Mid-Assessment Exam Set A

Total questions: 40

Worksheet time: 11mins

Name
Class
Date
1.

A BOM can be used for which of the following?

a)

Costing

b)

Material Requirement Planning

c)

Sales and Distribution

d)

All of the above

2.

In SAP screen, in which screen element can you start applications directly by entering the transaction code?

a)

Menu bar

b)

Command Field

c)

Title bar

d)

Application tool bar

3.

What is the transaction code to Change Material Master?

a)

MM01

b)

CS01

c)

MM02

d)

CR02

4.

On transaction codes, the entry “/nex” does what?

a)

Cancels the current transaction c

b)

End the log-on session without a confirmation dialog box

c)

Deletes your current session

d)

Displays an overview of sessions

5.

Determines which business transaction should be executed for the object that belong to the task list or order.

a)

Control Key

b)

Routing

c)

Item Category

d)

Work Center

6.

In SAP PP, which of the following object is at the top of Organization Structure?

a)

Plant

b)

Company Code

c)

Sales Organization

d)

Storage Location

7.

Which key field is found in Work Scheduling view?

a)

Special Procurement Key

b)

Production Scheduling Profile

c)

MRP Controller

d)

Backflush Indicator

8.

An organizational unit allowing differentiation between various stock of a material in a plant.

a)

Storage Location

b)

Client

c)

Company Code

d)

Purchasing Organization

9.

What is the transaction code to change BOM?

a)

CA03

b)

CS02

c)

CS03

d)

CA02

10.

Which of the following deals with processes like demand planning, capacity levelling, material planning and production execution?

a)

Sales and Distribution

b)

Plant Maintenance

c)

Finance and Controlling

d)

Production Planning

11.

In SAP Production Planning, how many BOMs can be created as per Material Type?

a)

100

b)

50

c)

99

d)

79

12.

Once a department has created data for a material, the material master record exists in the database. If someone from another department wishes to enter data later, he or she does have not have to create the material master record from scratch, but only must extend the existing record by adding the information from their department.

a)

True

b)

False

13.

A Work Center is a machine or group of machines where production operations are performed.

a)

True

b)

False

14.

SAP PP process is related to production planning of a company and it encompasses all activities like MRP (Material Requirement Planning), BOM (Bill Of Materials), Routing, Capacity planning, etc.

a)

True

b)

False

15.

Bill of Material in SAP PP is referred to a list of activities which are required to produce any material.

a)

True

b)

False

16.

Routing is used for scheduling and costing of operation for raw and finished product.

a)

True

b)

False

17.

In Discrete Processing, the product is not changed for a long period of time.

a)

True

b)

False

18.

Production master data in production planning are performed at the company code level.

a)

True

b)

False

19.

SAP PP sub modules varies as per industry type like Discrete Processing, Repetitive Process or Process Industries.

a)

True

b)

False

20.

In Scheduling, you can schedule the operation in production order as per operating time in routing and formulas maintained in work center.

a)

True

b)

False

21.

To create routing, it is required that you must first define work center.

a)

True

b)

False

22.

Which of the following transaction code can be used to check PP tables in SAP ECC system?

a)

SE16N

b)

SE18

c)

SE20

d)

SE22

23.

In PP, which of the following is not a valid category for BOM?

a)

Material BOM

b)

Equipment BOM

c)

Costing BOM

d)

Inspection BOM

24.

Which of the following is not an SAP PP master data?

a)

BOM

b)

Material Master

c)

Storage Location

d)

Work Center

25.

Planned Order can be either converted to production order or purchase requisition.

a)

Yes

b)

No

c)

Maybe

26.

Procurement Type is what identifies a material or product as make or buy item.

a)

True

b)

False

27.

Procurement Type X means that material can be either purchased or produced.

a)

True

b)

False

28.

Special Procurement Key 60 is for phantom assemblies.

a)

True

b)

False

29.

MRP Type PD is for No Planning.

a)

True

b)

False

30.

Procurement Type I is for materials which are In-house Production.

a)

True

b)

False

31.

MRP Type ND is for No Planning.

a)

True

b)

False

32.

Item Category L is for stock items, meaning inventory is not being kept for these materials in the warehouse.

a)

True

b)

False

33.

Item Category N is for non-stock items, meaning inventory is being kept for these materials in the warehouse.

a)

True

b)

False

34.

Safety Stock is considered as (-) element in MD04.

a)

True

b)

False

35.

Customer Order is considered as (+) element in MD04.

a)

True

b)

False

36.

Plant can only have one Storage Location assigned to it.

a)

True

b)

False

37.

Plant can have multiple Storage Locations assigned to it.

a)

True

b)

False

38.

Manufacturing plants can do both functions - produce and distribute goods to end customers.

a)

True

b)

False

39.

Manufacturing Plants can serve as both Distribution Center and Production Plant at the same time.

a)

True

b)

False

40.

Production Order is a transactional data for purchasing items to suppliers and vendors.

a)

True

b)

False