wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Professional Practice [Quiz No. 2]

Total questions: 30

Worksheet time: 24mins

Name
Class
Date
1.

The Code of Ethical Conduct is an integral part of what?

a)

UAP Documents on Services of the Architect

b)

Civil Code of the Philippines

c)

Architect's National Code

d)

National Building Code

2.

SPP means?

(a)  

3.

Aside from the people and country, who does the architect give supreme oath to?

a)

God

b)

Client

c)

Colleagues

d)

Taemin

4.

What type of business can Architects best engaged in?

a)

Real Estate Development

b)

Mining Development

c)

Money Market

d)

Overseas Labor Agent

5.

Allan, a 5th year architecture student is commissioned by Mr. and Mrs. ABC to design a house. Allan has the plans signed by his professor, Architect Kimmy.

Who is unethical?

a)

Mr. and Mrs. ABC

b)

Allan

c)

Allan and Architect Kimmy

d)

All of them

6.

Allan, a 5th year architecture student is commissioned by Mr. and Mrs. ABC to design a house. Allan has the plans signed by his professor, Architect Kimmy.

Who can be reprimanded by the PRC?

a)

Architect Kimmy

b)

Allan and Mr. & Mrs. ABC

c)

Allan and Ar. Kimmy

d)

All of them

7.

Allan, a 5th year architecture student was asked and contracted by his aunt to design a 2-storey residence for her. After preparing all the Architectural Plans, he asked his professor to sign and seal it. The professor agrees to do it for a sum of Php 6,000.00.

Is there anything wrong with this practice? If yes, who is liable? What is the case if ever?

a)

Nothing is wrong since everybody involved mutually agreed on it

b)

Yes, estafa for Allan who was contracted by his aunt

c)

Yes, violation of intellectual property rights on the part of the professor

d)

Yes, violation of the code of ethics by the professor

8.

When can an architect perform his own design?

a)

As a Contractor

b)

As a Construction Manager

c)

Under full-time construction supervision

d)

Under design-built services

9.

What is the foremost role of an architect with regards to his Client?

a)

Adviser

b)

Deign Manager

c)

Design Consultant

d)

Employee

10.

What is the role of the architect between the client and contractor?

a)

Mediator

b)

To execute judicial orders with impartiality

c)

Consultant

d)

Adviser

11.

A Client wants you to be his Architect but you found out there is another architect involved. What will you do?

a)

Proceed with the Project

b)

Decline the Project

c)

Complain to the PRC

d)

Clarify with the Client

12.

When is the time when the owner can get replacement for his archietct?

a)

Immediately without notifying the first architect

b)

Immediately after terminating the services of the first architect

c)

Within 15 days after terminating the services of the first architect

d)

After terminating the services of the first architect and paying all obligations

13.

A Client wants your design to be the same with another Architect. What should you do?

a)

Use the same design

b)

Forego with the project

c)

Do a different design

d)

Adapt only the design concept

14.

A newspaper editor approaches an architect for an interview.

Is it okay to ask to be paid for the interview?

(a)  

15.

A newspaper editor approaches an architect for an interview.

Is it okay to endorse a product?

(a)  

16.

What shall the architect not ask from sources such as material suppliers given the fact that he already receives a professional fee from the client?

(a)  

17.

How much will an Architect pay if he/she violates the Code of Ethical Conduct?

a)

Php 100,000.00

b)

Php 150,000.00

c)

Php 5,000,000.00

d)

Php 200,000.00

18.

Ar. Kimmy explains his methodology to the selection committee regarding how he would translate the plan/design requirements of the proposed store renovation of CMG store in Rockwell.

Under what stage in the comparative selection process is this?

a)

Interview

b)

Evaluation and Ranking

c)

Negotiation

d)

Verification

19.

In what phase of the architectural design services does the feasibility study is conducted?

a)

Pre-Design Services

b)

Regular Design Services

c)

Specialized Architectural Services

d)

Comprehensive Architectural Services

20.

In what type of services do making of brochures/leaflets/fliers/posters and promotional & advertisement campaign are included?

a)

Pre-Design Services

b)

Regular Design Services

c)

Specialized Architectural Services

d)

Comprehensive Architectural Services

21.

What Architectural Service/Phase is the part where the Architect and Client choose the Contractor?

a)

Contract Document Phase

b)

Evaluation Phase

c)

Construction Phase

d)

Bidding Phase

22.

Preparation of working drawings, specifications and other documents and submission to clients, what stage is this?

a)

Contract Document Phase

b)

Evaluation Phase

c)

Construction Phase

d)

Bidding Phase

23.

At what stage are specifications done?

a)

Contract Document Phase

b)

Specification Phase

c)

Construction Phase

d)

Design Development Phase

24.

Stage where Architect makes decisions on all claims of the Owner and Contractors on all matters relating to the execution and progress or the interpretation of the Contract Documents?

a)

Contract Document Phase

b)

Specification Phase

c)

Construction Phase

d)

Design Development Phase

25.

Under what type of service is "sound insulation treatment"?

a)

Pre-Design Services

b)

Regular Design Services

c)

Specialized Architectural Services

26.

Where does physical planning services fall?

a)

Pre-Design Services

b)

Regular Design Services

c)

Specialized Architectural Services

d)

Comprehensive Architectural Services

27.

For specialized architectural services, what is the activity of total planning that encompasses social, physical and environmental factors?

a)

Physical Planning

b)

Comprehensive Developmental Planning

c)

Environmental Planning

d)

Comprehensive Architectural Services

28.

For specialized architectural services, what is the aesthetic designing of the space of a structure?

a)

Site Development Planning

b)

Architectural Interiors

c)

Space Planning Services

d)

Architectural Programming Services

29.

What is considered NOT part of Specialized Architectural Services?

a)

Equipment Evaluation

b)

Forensic Architecture

c)

Value Management

d)

Building Appraisal

30.

You were commissioned to do a Master Plan. What should you do first?

a)

Study the existing laws

b)

Survey the location

c)

Coordinate with the local government for tracing of history

d)

Direct all department heads