wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

W11 Pop Quiz

Total questions: 10

Worksheet time: 40mins

Name
Class
Date
1.

Identify the length of trench excavation for Ground Beam on Gridline B/1-2

a)

3.60 M

b)

4.20 M

c)

2.55 M

d)

2.90 M

2.

Identify the volume of trench excavation for Ground Beam on Gridline 2-3/A, given the width is 450mm, thickness 850mm and 50mm lean concrete.

a)

1.17 M3

b)

1.38 M3

c)

1.17 M

d)

1.38 M3

3.

Identify the volume of curved trench excavation, given the lean concrete is 100mm.

a)

2.77 M3

b)

6.28 M3

c)

0.69 M3

d)

0.57 M3

4.

Identify the volume of trench excavation for Ground Beam, given the lean concrete is 50mm and there are a total of 5 similar Ground Beams in the drawing.

a)

0.13 M3

b)

0.42 M3

c)

0.36 M3

d)

0.09 M3

5.

How many item(s) of taking off to be prepared for the pits excavation works?

a)

7 items

b)

1 item

c)

2 items

d)

8 items

6.

How many item(s) of taking off to be prepared for the pit's excavation works?

a)

1 item

b)

2 items

c)

6 items

d)

18 items

7.

What is the Unit of Measurement (UOM) for an item measured as an Extra Over for breaking up concrete in the trench excavation works for Ground Beam as depicted in the figure?

a)

M

b)

M2

c)

M3

d)

NO

8.

Measure the quantity for an Extra Over for breaking up concrete in the trench excavation works for Ground Beam with the correct Unit of Measurement (UOM)?

a)

35.70 M3

b)

23.10 M3

c)

1.26 M3

d)

12.60 M3

9.

How many item(s) of taking off to be prepared for these curved trench excavation works?

a)

1 item

b)

2 items

c)

3 items

d)

6 items

10.

What is the Unit of Measurement (UOM) for an excavation work to reduce the level of hill side area for the purpose of road construction?

a)

M2

b)

M3

c)

M2 stating thickness

d)

M3 stating thickness