

Per Hour

b)

Per Day

c)

Per Square Meter

d)

Lump Sum

27.

Due to the flooding and leaks, the whole house had to be rewired. After a successful mediation, Architect 'A' continued with the project. How are the electricians paid?

a)

Lump sum

b)

Per outlet, switches and complexity

c)

Ask the contractor

d)

Based on Material Cos

28.

In a medium sized construction, who plans the time schedule?

a)

Owner

b)

Supervisor

c)

Construction Manager

d)

Architect

29.

Whose responsibility is it to obtain a Certificate of Occupancy upon completion of the project?

a)

Architect

b)

Contractor

c)

Owner

d)

Construction Manager

30.

Who is responsible in asking for a Final Inspection of a project?

a)

Architect

b)

Owner

c)

Contractor

d)

Sub Contractor

31.

Who is responsible for carrying out the Architectural Design Plans and Details in the actual construction?

a)

Project Architect

b)

Project Engineer

c)

Project Manager

d)

Owner

32.

Who is the professional responsible for the design and overall appearance of the project proposal?

a)

Project Manager

b)

Project Engineer

c)

Owner

d)

RLA

33.

Which is not a duty of a Construction Manager?

a)

Project Coordination and Supervision

b)

Cost and Time control

c)

Keeping of Records

d)

Preparation of As-Built Plans

34.

Architects in business is usually involved in

a)

Design-Build

b)

Teaching

c)

Real Estate Development

d)

Design Consultancy

35.

Who can change the members of the IAPOA?

a)

PRC Chairman

b)

President of the Philippines

c)

IAPOA

d)

Secretary of the Board

36.

What law covers the Intellectual property rights?

a)

RA 9285

b)

RA 8293

c)

RA 9003

d)

PD 8395

37.

Under Sec. 22 of RA 9266, the board may refuse to issue a Certificate of Registration and Professional Identification Card to a person:

a)

Who has paid money to secure a Certificate of Registration

b)

Who is of unsound mind

c)

Who has falsely impersonated a practitioner or a former practitioner

d)

Who has undertaken architectural service without a valid service agreement.

38.

The COFILCO is an umbrella-organization of consultants accredited by the Government Procurement Policy Board (GPBB) in a non-exclusive manner for the following types of professions and/or services: architecture, environmental planning/investigation/consulting, engineering (civil/structural, geodetic, electrical, mechanical, sanitary, electronics and communications), master plumbing, landscape architecture, interior design, accounting, project/construction management, management consulting and real estate housing.

a)

Council of Filipino Consulting Organization

b)

Chinese Federation of Consulting Organization

c)

Congregation of Filipino Consulting Organizations

d)

Confederation of Filipino Consulting Organizations

39.

After securing your company's Articles of Incorporation and By-Law, where should you register before starting to operate your business?

a)

PRBOA

b)

PRC

c)

DTI and SEC

d)

Local Government

40.

For an Architectural Partnership, which agency should they register with?

a)

DTI

b)

SEC

c)

Both

d)

NOTA

41.

If an Architect wants to register a 'single proprietorship' firm, where will he register?

a)

UAP

b)

PRC

c)

DTI

d)

SEC

42.

What should be secured first before applying for a Business Permit?

a)

City Hall

b)

SEC

c)

DTI

d)

BIR

43.

As per RA 9266, how many sets of Plans and Technical Specifications should an architect provide for the Owner for purposes of obtaining a Building Permit?

a)

5

b)

6

c)

7

d)

8

44.

When was RA 9266 signed into law?

a)

September 15, 2004

b)

January 29, 2004

c)

March 17, 2004

d)

July 28, 2004

45.

When was the IRR of RA 9266 approved?

a)

September 15, 2004

b)

January 29, 2004

c)

March 17, 2004

d)

July 28, 2004

46.

Who is responsible for the implementation of RA 9266

a)

PRBOA

b)

OBO

c)

DPWH

d)

Commission and the Bpard

47.

Who is responsible for the administration of the provisions of the Building Code in the field as well as the enforcement of orders and decisions made pursuant thereto?

a)

DPWH Secretary

b)

Building Official

c)

Municipal Engeineer/ Architect

d)

PRBOA

48.

Which of the following is not a qualification of a Building Official?

a)

Duly registered Architect or Civil Engineer

b)

A member of good standing of a duly accredited organization of his profession for not less than two years.

c)

Has a master's degree in building design and construction

d)

A Filipino Citizen and of Good Moral Character

49.

Who or whaT body is responsible for Zoning exemption, reclassification, or change of zone ordinance?

a)

Mayor

b)

Governor

c)

CIty Council

d)

HLURB

50.

As per Supplemental IRR of RA 9266, SPP, what is the basis of the preparation of Contract Documents wherein the Architect prepares the detailed designs, Construction Drawings and Technical Specs in 7 sets?

a)

Approved Schematics and Conceptual Plans

b)

Architectural Program

c)

Approved Design Development Documents

d)

Feasibility Studies