PL M-01-02

Total questions: 50

Worksheet time: 47mins

Name
Class
Date
1.

What is number 1 in producing a site plan?

a)

Technical Team Assembled

b)

Key Issues Identified

c)

Client wants to develop a site

d)

Alternative Site Examined

2.

What is number 2 in producing a site plan?

a)

Technical Team Assembled

b)

Key Issues Identified

c)

Client wants to develop a site

d)

Alternative Site Examined

3.

What is number 3 in producing a site plan?

a)

Technical Team Assembled

b)

Key Issues Identified

c)

Client wants to develop a site

d)

Alternative Site Examined

4.

What is number 4 in producing a site plan?

a)

Technical Team Assembled

b)

Key Issues Identified

c)

Client wants to develop a site

d)

Alternative Site Examined

5.

What is number 5 in producing a site plan?

a)

Site Inventory and Assessment

b)

Discussions with local planners/stakeholders

c)

Present and Future Needs

d)

Site Potential Assessed

6.

What is number 6 in producing a site plan?

a)

Site Inventory and Assessment

b)

Discussions with local planners/stakeholders

c)

Present and Future Needs

d)

Site Potential Assessed

7.

What is number 7 in producing a site plan?

a)

Site Inventory and Assessment

b)

Discussions with local planners/stakeholders

c)

Present and Future Needs

d)

Site Potential Assessed

8.

What is number 8 in producing a site plan?

a)

Site Inventory and Assessment

b)

Discussions with local planners/stakeholders

c)

Present and Future Needs

d)

Site Potential Assessed

9.

What is number 9 in producing a site plan?

a)

Site Plan

b)

Alternative Development Concepts Examined

c)

Environmental Policies

d)

Planning approval Sought by Client

10.

What is number 10 in producing a site plan?

a)

Site Plan

b)

Alternative Development Concepts Examined

c)

Environmental Policies

d)

Planning approval Sought by Client

11.

What is number 11 in producing a site plan?

a)

Site Plan

b)

Alternative Development Concepts Examined

c)

Environmental Policies

d)

Planning approval Sought by Client

12.

What is number 12 in producing a site plan?

a)

Site Plan

b)

Alternative Development Concepts Examined

c)

Environmental Policies

d)

Planning approval Sought by Client

13.

What is number 13 in producing a site plan?

a)

Site Plan

b)

Design and site Management briefs developed

c)

Environmental Policies

d)

Planning approval Sought by Client

14.

Understanding the rocks and mineral structure of the earth's crust is vital in identifying the appropriate land use and determining the intensity of such use.

a)

Geology

b)

Geomorphology

c)

Hydrogeology

d)

Soils

15.

The thin layer of the earth's surface composed of a mixture of fragments of rocks, water, air and organic matter.

a)

Geology

b)

Geomorphology

c)

Hydrogeology

d)

Soils

16.

The National Structural Code of the Philippines prescribes a ___ to be done on a site for buildings (3) three storeys or more.

a)

Soil Test / Soil Analysis

b)

Soil Boring Test

c)

Soil Map

d)

Soil Erosion

17.

A ____ is required for taller buildings to determine soil bearing capacity and bedrock depth for piling purposes.

a)

Soil Test / Soil Analysis

b)

Soil Boring Test

c)

Soil Map

d)

Soil Erosion

18.

A ____ shows the spatial distribution of different soil classification units in a locality.

a)

Soil Test / Soil Analysis

b)

Soil Boring Test

c)

Soil Map

d)

Soil Erosion

19.

The degree of ___ is high when rainfall intensity is high, slope is long, and where vegetative cover is less, and no erosion control practices such as contour tilling, terracing, and the like are in place.

a)

Soil Test / Soil Analysis

b)

Soil Boring Test

c)

Soil Map

d)

Soil Erosion

20.

The rainwater that flows on the ground surface. It also collect and carries soil particles

a)

Runoff

b)

Bedrock

c)

Holes

d)

Leak

21.

The rainwater that flows on the ground surface. It also collect and carries soil particles

a)

Runoff

b)

Soil Boring Test

c)

Soil Map

d)

Soil Erosion

22.

No building is to be located on the direction of water flow as it will be prone to erosion and water flow will be directed towards the building.

a)

Yes

b)

No

c)

Maybe

d)

Depends

23.

What map can be used as a prepared based on the contour of the site if it is sloping, hilly or mountainous?

a)
Surface water run-off map
b)

Geological map

c)

Hydrogeologic Map

d)

Topographical Map

24.

What is not a method to control soil erosion?

a)

Use of geotextiles or coco coir

b)

Raprip

c)

Concrete retaining walls or mechanically stabilized earth (MSE) walls

d)

Revetment systems like articulated concrete blocks

25.

Refers to the different landforms occurring on the surface of the earth, such as mountains, plains, coastal areas, and the like.

a)

Physiography

b)

Hydrogeology

c)

Geomorphology

d)

Soils

26.

A branch of geology dealing with the origin and nature of landforms with emphasis on erosional processes.

a)

Physiography

b)

Hydrogeology

c)

Geomorphology

d)

Soils

27.

The description of landforms

a)

Physiography

b)

Hydrogeology

c)

Geomorphology

d)

Soils

28.

____ is a consolidated rock material lying at various depths below all points of the earth's surface.

a)

Geomorphology

b)

Rocks

c)

Bedrock

d)

Soils

29.

A minimum of ____ is prescribed by the National Structural Code by Philippines for a soil boring or soil and water sampling.

a)

6 boreholes

b)

2 boreholes

c)

3 boreholes

d)

5 boreholes

30.

The parent material from which soils are formed can be classified into igneous, sedimentary and metamorphic rocks.

a)

Igneous Rocks

b)

Rocks

c)

Sedimentary Rocks

d)

Metamorphic Rocks

31.

formed by cooling molten lava

a)

Igneous Rocks

b)

Rocks

c)

Sedimentary Rocks

d)

Metamorphic Rocks

32.

The hardened mixture of sediments and parts of other rock materials.

a)

Igneous Rocks

b)

Rocks

c)

Sedimentary Rocks

d)

Metamorphic Rocks

33.

Formed from pre-existing rocks as a result of heat or pressure changes in the earth's crust.

a)

Igneous Rocks

b)

Rocks

c)

Sedimentary Rocks

d)

Metamorphic Rocks

34.

A special purpose map made to show the arrangement of geologic features of a particular area; features can include such things as types of rocks, faults, minerals and groundwater.

a)

Geological map

b)

Topographical Map

c)

Surface water run-off map

d)

Hydrogeologic Map

35.

If a site is near a geologic fault line, constructions must also make way for a ___ buffer zone on both sides of an active fault according to PHILVOCS.

a)

3 Meters

b)

10 Meters

c)

5 Meters

d)

6 Meters

36.

Refers to the subsurface water or aquifer.

a)

Hydrology

b)

Hydrogeology

c)

Flood Plain

d)

Wetlands

37.

Are the water-bearing strata of rock, gravel, or sand in which groundwater is stored. It is a very valuable resource of potable water and must be protected from pollution.

a)

Aquifer Recharge Areas

b)

Swamplands

c)

Aquifer

d)

Wetlands

38.

Are the points where surface water meets or interchanges with an aquifer?

a)

Aquifer Recharge Areas

b)

Swamplands

c)

Aquifer

d)

Wetlands

39.

Map that is specially prepared to emphasize features of hydrogeologic importance.

a)
Hydrogeologic Map
b)

Surface water run-off map

c)

Geological Map

d)

Topographical Map

40.

This type of map brings basic geological information together with data on the hydraulic and hydrochemical characteristics of the rocks and their usefulness for groundwater supply.

a)

Soil Map

b)

Surface water run-off map

c)

Hydrogeologic Map

d)

Geological Map

41.

Indicates the area from which water is gathered to fill streams and rivers. In building adjacent to streams or rivers. In building adjacent to streams or rivers, detailed flood studies and special permits are necessary.

a)

Wetlands

b)

Swamplands

c)

Floodplain

d)

River Basin

42.

According to the Water Code of the Philippines the easement of rivers and streams in Urban Areas is ____.

a)

3 meters per side of waterway

b)

20 meters per side of waterway

c)

40 meters per side of waterway

d)

5 meters per side of waterway

43.

According to the Water Code of the Philippines the easement of rivers and streams in Agricultural Areas is ____.

a)

3 meters per side of waterway

b)

20 meters per side of waterway

c)

40 meters per side of waterway

d)

5 meters per side of waterway

44.

According to the Water Code of the Philippines the easement of rivers and streams in Forest Areas is ____.

a)

3 meters per side of waterway

b)

20 meters per side of waterway

c)

40 meters per side of waterway

d)

5 meters per side of waterway

45.

It is an area of land adjacent to a stream or river which stretches from the banks of its channel to the base of the enclosing valley walls, and which experiences flooding during periods of high discharge.

a)

River Basin

b)

Floodplains

c)

Wetlands

d)

Swamplands

46.

Shows areas susceptible to floods and flashfloods. It defines the areas which are at risk of flooding under extreme rainfall conditions. It defines the areas which are at risk of flooding under extreme rainfall conditions.

a)

Flood Hazard Map

b)

Surface water run-off map

c)

Hydrogeologic Map

d)

Geological Map

47.

Are areas that are covered by water or that have water-logged soils for long periods during the growing season.

a)

Wetlands

b)

Swamplands

c)

Floodplains

d)

River Basin

48.

It has very valuable natural functions and considered a protected area

a)
Wetlands
b)

Drylands

c)

Swamplands

d)

Marshlands

49.

Wet spongy lands saturated with water, supporting a natural vegetation predominantly of shrubs, trees and grass.

a)
Swamplands
b)

Wetlands

c)

Drylands

d)

Marshlands

50.

Are plants and animals that exist only in one geographic region

a)
Endemic Species
b)

Invasive Species

c)

Endangered Species

d)

Native Species