wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

UNIT 5 - POM

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Total Quality Management Focuses on

a)

Employee

b)

Customer

c)

Both (a) & (b)

d)

None of the Above

2.

While setting Quality objective, ________ to be considered.

a)

Customer need

b)

Organizational need

c)

Supplier need

d)

Worker need

3.

What is ISO?

a)

Indian organization for standard

b)

Internal organization for standard

c)

International organization for standard

d)

None of the above

4.

Current quality concept is

(i)Increase in production

(ii)Continual improvement

(iii)Prevention of defect

The Correct Answer is

a)

i & ii

b)

i & iii

c)

ii & iii

d)

None of the above

5.

Employee should be involved in

(i)Decision making

(ii)Participation

(iii)Union

The Correct Answer is

a)

i & ii

b)

i & iii

c)

i, ii & iii

d)

None of the above

6.
Which of the following best describes quality?
a)
The service provided to a customer before, during and after purchasing.
b)
Products being made to a high standard to meet customer needs.
c)
A high level of productivity.
7.

A business checks products after they are made. What is this an example of?

a)

Quality Control

b)

Quality Circles

c)

Quality Assurance

8.

When products are checked throughout the production process this is called

a)

Quality Circles

b)

Quality Assurance

c)

Quality Control

9.

When products are checked at the end of the production process this is called

a)

Quality Assurance

b)

Quality Circles

c)

Quality Control

10.

Total Quality Management involves

a)

Management

b)

management, workforce, suppliers, and even customers, in order to meet or exceed customer expectations.

c)

management and customers, in order to meet or exceed customer expectations.

11.

Quality Circles are...

a)

are medium groups of workers, usually between 10 and 15, who

are paid to meet in order to discuss methods of improving productivity

b)

are small groups of workers, usually between 5 and 10, who are paid to meet in order to discuss methods of improving productivity

c)

are small groups of workers, usually between 5 and 10, who

meet voluntarily in order to discuss methods of improving productivity

12.

Developed by Walter Shewhart, one of the pioneers of total quality management, is a circular model known as ________ as his version of continuous improvement.

a)

Six Sigma

b)

Employee Empowerment

c)

Plan-Do-Check-Act

d)

Benchmarking

13.

It involves selecting a demonstrated standard of products, services, costs, or practices that represent the very best performance for processes or activities very similar to your own.

a)

Six Sigma

b)

PDCA

c)

Employee Empowerment

d)

Benchmarking

14.

Which car manufacturer pioneered JIT and Kaizen?

a)

Toyota

b)

Ford

c)

VW

d)

Nissan

15.

JIT means

a)

Just in time

b)

Just in case

c)

Joined instruction time

d)

Join in case

16.

The Japanese Engineer ,Who developed lean /kaizen procedures was

a)

Taiichi Ohno

b)

Elton Mayo

c)

Henry Fayol

d)

Henry Gantt

17.

JIT/Lean is a management philosophy that seeks to

eliminate...?

a)

all forms of waste

b)

inefficiency

18.

As a production system, JIT/Lean produces only...?

a)

what is

needed, when it is needed, in the quantity needed.

b)

if there is a quotation of customer.

19.

JIT/Lean began as a means of reducing

wastes. Among wastes are?

a)

Over producing

b)

Waiting time

c)

Having unnecessary stock

d)

All of them

20.

Kanban is translated as billboard or signboard, it aims to help you

visualize your work, maximize efficiency, and improve

continuously.

a)

FALSE

b)

TRUE

21.

How does Kaizen work? (more than one answer is possible)

a)

Ideas come from employees

b)

encourages employees to take ownership for their work

c)

a culture where all employees should continually look for ways to improve their performance

d)

non of them

22.

The upper control limit defines:

a)

The highest standard deviation of the process

b)

The highest variance of the process

c)

The highest level that the process should operate within

d)

The highest specification limit that the customer wants

23.
An advantage of using inspection in quality control is that
a)
Inspectors know what to look for
b)
Costs are increased because there is more waste
c)
It can prevent defective product from reaching customers
d)
It assures the reliability of the production process
24.

_________________ is a materials planning tool that relies on data from the past and present and analysis of trends to attempt to determine future events.

a)

Inventory

b)

Forecasting

c)

Production Plans

25.

Total quality management is a commitment to excellence that emphasises continuous improvement in all aspects of a business’s operation by sharing responsibility among all the members of the business. True or False?

a)

False

b)

True