WorksheetsCMT 210 Midterm Study Guide
Total questions: 35
Worksheet time: 35mins
When managing construction projects, separate management of each project is necessary.
TRUE
FALSE
A good safety experience rating can create company-wide savings on workers' compensation premiums and insurance premiums.
TRUE
FALSE
Cost control involves containing construction costs within the budget established by the cost estimate.
TRUE
FALSE
The collection of actual, accurate construction costs can help managers create __________.
more reliable schedules
more effective safety programs
more accurate estimates
a subcontractor database
The traditional project delivery system is also known as design-bid-build.
TRUE
FALSE
The most common method for compensating the contractor for work completed in the traditional contract delivery system is ___________.
lump-sum contract
cost, plus a fee
cost plus (GMP)
unit price contract
Normally, the project manager is more involved in the business and formal requirements of the contract, while the superintendent usually is associated with the activities regarding the construction of the facility.
True
False
Municipality building codes supersede the contract documents.
TRUE
FALSE
Codes and regulations are not formally included as construction documents.
TRUE
FALSE
The Project Manual typically includes:
site surveys
equipment plans
bid forms
utility plans
The _______________ are the base of reference for determining responsibility and liability for actions by owner and contractor during the project period.
technical specifications
conditions of the contract
bid forms
instructions to bidders
Some common ____ include door, window, louver, and finish.
site plans
schedules
building sections
wall sections
The _______ is used for tracking the actual progress of the submittal.
Many contractors use this only for the dates the submittal was received by the appropriate parties.
submittal log
sample log
product data submittal
procurement schedule
A ________ is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator.
They are not produced by architects and engineers under their contract with the owner.
shop drawing
product data submittal
sample
procurement schedule
The ___________ usually consists of the manufacturer's product information.
It includes size and physical characteristics, finish characteristics, and specific conditions for jobsite dimensions.
product data submittal
shop drawing
procurement schedule
submittal log
A ____________________ is a physical portion of the specified product and can be used to show material quality, composition, color, texture, etc.
sample
product data submittal
schedule
submittal log
When preparing for the project, the contractor begins the documentation process by keeping logs and schedules for product submittals.
TRUE
FALSE
Compliance with most contractors' safety programs requires that all visitors to the jobsite be entered in the daily report.
TRUE
FALSE
The current status of change orders should be discussed in _______.
the daily report
the progress meeting
the personal diary
the document control log
A ____ log records revisions, with dates and reference-associated documents, such as change orders.
document control
subcontractor
time-lapse
progress
Prior to beginning project construction, the contractor normally prepares a ____ that lists the types of material, the amount, the vendor, and the cost.
purchase order
bill of material
letter of transmittal
request for information (RFI)
The ____ is a dated record of when a particular document or item was sent to another party.
request for information (RFI)
personal diary
punch list
letter of transmittal
A request for information, or RFI, is typically sent from contractor to the____________.
architect
owner
scheduler
building inspector
A company's safety program typically requires specific ____________.
accident reports
subcontractor logs
progress photographs
video recordings
Project plans and schedules should be flexible and adjustable to account for potential problems and delays.
True
False
Reporting and proper record keeping of past/current projects benefits project management by __________.
increasing communication between the field and home office
providing a basis for problem solving
helping to compare/contrast existing personnel conditions to past projects
all of the above
In the traditional contract project delivery system, the owner executes a contract with an architect for __________.
design of the project
the production of construction documents
administration at the beginning of the construction process
all of the above
Under the Construction Management Delivery System (Agency CM), the contracts for architects and contractors are written directly with the construction manager, not the owner.
true
false
In this contract delivery system, the owner goes into contract with one business entity to manage both design and construction. This results in a high-value package for the owner.
design-bid-build (traditional)
agency CM
design-build
CM at-risk
__________ are bulletins of additional information that are relevant to the contract documents issued during the bid period.
change orders
purchase orders
addenda
agencies
The ____________________ contains information about the bid procedure.
request for proposal
instructions to bidders
invitation to bid
addendum
A(n) ________ is a side view that shows height.
elevation
roof plan
dimension
foundation
The information needed to identify lines and other symbols on a construction drawing can be found in the ________.
index
title block
legend
scale
The scale of a floor plan is 1/8" = 1'-0".
What is the actual length of a wall that measures 2-3/4 inches (2.75") on the plan?
22 feet
36 feet
18 feet
40 feet
Foundation plans are examples of ____________.
architectural drawings
mechanical drawings
civil drawings
structural drawings