CMT 210 Midterm Study Guide

Total questions: 35

Worksheet time: 35mins

Name
Class
Date
1.

When managing construction projects, separate management of each project is necessary.

a)

TRUE

b)

FALSE

2.

A good safety experience rating can create company-wide savings on workers' compensation premiums and insurance premiums.

a)

TRUE

b)

FALSE

3.

Cost control involves containing construction costs within the budget established by the cost estimate.

a)

TRUE

b)

FALSE

4.

The collection of actual, accurate construction costs can help managers create __________.

a)

more reliable schedules

b)

more effective safety programs

c)

more accurate estimates

d)

a subcontractor database

5.

The traditional project delivery system is also known as design-bid-build.

a)

TRUE

b)

FALSE

6.

The most common method for compensating the contractor for work completed in the traditional contract delivery system is ___________.

a)

lump-sum contract

b)

cost, plus a fee

c)

cost plus (GMP)

d)

unit price contract

7.

Normally, the project manager is more involved in the business and formal requirements of the contract, while the superintendent usually is associated with the activities regarding the construction of the facility.

a)

True

b)

False

8.

Municipality building codes supersede the contract documents.

a)

TRUE

b)

FALSE

9.

Codes and regulations are not formally included as construction documents.

a)

TRUE

b)

FALSE

10.

The Project Manual typically includes:

a)

site surveys

b)

equipment plans

c)

bid forms

d)

utility plans

11.

The _______________ are the base of reference for determining responsibility and liability for actions by owner and contractor during the project period.

a)

technical specifications

b)

conditions of the contract

c)

bid forms

d)

instructions to bidders

12.

Some common ____ include door, window, louver, and finish.

a)

site plans

b)

schedules

c)

building sections

d)

wall sections

13.

The _______ is used for tracking the actual progress of the submittal. 

Many contractors use this only for the dates the submittal was received by the appropriate parties.

a)

submittal log

b)

sample log

c)

product data submittal

d)

procurement schedule

14.

A ________ is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator. 

They are not produced by architects and engineers under their contract with the owner.

a)

shop drawing

b)

product data submittal

c)

sample

d)

procurement schedule

15.

The ___________ usually consists of the manufacturer's product information.

It includes size and physical characteristics, finish characteristics, and specific conditions for jobsite dimensions. 

a)

product data submittal

b)

shop drawing

c)

procurement schedule

d)

submittal log

16.

A ____________________ is a physical portion of the specified product and can be used to show material quality, composition, color, texture, etc. 

a)

sample

b)

product data submittal

c)

schedule

d)

submittal log

17.

When preparing for the project, the contractor begins the documentation process by keeping logs and schedules for product submittals.

a)

TRUE

b)

FALSE

18.

Compliance with most contractors' safety programs requires that all visitors to the jobsite be entered in the daily report.

a)

TRUE

b)

FALSE

19.

The current status of change orders should be discussed in _______.

a)

the daily report

b)

the progress meeting

c)

the personal diary

d)

the document control log

20.

A ____ log records revisions, with dates and reference-associated documents, such as change orders.

a)

document control

b)

subcontractor

c)

time-lapse

d)

progress

21.

Prior to beginning project construction, the contractor normally prepares a ____ that lists the types of material, the amount, the vendor, and the cost.

a)

purchase order

b)

bill of material

c)

letter of transmittal

d)

request for information (RFI)

22.

The ____ is a dated record of when a particular document or item was sent to another party.

a)

request for information (RFI)

b)

personal diary

c)

punch list

d)

letter of transmittal

23.

A request for information, or RFI, is typically sent from contractor to the____________.

a)

architect

b)

owner

c)

scheduler

d)

building inspector

24.

A company's safety program typically requires specific ____________.

a)

accident reports

b)

subcontractor logs

c)

progress photographs

d)

video recordings

25.

Project plans and schedules should be flexible and adjustable to account for potential problems and delays.

a)

True

b)

False

26.

Reporting and proper record keeping of past/current projects benefits project management by __________.

a)

increasing communication between the field and home office

b)

providing a basis for problem solving

c)

helping to compare/contrast existing personnel conditions to past projects

d)

all of the above

27.

In the traditional contract project delivery system, the owner executes a contract with an architect for __________.

a)

design of the project

b)

the production of construction documents

c)

administration at the beginning of the construction process

d)

all of the above

28.

Under the Construction Management Delivery System (Agency CM), the contracts for architects and contractors are written directly with the construction manager, not the owner.

a)

true

b)

false

29.

In this contract delivery system, the owner goes into contract with one business entity to manage both design and construction. This results in a high-value package for the owner.

a)

design-bid-build (traditional)

b)

agency CM

c)

design-build

d)

CM at-risk

30.

__________ are bulletins of additional information that are relevant to the contract documents issued during the bid period.

a)

change orders

b)

purchase orders

c)

addenda

d)

agencies

31.

The ____________________ contains information about the bid procedure.

a)

request for proposal

b)

instructions to bidders

c)

invitation to bid

d)

addendum

32.

A(n) ________ is a side view that shows height.

a)

elevation

b)

roof plan

c)

dimension

d)

foundation

33.

The information needed to identify lines and other symbols on a construction drawing can be found in the ________.

a)

index

b)

title block

c)

legend

d)

scale

34.

The scale of a floor plan is 1/8" = 1'-0".

What is the actual length of a wall that measures 2-3/4 inches (2.75") on the plan?

a)

22 feet

b)

36 feet

c)

18 feet

d)

40 feet

35.

Foundation plans are examples of ____________.

a)

architectural drawings

b)

mechanical drawings

c)

civil drawings

d)

structural drawings