wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Quality Quiz

Total questions: 24

Worksheet time: 13mins

Name
Class
Date
1.

When is World Quality Day celebrated Annually?

a)

A) 2nd Monday of November

b)

B) 2nd Thursday of November

c)

C) 1st Sunday of November

d)

D) None of these

2.

Which qualification is necessary to validate product line in manufacturing?

a)

A) SRG

b)

B) MNDA

c)

C) GE Commodity Codes

d)

D) GE Integrity

3.

What is RFS Clerence in GE.

a)

A) Release For Sales

b)

B) Rule For Soucing

c)

C) Rlease For Shipment

4.

What does ISO stand for?

a)

A) Individual Service Optimisation

b)

B) International Standards Organisation

c)

C) Internal Standards Offer

d)

D) None of these

5.

Which GE Tool is applicable for Quality Clearence of the product?

a)

A) MTA

b)

B) Quality Suite- SDR

c)

C) SDX

d)

D) SUMO

6.

The 5 "W" to be considered during a problem identification stage of Rootcause analysis are:

a)

A)Who,what,when, where & why

b)

B)Who,who,who, who & who

c)

C)Why,why,why, why,why

d)

D)Who,why,who, why,who

7.

Value Stream Mapping exercise begins with:

a)

A)Customer Specifications

b)

B)A consensus about how the process should be execuited

c)

C)A map of current status

d)

D)Best Practices Implementation

8.

Durng SDR Prepration if defect dected before manufacturing - Whic option supplier must select in "Is the defect created" tab.

a)

A) Yes

b)

B) No

9.

TheThere is a big difference between problem fixing and problem Solving. Fixing a problem eliminates the symptoms, not necessary the root causes.

a)

A) True

b)

B) False

10.

Equipment that has been mishandled, gives suspect results, is defective, or gives suspect results shall be ?

a)

A)Taken out of service

b)

B)Clearly marked as being out of service

c)

C)Decommissioned & discaded immediately

d)

D) A & B Only

11.

Which GE Tool is applicable for deviation approval?

a)

A) MTA

b)

B) Quality Suite - SDR

c)

C) SDX

d)

D) SUMO

12.

What does "Poka-yoke" literally means?

a)

A) Inspection Instruction

b)

B) Simplification

c)

C) Error Proofing

d)

D) None of these

13.

Calibration is the comparison of two measurement devices or systems (one of known uncertainty (your standard) and one of unknown uncertainty (your test equipment)

a)

A) True

b)

B) False

14.

What is Pareto law ?

a)

A) 80% of a problem is caused by 20% of the causes

b)

B) The first cause found for a problem is responsible of 80% of the problem

c)

C) You need to solve 80% of causes to decrease a problem by 20%

d)

D) None of the above

15.

What is the full form of FMEA?

a)

A)  Failure Mode and Effect Assessment

b)

B)  Failure Machine and Effect Analysis

c)

C) Failure Monthly Effect Analysis

d)

D) Failure Mode and Effect Analysis.

16.

Which major 6 ‘’M’’ to be considered during Fish bone diagram of RCA for Cause Identification?

a)

A) Man, Machine, Method, Material, Measurement, Mother Environment

b)

B) Make, Motion, Machine, Method, Material, Moral

c)

C) Major, Magic, Method, Material, Motion,Machine.

d)

D) None of the above

17.

What is the frequency of Instrument calibration?

a)

A) 6 months

b)

B) 1 Year

c)

C) 2 Years

d)

D) Depending upon use and criticality of the instrument.

18.

What is meant by SIPOC which is used for Process Description?

a)

A) Simplified -Input-Process-Optimized-Control

b)

B) Supplier-Input-Process-Output-Customer

c)

C) Supplier-Input-Program-Output-Control

d)

D) Simplified-Input-Process-Output-Control

19.

Which of the following is not one of the 7 wastes?

a)

A) inventory

b)

B) Movement

c)

C) Inventiveness

d)

D) Waiting

20.

ISO 9001:2015 is standard for which Management system?

a)

A) Quality

b)

B) Health & Safety

c)

c) Energy

d)

D) Environment

21.

Japanese word meaning “the actual place.” In lean practices, the word _________ refers to “the place where value is created,” such as the shop floor in manufacturing, the job site on a construction project.

a)

A) Kaizen

b)

B) Genba / Gemba

c)

C) Hoshin Kanri

d)

D) Non of these

22.

Action taken to eliminate the Root cause of a detected non conformity is called

a)

A)Correction

b)

B) Preventive Action

c)

C) Corrective Action

d)

D) Solution Definition

23.

Which instructions specifies measurement method?

a)

A) MPP

b)

B) CTQ

c)

C) Measurement Instructions

d)

D) ITPP

24.

What is Hoshin Kanri (HK)?

a)

A) Policy Development

b)

B) Policy Decision

c)

C) Policy Deployment

d)

D) All of these